Save $50 with code SYSTEM24When you purchase $250 or more of qualifying insertsSee details
compare

Filter by

System type
THIS FIRESTOP SELECTOR AND SUBMITTAL PAGE IS MOVING
Make the switch over to access the new firestop selector for planning, installing and managing firestop solutions

Try the new Hilti Construction Platform

Learn More
  • HW-D-0184

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
    Download English[ 105 kB ]
  • HW-D-0259

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to bottom of fire-proofed steel I-beam to concrete over metal deck (Max. JW=1-1/2")
    Download English[ 116.4 kB ]
  • HW-D-0264

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over fluted metal deck (top-of-wall) (offset flutes) (Max. JW=1-1/2")
    Download English[ 105.8 kB ]
  • HW-D-0292

    • Joint type: Head-of-Wall
    • Assembly rating: 4 Hour
    • Gypsum Wall to concrete over fluted metal roof deck (top-of-wall) (perpendicular) (Max. JW=1")
    Download English[ 26.7 kB ]
  • HW-D-0313

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over metal deck w/ spray-on fireproofing completely filling flutes and joint (top-of-wall) (Max. JW=3/4")
    Download English[ 117.1 kB ]
  • HW-D-0516

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=1")
    Download English[ 63.8 kB ]
  • HW-D-0528

    • Joint type: Head-of-Wall
    • Assembly rating: 1 Hour
    • Gypsum wall to insulated roof deck (top-of-wall) (Max. JW=2")
    Download English[ 600.1 kB ]
  • HW-D-0539

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete floor (top-of-wall) (Max. JW=1-1/2")
    Download English[ 104.5 kB ]
  • HW-D-0540

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=1-1/2")
    Download English[ 80.9 kB ]
  • HW-D-0605 (US Only)

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete or hollow core floor (with max. 2" CPVC pipe through joint) (top of wall) (Max. JW=1")
    Download English[ 98 kB ]
  • HW-D-0636

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum Shaft Wall to bottom of offset I beam with Z-bar extensions (Max. JW=1-1/2")
    Download English[ 120 kB ]
  • HW-D-0654

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete floor or hollow core (top-of-wall) (Max. JW=1")
    Download English[ 345.7 kB ]
  • HW-D-0687

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over metal deck (top of wall) (parallel)(cantilevered runner) (Max. JW=1-1/2")
    Download English[ 117.2 kB ]
  • BW-S-0002

    • Joint type: Bottom-of-Wall
    • Assembly rating: 4 Hour
    • Gypsum wall to Concrete floor (bottom-of-wall)
    Download English[ 88.2 kB ]
  • HI/JS 120-05 (CEJ 127P)

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Glass Spandrel Panel with Aluminum Framing (Max JW = 6")
    Download English[ 109.4 kB ]
  • HI/BP 120-07 (CEJ 244P)

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Concrete Panels with Steel Framing (Max. JW=8")
    Download English[ 360 kB ]
  • HI/BP 120-01 (CEJ 246P)

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Glass Spandrel Panel and Aluminum Framing (Max. JW=8")
    Download English[ 485.9 kB ]
  • HI/PHV 120-06 (CEJ 260P)

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Gypsum with Stucco Finish and Steel Framing (Max. JW=8")
    Download English[ 572 kB ]
  • HI/BP 180-02 (CEJ 308P)

    • Joint type: Curtain Wall
    • Assembly rating: 3 Hour
    • Glass Spandrel with I-shaped Aluminum Framing (Max. JW=8")
    Download English[ 651.4 kB ]
  • HI/BP 105-01 (CEJ 309P)

    • Joint type: Curtain Wall
    • Assembly rating: 1 Hour
    • Glass Spandrel with Aluminum Framing (Max. JW=8")
    Download English[ 610.1 kB ]
  • HI/BP 105-02 (CEJ 310P)

    • Joint type: Curtain Wall
    • Assembly rating: 1 Hour
    • Glass Spandrel with Aluminum Framing (I-shaped) (Max. JW=8")
    Download English[ 643.7 kB ]
  • HI/BP 120-03 (CEJ 421P)

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Gypsum wall with various facades (Max. JW=9", including studs)
    Download English[ 120.1 kB ]
  • CJ-D-0008 (US Only)

    • Joint type: Continuity Head-of-Wall
    • Assembly rating: 1 Hour
    • Gypsum Wall to non-rated insulated roof deck (Max. JW=2")
    Download English[ 610.3 kB ]
  • CW-S-2029

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Aluminum Spandrel Panel and Aluminum Framing (Max. JW=8")
    Download English[ 215.1 kB ]
  • CW-S-2032

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Granite Spandrel Panel and Aluminum Framing (Max. JW=8")
    Download English[ 115.4 kB ]
  • CW-S-2053

    • Joint type: Curtain Wall
    • Assembly rating: 2 Hour
    • Insulated Tilt-up Panel Curtain Wall (Max. JW=6")
    Download English[ 104.8 kB ]
  • FF-D-0052

    • Joint type: Floor-to-Floor
    • Assembly rating: 2 Hour
    • Concrete floor to floor joint (Max. JW=1/2")
    Download English[ 16.2 kB ]
  • FF-D-1026

    • Joint type: Floor-to-Floor
    • Assembly rating: 3 Hour
    • Concrete floor to floor joint (Max. JW=3")
    Download English[ 20.4 kB ]
  • FW-D-1012

    • Joint type: Floor-to-Wall
    • Assembly rating: 2 Hour
    • Concrete floor to wall joint (Max. JW=3-3/4")
    Download English[ 78.4 kB ]
  • FW-D-1013

    • Joint type: Floor-to-Wall
    • Assembly rating: 2 Hour
    • Concrete floor to wall joint (Max. JW=3-1/2")
    Download English[ 22.1 kB ]
  • FW-D-1021

    • Joint type: Floor-to-Wall
    • Assembly rating: 3 Hour
    • Concrete floor to wall joint (Max. JW=3")
    Download English[ 22.7 kB ]
  • FW-D-1046

    • Joint type: Floor-to-Wall
    • Assembly rating: 2 Hour
    • Concrete stair case to Concrete wall joint (Max. JW=3-3/4")
    Download English[ 83.3 kB ]
  • HW-D-0046

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
    Download English[ 109.7 kB ]
  • HW-D-0076

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall to concrete over fluted metal deck (top-of-wall) (castle cut, gypsum cut to profile) (Max. JW=3/4")
    Download English[ 87.4 kB ]
  • HW-D-0081

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
    Download English[ 102.2 kB ]
  • HW-D-0118

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall (with Fire Trak) to concrete over fluted metal deck (top-of-wall) (Max. JW=1")
    Download English[ 182.6 kB ]
  • HW-D-0119

    • Joint type: Head-of-Wall
    • Assembly rating: 3 Hour
    • Gypsum shaft wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (top-of-wall) (Max. JW=1")
    Download English[ 161.1 kB ]
  • HW-D-1012

    • Joint type: Head-of-Wall
    • Assembly rating: 3 Hour
    • Gypsum wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (Max. JW=3")
    Download English[ 128.6 kB ]
  • HW-D-1042

    • Joint type: Head-of-Wall
    • Assembly rating: 4 Hour
    • Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=2")
    Download English[ 244.2 kB ]
  • HW-D-1066 (US Only)

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall perpendicular to fluted metal deck (Max. JW=2-1/2")
    Download English[ 96.6 kB ]
  • HW-D-1067

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Gypsum wall parallel to fluted metal deck (Max. JW=2-1/2")
    Download English[ 30 kB ]
  • HW-D-1078

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Block wall to underside of flat concrete (Max. JW=3")
    Download English[ 79.6 kB ]
  • HW-S-0055

    • Joint type: Head-of-Wall
    • Assembly rating: 2 Hour
    • Concrete or block wall to concrete floor or hollow core concrete (Max. JW=0")
    Download English[ 16.6 kB ]
  • WW-D-0017

    • Joint type: Wall-to-Wall
    • Assembly rating: 2 Hour
    • Concrete wall to wall joint (Max. JW=2")
    Download English[ 78.5 kB ]
  • WW-D-0082

    • Joint type: Wall-to-Wall
    • Assembly rating: 2 Hour
    • Concrete wall to wall joint (Max. JW=1")
    Download English[ 17.8 kB ]
  • WW-D-1012

    • Joint type: Wall-to-Wall
    • Assembly rating: 2 Hour
    • Concrete wall to wall joint (Max. JW=3-3/4")
    Download English[ 79.8 kB ]
  • WW-D-1084

    • Joint type: Wall-to-Wall
    • Assembly rating: 2 Hour
    • Concrete wall to wall joint (Max. JW=3-1/2")
    Download English[ 74.4 kB ]
  • C-AJ-2630 (US Only)

    • Assembly rating: 2 Hour
    • Max. 4" PVC, ABS, CPVC, or FRPP (c,v) (2-1/2" concrete) (AS=0" to 3-1/2") (CP 643N Firestop Collar & CP 637 Firestop Mortar)
    Download English[ 26.7 kB ]
  • C-AJ-2647 (US Only)

    • Assembly rating: 2 Hour
    • Max. 2" PVC, CPVC, RNC, ENT and 1" PEX (closed only) (2-1/2" concrete) (AS=0" to 1-5/8")
    Download English[ 415.4 kB ]
  • C-AJ-3198

    • Assembly rating: 3 Hour
    • Cable bundle (750 kcmil power cables) (PVC sleeve) (AS=0" to 2-3/4") (CFS-BL Firestop Block & FS-ONE MAX)
    Download English[ 288.1 kB ]
  • C-AJ-3209

    • Assembly rating: 3 Hour
    • Cable bundle (various cables) (sleeve w/ welded flange)
    Download English[ 320.8 kB ]
  • C-AJ-3210

    • Assembly rating: 3 Hour
    • Cable bundle (various cables) (Steel sleeve optional) (Bottom side access) (AS=0" to 1")
    Download English[ 78.1 kB ]
  • C-AJ-3239

    • Assembly rating: 3 Hour
    • Cable bundle (various cables) (Steel sleeve optional) (bottom side access) (AS=0" to 2-1/2")
    Download English[ 394.5 kB ]
  • C-AJ-3281

    • Assembly rating: 2 Hour
    • Blank or cables through CP 653 Speed Sleeve (access both sides)
    Download English[ 81.7 kB ]
  • C-AJ-3282

    • Assembly rating: 2 Hour
    • Blank or cables through CP 653 Speed Sleeve with CP 637 Firestop Mortar
    Download English[ 79.1 kB ]
  • C-AJ-3283

    • Assembly rating: 2 Hour
    • Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (top side access)
    Download English[ 94.2 kB ]
  • C-AJ-3284

    • Assembly rating: 3 Hour
    • Blank or cables (various cables) through CP 653 Speed Sleeve (Bottom side access)
    Download English[ 81.6 kB ]
  • C-AJ-3298

    • Assembly rating: 2 Hour
    • Cable bundle (various cables) through CP 653 Speed Sleeve (T-rating with Thermal Ceramics or Unifrax Duct Wrap Insulation)
    Download English[ 88.7 kB ]
  • C-AJ-3318

    • Assembly rating: 2 Hour
    • Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
    Download English[ 119.2 kB ]
  • C-AJ-3319

    • Assembly rating: 2 Hour
    • Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
    Download English[ 402.1 kB ]
  • C-AJ-4017

    • Assembly rating: 3 Hour
    • Max. 24" x 4" Steel or Aluminum Open Ladder Cable Tray(s) (only one aluminum) (CP 637 Firestop Mortar)
    Download English[ 22.3 kB ]
  • C-AJ-4093

    • Assembly rating: 3 Hour
    • Max 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray(s) (CFS-BL Firestop Block) (AS varies)
    Download English[ 94.1 kB ]
  • C-AJ-4094

    • Assembly rating: 2 Hour
    • Max 36" x 6" Aluminum or Steel Open Ladder Cable Tray (CFS-BL Firestop Block) (AS=0 to 2-1/4")
    Download English[ 75.1 kB ]
  • C-AJ-5048

    • Assembly rating: 2 Hour
    • Max. 2" steel pipe with max. 1" glass fiber insulation with L-rating & PVC Jacket for W-rating (AS=11/16" to 3-1/16")
    Download English[ 140 kB ]
  • C-AJ-5090

    • Assembly rating: 3 Hour
    • Max. 4" steel or copper pipe with AB/PVC insulation (AS=1/2" to 12" for 2 HR, AS=1/2" to 1-1/2" for 3 HR) (Optional Steel Sleeve)
    Download English[ 84.2 kB ]
  • F-A-0040

    • Assembly rating: 3 Hour
    • Blank CFS-CID MD P Cast-In Device for Metal Deck with Min. 1" CP 618 Putty Stick or Min. 4" Mineral Wool (Min. 2-1/2" Concrete for 2 HR & Min. 4-1/2" Concrete for 3 HR)
    Download English[ 92 kB ]
  • C-AJ-5184

    • Assembly rating: 3 Hour
    • Max. 24" steel or Max. 6" copper pipe with max. 3" thick mineral fiber insulation (AS=1/2" to 1-1/2")
    Download English[ 78.4 kB ]
  • C-AJ-5198

    • Assembly rating: 2 Hour
    • Max. 4" steel or copper pipe with max. 3/4" AB/PVC insulation (2-1/2" concrete) (AS=0" to 1-3/8")
    Download English[ 339.1 kB ]
  • C-AJ-5301

    • Assembly rating: 2 Hour
    • Max. 6" steel, cast iron, or copper with Max. 2" glass fiber insulation (AS=0" to 1-7/8")
    Download English[ 302 kB ]
  • C-AJ-5343

    • Assembly rating: 2 Hour
    • Max. 4" steel, cast iron, or Max. 2" copper with 1/2" to 2" glass fiber insulation (optional steel sleeve) (AS = 1/4" to 1-1/8")
    Download English[ 299.1 kB ]
  • C-AJ-6017

    • Assembly rating: 3 Hour
    • Electrical busway (26" x 6") with FS-ONE MAX & Mineral Wool
    Download English[ 78.6 kB ]
  • W-L-2584 (US Only)

    • Assembly rating: 2 Hour
    • Max. 8" HDPE pipe (sch 40) (AS=Min. 1-1/4")
    Download English[ 89.4 kB ]
  • C-AJ-1140

    • Assembly rating: 3 Hour
    • Max. 12" steel, max. 4" copper, steel conduit or EMT pipe (one or more) (2-1/2" Concrete) (AS Varies) (CP 637 Firestop Mortar)
    Download English[ 78.3 kB ]
  • C-AJ-1150

    • Assembly rating: 3 Hour
    • Max. 6" steel, cast iron, steel conduit or max. 4" EMT pipe (AS=0" to 1-3/8")
    Download English[ 290.5 kB ]
  • C-AJ-1155

    • Assembly rating: 3 Hour
    • Max. 20" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 2-1/4" for 3 Hour, AS=0" to 12" for 2 Hour)
    Download English[ 142.5 kB ]
  • C-AJ-1226

    • Assembly rating: 3 Hour
    • Max. 30" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 1-7/8")
    Download English[ 383.1 kB ]
  • C-AJ-1276

    • Assembly rating: 3 Hour
    • Max. 4" steel, conduit, or EMT pipe (AS=3/4")
    Download English[ 18.7 kB ]
  • C-AJ-1277

    • Assembly rating: 3 Hour
    • Max. 2" steel, cast iron, conduit, or EMT pipe (AS=0" to 1-13/16")
    Download English[ 18.8 kB ]
  • C-AJ-1342

    • Assembly rating: 2 Hour
    • Max. 8" aluminum tubing (AS=1/2" to 1-1/2")
    Download English[ 282 kB ]
  • C-AJ-1372

    • Assembly rating: 3 Hour
    • Max. 8" steel or cast iron, max. 4" copper, conduit or EMT pipe (AS=0" to 1-7/8") (Optional Steel Sleeve)
    Download English[ 288.5 kB ]
  • C-AJ-1382

    • Assembly rating: 3 Hour
    • Max. 4" Copper, steel, cast iron, steel conduit or EMT (AS=0" to 5-7/8") (CP 620 Fire Foam & Mineral Wool)
    Download English[ 23.1 kB ]
  • C-AJ-1388

    • Assembly rating: 2 Hour
    • Max. 4" Steel conduit or EMT (Multiple in max 32" x 7" opening) (AS varies) (CP 620 Fire Foam)
    Download English[ 29.9 kB ]
  • C-AJ-1421

    • Assembly rating: 3 Hour
    • Max. 4" steel, cast iron, copper, steel conduit or EMT (Optional sleeve) (AS=0" to 5-3/8")
    Download English[ 344.4 kB ]
  • C-AJ-1425

    • Assembly rating: 3 Hour
    • Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 1-7/8")
    Download English[ 76.2 kB ]
  • C-AJ-1449

    • Assembly rating: 3 Hour
    • Max. 12" steel, cast iron, max. 6" conduit, max. 4" copper or EMT (AS=0" to 5-1/4") (CP 620 Fire Foam & Mineral Wool)
    Download English[ 22.6 kB ]
  • C-AJ-1498

    • Assembly rating: 2 Hour
    • Max. 8" steel, cast iron, 6" steel conduit, 4" EMT or copper (optional sleeve) (AS=0" to 2")
    Download English[ 379.1 kB ]
  • C-AJ-2098 (US Only)

    • Assembly rating: 3 Hour
    • Max. 2" ENT (closed system only) (AS=5/16")
    Download English[ 82.6 kB ]
  • C-AJ-2141 (US Only)

    • Assembly rating: 3 Hour
    • Max. 3" PVC (closed system only) (AS=1/2" to 2") (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
    Download English[ 82.5 kB ]
  • C-AJ-2164 (US Only)

    • Assembly rating: 2 Hour
    • Max. 1-1/2" PVC (AS=9/16") (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
    Download English[ 80.8 kB ]
  • C-AJ-2168 (US Only)

    • Assembly rating: 3 Hour
    • Max. 3" PVC (closed or open) (AS=1/2" to 1") (FS-ONE MAX only)
    Download English[ 73.9 kB ]
  • C-AJ-2169 (US Only)

    • Assembly rating: 2 Hour
    • Max. 2" PVC or RNC (AS=1/2" to 1-3/8") (Sleeve Optional) (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
    Download English[ 82.4 kB ]
  • C-AJ-2170 (US Only)

    • Assembly rating: 2 Hour
    • Max. 1" Polyethylene (PEX) SDR 9 Tubing (closed or open) (AS=1/4" to 3/4") (FS-ONE MAX only)
    Download English[ 75.6 kB ]
  • C-AJ-2218

    • Assembly rating: 2 Hour
    • Max. 3" PVC or CPVC (closed or open) (AS=1/2" to 1") (Min. 3-1/2" FS-ONE MAX only)
    Download English[ 236.8 kB ]
  • C-AJ-2234 (US Only)

    • Assembly rating: 2 Hour
    • Nom. 6" PVC and max. 2" PVDF plastic pipe (Qty. 1) and max. 1" PVDF plastic pipe (Qty. 3) (double-contained) (AS=0" to 1/2")
    Download English[ 340.8 kB ]
  • C-AJ-2271 (US Only)

    • Assembly rating: 2 Hour
    • Max. 6" PVC , ABS, FRPP, or CPVC (AS=0" to 1/2") (Min. 2-1/2" concrete)
    Download English[ 439.4 kB ]
  • C-AJ-2284 (US Only)

    • Assembly rating: 2 Hour
    • Max. 10" PVC and max. 2" PVDF plastic pipe (closed system) (double-contained) (AS=0" to 1-3/8") (CP 644 Firestop Collar, FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
    Download English[ 81.9 kB ]
  • C-AJ-2336 (US Only)

    • Assembly rating: 3 Hour
    • Max. 4" PVC, CPVC, ABS, or FRPP with optional coupler (closed or open) (CP 648E & retaining collar)
    Download English[ 412.9 kB ]
  • C-AJ-2402 (US Only)

    • Assembly rating: 3 Hour
    • Multiple Max. 2" and 1-1/4" ENT's (Max Qty 3 of each, Total Max Qty 6) (Includes Hollow Core) (AS varies)
    Download English[ 100.6 kB ]
  • C-AJ-2419 (US Only)

    • Assembly rating: 3 Hour
    • Max. 4" PVC, ABS, CPVC (AS=3/4") (Bottom access) (CP 648E wrap insert & FS-ONE MAX)
    Download English[ 337.5 kB ]
  • C-AJ-2451 (US Only)

    • Assembly rating: 3 Hour
    • Max. 2" Flowguard Gold or 3" Blazemaster CPVC pipe (closed) (AS=1/4" to 1-1/4")
    Download English[ 263.6 kB ]
  • C-AJ-2469 (US Only)

    • Assembly rating: 2 Hour
    • Max. 6" CPVC (Sch 80) Closed piping system (AS=0" to 3/8")
    Download English[ 89.7 kB ]
  • C-AJ-2488 (US Only)

    • Assembly rating: 2 Hour
    • Max. 4" ABS, PVC, or CPVC (closed or open) (CP 648S wrap insert & sealant)
    Download English[ 323.5 kB ]
  • C-AJ-2570 (US Only)

    • Assembly rating: 2 Hour
    • Nom. 6" PVC, CPVC, or RNC (closed or open) (A=1/2" to 1") (CP 648S wrap insert & retaining collar)
    Download English[ 346.7 kB ]
  • C-AJ-2599 (US Only)

    • Assembly rating: 2 Hour
    • Max. 5" Fusiotherm or 4" Polystar PP plastic pipe (mfd. by Aquatherm or Orion) (closed or vented) (AS=0" to 1") (Includes Hollow-Core)
    Download English[ 358.4 kB ]
  • C-AJ-2600 (US Only)

    • Assembly rating: 2 Hour
    • Max. 2" Fusiotherm PP plastic pipe (closed or vented) (AS=0" to 5/8") (Includes Hollow-Core)
    Download English[ 343 kB ]
  • W-J-0006

    • Assembly rating: 2 Hour
    • Max. 30" x 15" blank opening with CP 620 Firestop Foam
    Download English[ 20 kB ]
  • W-J-0022

    • Assembly rating: 2 Hour
    • Max. 2-1/2" dia or 2" x 2" blank opening
    Download English[ 143.1 kB ]
  • W-J-1028

    • Assembly rating: 2 Hour
    • Max. 10" steel, max. 4" copper, conduit or EMT pipe (AS=1/2" to 7/8")
    Download English[ 239 kB ]
  • W-J-1042

    • Assembly rating: 4 Hour
    • Max. 12" steel, max. 6" copper, conduit or max. 4" EMT (4 Hour) (AS=3/8" to 1/2")
    Download English[ 216.6 kB ]
  • C-AJ-7095

    • Assembly rating: 2 Hour
    • Steel air duct with 1-1/2" thick FireMaster FireWrap+ Mfd. by Thermal Ceramics (AS=3")
    Download English[ 293.3 kB ]
  • C-AJ-7098

    • Assembly rating: 2 Hour
    • Max. 49" x 49" steel grease duct with 1-1/2" Firemaster® Fast Wrap Mfd. by Thermal Ceramics (AS=1/2" to 4-3/4")
    Download English[ 226.8 kB ]
  • C-AJ-7122

    • Assembly rating: 2 Hour
    • Max. 24" x 12" steel air or grease duct with one layer 1-1/2" Duct Wrap by Unifrax (AS=1-1/4" to 1-3/4")
    Download English[ 316.1 kB ]
  • C-AJ-7145

    • Assembly rating: 2 Hour
    • Max. 60" x 36" sheet metal duct with 2" glass fiber duct insulation compressed through opening (AS varies)
    Download English[ 398.1 kB ]
  • C-AJ-8058

    • Assembly rating: 2 Hour
    • Multiple insulated and non-insulated copper pipe, max. 1-1/2" PVC (open or closed) and cables (2-1/2" concrete) (HVAC Line Set)
    Download English[ 388.3 kB ]
  • C-AJ-8096

    • Assembly rating: 2 Hour
    • Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, flexible metal conduit, max 4" PVC or cables (single or bundled) (CP 620 Fire Foam)
    Download English[ 62.4 kB ]
  • C-AJ-8148

    • Assembly rating: 2 Hour
    • HVAC line set (optional sleeve) (Includes Hollow-Core)
    Download English[ 456 kB ]
  • C-AJ-8178

    • Assembly rating: 2 Hour
    • HVAC line set w/ PVC drain (CP 643N Firestop Collar) (Includes Hollow-Core)
    Download English[ 571.2 kB ]
  • C-AJ-8180

    • Assembly rating: 2 Hour
    • Insulated or non-insulated copper or steel, cables (single or bundled), or flexible steel conduit (AS Varies) (CP 620 Fire Foam & Mineral Wool)
    Download English[ 32.8 kB ]
  • C-AJ-8208

    • Assembly rating: 3 Hour
    • Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
    Download English[ 553.6 kB ]
  • C-AJ-8210

    • Assembly rating: 3 Hour
    • Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
    Download English[ 553.8 kB ]
  • C-BJ-1049

    • Assembly rating: 2 Hour
    • Max. 4" steel, cast iron, steel conduit, or EMT (multiple pipes) (CP 637 Firestop Mortar) (AS=1/2" to 12")
    Download English[ 30.4 kB ]
  • C-BJ-2013 (US Only)

    • Assembly rating: 2 Hour
    • Max. 2" PVC or CPVC (AS=5/16") (Hollow Core) (CP 648E or CP 648S wrap insert & sealant)
    Download English[ 361.6 kB ]
  • C-BJ-2041 (US Only)

    • Assembly rating: 3 Hour
    • Bundle of max. 1" PEX (c) (max. qty = 6) (Hollow Core) (AS=1/4" to 1-1/4")
    Download English[ 77.7 kB ]
  • C-BJ-3031

    • Assembly rating: 4 Hour
    • Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
    Download English[ 117.2 kB ]
  • C-BJ-3032

    • Assembly rating: 4 Hour
    • Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
    Download English[ 151.3 kB ]
  • C-BJ-5006

    • Assembly rating: 4 Hour
    • Max. 20" steel with max. 3" Glass Fiber insulation & 3" Mineral fiber insulation (AS=1" to 2-1/4")
    Download English[ 94.1 kB ]
  • C-BJ-5013

    • Assembly rating: 2 Hour
    • Max. 4" steel or copper with Nom. 1" glass fiber insulation (Hollow Core) (AS=0" to 7/8")
    Download English[ 75.4 kB ]
  • C-BJ-8013

    • Assembly rating: 2 Hour
    • Max. 20 wide Cable Rack (Telecom) (AS= Min. 1")
    Download English[ 496.4 kB ]
  • C-BJ-8014

    • Assembly rating: 2 Hour
    • Max. 20 wide Cable Rack (Telecom)
    Download English[ 39.9 kB ]
  • F-A-0005