-
HW-D-0184
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0259
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to bottom of fire-proofed steel I-beam to concrete over metal deck (Max. JW=1-1/2")
-
HW-D-0264
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (offset flutes) (Max. JW=1-1/2")
-
HW-D-0292
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Gypsum Wall to concrete over fluted metal roof deck (top-of-wall) (perpendicular) (Max. JW=1")
-
HW-D-0313
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ spray-on fireproofing completely filling flutes and joint (top-of-wall) (Max. JW=3/4")
-
HW-D-0516
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=1")
-
HW-D-0528
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to insulated roof deck (top-of-wall) (Max. JW=2")
-
HW-D-0539
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (top-of-wall) (Max. JW=1-1/2")
-
HW-D-0540
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=1-1/2")
-
HW-D-0605 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete or hollow core floor (with max. 2" CPVC pipe through joint) (top of wall) (Max. JW=1")
-
HW-D-0636
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Shaft Wall to bottom of offset I beam with Z-bar extensions (Max. JW=1-1/2")
-
HW-D-0654
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor or hollow core (top-of-wall) (Max. JW=1")
-
HW-D-0687
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top of wall) (parallel)(cantilevered runner) (Max. JW=1-1/2")
-
BW-S-0002
- Joint type: Bottom-of-Wall
- Assembly rating: 4 Hour
- Gypsum wall to Concrete floor (bottom-of-wall)
-
HI/JS 120-05 (CEJ 127P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Aluminum Framing (Max JW = 6")
-
HI/BP 120-07 (CEJ 244P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Concrete Panels with Steel Framing (Max. JW=8")
-
HI/BP 120-01 (CEJ 246P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel and Aluminum Framing (Max. JW=8")
-
HI/PHV 120-06 (CEJ 260P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Stucco Finish and Steel Framing (Max. JW=8")
-
HI/BP 180-02 (CEJ 308P)
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Glass Spandrel with I-shaped Aluminum Framing (Max. JW=8")
-
HI/BP 105-01 (CEJ 309P)
- Joint type: Curtain Wall
- Assembly rating: 1 Hour
- Glass Spandrel with Aluminum Framing (Max. JW=8")
-
HI/BP 105-02 (CEJ 310P)
- Joint type: Curtain Wall
- Assembly rating: 1 Hour
- Glass Spandrel with Aluminum Framing (I-shaped) (Max. JW=8")
-
HI/BP 120-03 (CEJ 421P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum wall with various facades (Max. JW=9", including studs)
-
CJ-D-0008 (US Only)
- Joint type: Continuity Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum Wall to non-rated insulated roof deck (Max. JW=2")
-
CW-S-2029
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Aluminum Spandrel Panel and Aluminum Framing (Max. JW=8")
-
CW-S-2032
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Granite Spandrel Panel and Aluminum Framing (Max. JW=8")
-
CW-S-2053
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Insulated Tilt-up Panel Curtain Wall (Max. JW=6")
-
FF-D-0052
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max. JW=1/2")
-
FF-D-1026
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint (Max. JW=3")
-
FW-D-1012
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max. JW=3-3/4")
-
FW-D-1013
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max. JW=3-1/2")
-
FW-D-1021
- Joint type: Floor-to-Wall
- Assembly rating: 3 Hour
- Concrete floor to wall joint (Max. JW=3")
-
FW-D-1046
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete stair case to Concrete wall joint (Max. JW=3-1/2")
-
HW-D-0046
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0076
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (castle cut, gypsum cut to profile) (Max. JW=3/4")
-
HW-D-0081
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0118
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck (top-of-wall) (Max. JW=1")
-
HW-D-0119
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum shaft wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (top-of-wall) (Max. JW=1")
-
HW-D-1012
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (Max. JW=3")
-
HW-D-1042
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=2")
-
HW-D-1066 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall perpendicular to fluted metal deck (Max. JW=2-1/2")
-
HW-D-1067
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall parallel to fluted metal deck (Max. JW=2-1/2")
-
HW-D-1078
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Block wall to underside of flat concrete (Max. JW=3")
-
HW-S-0055
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor or hollow core concrete (Max. JW=0")
-
WW-D-0017
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=2")
-
WW-D-0082
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=1")
-
WW-D-1012
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=3-3/4")
-
WW-D-1084
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=3-1/2")
-
C-AJ-2630 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, ABS, CPVC, or FRPP (c,v) (2-1/2" concrete) (AS=0" to 3-1/2") (CP 643N Firestop Collar & CP 637 Firestop Mortar)
-
C-AJ-2647 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, RNC, ENT and 1" PEX (closed only) (2-1/2" concrete) (AS=0" to 1-5/8")
-
C-AJ-3198
- Assembly rating: 3 Hour
- Cable bundle (750 kcmil power cables) (PVC sleeve) (AS=0" to 2-3/4") (CFS-BL Firestop Block & FS-ONE MAX)
-
C-AJ-3209
- Assembly rating: 3 Hour
- Cable bundle (various cables) (sleeve w/ welded flange)
-
C-AJ-3210
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional) (Bottom side access) (AS=0" to 1")
-
C-AJ-3239
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional) (bottom side access) (AS=0" to 2-1/2")
-
C-AJ-3281
- Assembly rating: 2 Hour
- Blank or cables through CP 653 Speed Sleeve (access both sides)
-
C-AJ-3282
- Assembly rating: 2 Hour
- Blank or cables through CP 653 Speed Sleeve with CP 637 Firestop Mortar
-
C-AJ-3283
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (top side access)
-
C-AJ-3284
- Assembly rating: 3 Hour
- Blank or cables (various cables) through CP 653 Speed Sleeve (Bottom side access)
-
C-AJ-3298
- Assembly rating: 2 Hour
- Cable bundle (various cables) through CP 653 Speed Sleeve (T-rating with Thermal Ceramics or Unifrax Duct Wrap Insulation)
-
C-AJ-3318
- Assembly rating: 2 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-AJ-3319
- Assembly rating: 2 Hour
- Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-AJ-4017
- Assembly rating: 3 Hour
- Max. 24" x 4" Steel or Aluminum Open Ladder Cable Tray(s) (only one aluminum) (CP 637 Firestop Mortar)
-
C-AJ-4093
- Assembly rating: 3 Hour
- Max 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray(s) (CFS-BL Firestop Block) (AS varies)
-
C-AJ-4094
- Assembly rating: 2 Hour
- Max 36" x 6" Aluminum or Steel Open Ladder Cable Tray (CFS-BL Firestop Block) (AS=0 to 2-1/4")
-
C-AJ-5048
- Assembly rating: 2 Hour
- Max. 2" steel pipe with max. 1" glass fiber insulation with L-rating & PVC Jacket for W-rating (AS=11/16" to 3-1/16")
-
C-AJ-5090
- Assembly rating: 3 Hour
- Max. 4" steel or copper pipe with AB/PVC insulation (AS=1/2" to 12" for 2 HR, AS=1/2" to 1-1/2" for 3 HR) (Optional Steel Sleeve)
-
F-A-0040
- Assembly rating: 3 Hour
- Blank CFS-CID MD P Cast-In Device for Metal Deck with Min. 1" CP 618 Putty Stick or Min. 4" Mineral Wool (Min. 2-1/2" Concrete for 2 HR & Min. 4-1/2" Concrete for 3 HR)
-
C-AJ-5184
- Assembly rating: 3 Hour
- Max. 24" steel or Max. 6" copper pipe with max. 3" thick mineral fiber insulation (AS=1/2" to 1-1/2")
-
C-AJ-5198
- Assembly rating: 2 Hour
- Max. 4" steel or copper pipe with max. 3/4" AB/PVC insulation (2-1/2" concrete) (AS=0" to 1-3/8")
-
C-AJ-5301
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, or copper with Max. 2" glass fiber insulation (AS=0" to 1-7/8")
-
C-AJ-5343
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or Max. 2" copper with 1/2" to 2" glass fiber insulation (optional steel sleeve) (AS = 1/4" to 1-1/8")
-
C-AJ-6017
- Assembly rating: 3 Hour
- Electrical busway (26" x 6") with FS-ONE MAX & Mineral Wool
-
W-L-2584 (US Only)
- Assembly rating: 2 Hour
- Max. 8" HDPE pipe (sch 40) (AS=Min. 1-1/4")
-
C-AJ-1140
- Assembly rating: 3 Hour
- Max. 12" steel, max. 4" copper, steel conduit or EMT pipe (one or more) (2-1/2" Concrete) (AS Varies) (CP 637 Firestop Mortar)
-
C-AJ-1150
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, steel conduit or max. 4" EMT pipe (AS=0" to 1-3/8")
-
C-AJ-1155
- Assembly rating: 3 Hour
- Max. 20" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 2-1/4" for 3 Hour, AS=0" to 12" for 2 Hour)
-
C-AJ-1226
- Assembly rating: 3 Hour
- Max. 30" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 1-7/8")
-
C-AJ-1276
- Assembly rating: 3 Hour
- Max. 4" steel, conduit, or EMT pipe (AS=3/4")
-
C-AJ-1277
- Assembly rating: 3 Hour
- Max. 2" steel, cast iron, conduit, or EMT pipe (AS=0" to 1-13/16")
-
C-AJ-1342
- Assembly rating: 2 Hour
- Max. 8" aluminum tubing (AS=1/2" to 1-1/2")
-
C-AJ-1372
- Assembly rating: 3 Hour
- Max. 8" steel or cast iron, max. 4" copper, conduit or EMT pipe (AS=0" to 1-7/8") (Optional Steel Sleeve)
-
C-AJ-1382
- Assembly rating: 3 Hour
- Max. 4" Copper, steel, cast iron, steel conduit or EMT (AS=0" to 5-7/8") (CP 620 Fire Foam & Mineral Wool)
-
C-AJ-1388
- Assembly rating: 2 Hour
- Max. 4" Steel conduit or EMT (Multiple in max 32" x 7" opening) (AS varies) (CP 620 Fire Foam)
-
C-AJ-1421
- Assembly rating: 3 Hour
- Max. 4" steel, cast iron, copper, steel conduit or EMT (Optional sleeve) (AS=0" to 5-3/8")
-
C-AJ-1425
- Assembly rating: 3 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 1-7/8")
-
C-AJ-1449
- Assembly rating: 3 Hour
- Max. 12" steel, cast iron, max. 6" conduit, max. 4" copper or EMT (AS=0" to 5-1/4") (CP 620 Fire Foam & Mineral Wool)
-
C-AJ-1498
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, 6" steel conduit, 4" EMT or copper (optional sleeve) (AS=0" to 2")
-
C-AJ-2098 (US Only)
- Assembly rating: 3 Hour
- Max. 2" ENT (closed system only) (AS=9/16")
-
C-AJ-2141 (US Only)
- Assembly rating: 3 Hour
- Max. 3" PVC (closed system only) (AS=1/2" to 2") (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2164 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" PVC (AS=9/16") (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2168 (US Only)
- Assembly rating: 3 Hour
- Max. 3" PVC (closed or open) (AS=1/2" to 1") (FS-ONE MAX only)
-
C-AJ-2169 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or RNC (AS=1/2" to 1-3/8") (Sleeve Optional) (FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2170 (US Only)
- Assembly rating: 2 Hour
- Max. 1" Polyethylene (PEX) SDR 9 Tubing (closed or open) (AS=1/4" to 3/4") (FS-ONE MAX only)
-
C-AJ-2218
- Assembly rating: 2 Hour
- Max. 3" PVC or CPVC (closed or open) (AS=1/2" to 1") (Min. 3-1/2" FS-ONE MAX only)
-
C-AJ-2234 (US Only)
- Assembly rating: 2 Hour
- Nom. 6" PVC and max. 2" PVDF plastic pipe (Qty. 1) and max. 1" PVDF plastic pipe (Qty. 3) (double-contained) (AS=0" to 1/2")
-
C-AJ-2271 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC , ABS, FRPP, or CPVC (AS=0" to 1/2") (Min. 2-1/2" concrete)
-
C-AJ-2284 (US Only)
- Assembly rating: 2 Hour
- Max. 10" PVC and max. 2" PVDF plastic pipe (closed system) (double-contained) (AS=0" to 1-3/8") (CP 644 Firestop Collar, FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2336 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, CPVC, ABS, or FRPP with optional coupler (closed or open) (CP 648E & retaining collar)
-
C-AJ-2402 (US Only)
- Assembly rating: 3 Hour
- Multiple Max. 2" and 1-1/4" ENT's (Max Qty 3 of each, Total Max Qty 6) (Includes Hollow Core) (AS varies)
-
C-AJ-2419 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, ABS, CPVC (AS=3/4") (Bottom access) (CP 648E wrap insert & FS-ONE MAX)
-
C-AJ-2451 (US Only)
- Assembly rating: 3 Hour
- Max. 2" Flowguard Gold or 3" Blazemaster CPVC pipe (closed) (AS=1/4" to 1-1/4")
-
C-AJ-2469 (US Only)
- Assembly rating: 2 Hour
- Max. 6" CPVC (Sch 80) Closed piping system (AS=0" to 3/8")
-
C-AJ-2488 (US Only)
- Assembly rating: 2 Hour
- Max. 4" ABS, PVC, or CPVC (closed or open) (CP 648S wrap insert & sealant)
-
C-AJ-2570 (US Only)
- Assembly rating: 2 Hour
- Nom. 6" PVC, CPVC, or RNC (closed or open) (A=1/2" to 1") (CP 648S wrap insert & retaining collar)
-
C-AJ-2599 (US Only)
- Assembly rating: 2 Hour
- Max. 5" Fusiotherm or 4" Polystar PP plastic pipe (mfd. by Aquatherm or Orion) (closed or vented) (AS=0" to 1") (Includes Hollow-Core)
-
C-AJ-2600 (US Only)
- Assembly rating: 2 Hour
- Max. 2" Fusiotherm PP plastic pipe (closed or vented) (AS=0" to 5/8") (Includes Hollow-Core)
-
W-J-0006
- Assembly rating: 2 Hour
- Max. 30" x 15" blank opening with CP 620 Firestop Foam
-
W-J-0022
- Assembly rating: 2 Hour
- Max. 2-1/2" dia or 2" x 2" blank opening
-
W-J-1028
- Assembly rating: 2 Hour
- Max. 10" steel, max. 4" copper, conduit or EMT pipe (AS=1/2" to 7/8")
-
W-J-1042
- Assembly rating: 4 Hour
- Max. 12" steel, max. 6" copper, conduit or max. 4" EMT (4 Hour) (AS=3/8" to 1/2")
-
C-AJ-7095
- Assembly rating: 2 Hour
- Steel air duct with 1-1/2" thick FireMaster FireWrap+ Mfd. by Thermal Ceramics (AS=3")
-
C-AJ-7098
- Assembly rating: 2 Hour
- Max. 49" x 49" steel grease duct with 1-1/2" Firemaster® Fast Wrap Mfd. by Thermal Ceramics (AS=1/2" to 4-3/4")
-
C-AJ-7122
- Assembly rating: 2 Hour
- Max. 24" x 12" steel air or grease duct with one layer 1-1/2" Duct Wrap by Unifrax (AS=1-1/4" to 1-3/4")
-
C-AJ-7145
- Assembly rating: 2 Hour
- Max. 60" x 36" sheet metal duct with 2" glass fiber duct insulation compressed through opening (AS varies)
-
C-AJ-8058
- Assembly rating: 2 Hour
- Multiple insulated and non-insulated copper pipe, max. 1-1/2" PVC (open or closed) and cables (2-1/2" concrete) (HVAC Line Set)
-
C-AJ-8096
- Assembly rating: 2 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, flexible metal conduit, max 4" PVC or cables (single or bundled) (CP 620 Fire Foam)
-
C-AJ-8148
- Assembly rating: 2 Hour
- HVAC line set (optional sleeve) (Includes Hollow-Core)
-
C-AJ-8178
- Assembly rating: 2 Hour
- HVAC line set w/ PVC drain (CP 643N Firestop Collar) (Includes Hollow-Core)
-
C-AJ-8180
- Assembly rating: 2 Hour
- Insulated or non-insulated copper or steel, cables (single or bundled), or flexible steel conduit (AS Varies) (CP 620 Fire Foam & Mineral Wool)
-
C-AJ-8208
- Assembly rating: 3 Hour
- Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
-
C-AJ-8210
- Assembly rating: 3 Hour
- Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
-
C-BJ-1045
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe (Hollow-Core) (AS=0" to 7/8")
-
C-BJ-1049
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, or EMT (multiple pipes) (CP 637 Firestop Mortar) (AS=1/2" to 12")
-
C-BJ-2013 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=5/16") (Hollow Core) (CP 648E or CP 648S wrap insert & sealant)
-
C-BJ-2041 (US Only)
- Assembly rating: 3 Hour
- Bundle of max. 1" PEX (c) (max. qty = 6) (Hollow Core) (AS=1/4" to 1-1/4")
-
C-BJ-3031
- Assembly rating: 4 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-BJ-3032
- Assembly rating: 4 Hour
- Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-BJ-5006
- Assembly rating: 4 Hour
- Max. 20" steel with max. 3" Glass Fiber insulation & 3" Mineral fiber insulation (AS=1" to 2-1/4")
-
C-BJ-5013
- Assembly rating: 2 Hour
- Max. 4" steel or copper with Nom. 1" glass fiber insulation (Hollow Core) (AS=0" to 7/8")
-
C-BJ-8013
- Assembly rating: 2 Hour
- Max. 20 wide Cable Rack (Telecom) (AS= Min. 1")
-
C-BJ-8014
- Assembly rating: 2 Hour
- Max. 20 wide Cable Rack (Telecom)
-
F-A-0005
- Assembly rating: 2 Hour
- Blank CP 680-P or PX Cast-In Device with Min 1" CP 618 Firestop Putty (Min 2-1/2" Concrete)
-
F-A-0006
- Assembly rating: 3 Hour
- Blank CP 680-P or PX Cast-In Device with Min 1" CP 618 Firestop Putty or Min 4" Mineral Wool (Min 4-1/2" Concrete)
-
F-A-0012
- Assembly rating: 3 Hour
- Max. 30" x 12" or 12" diameter blank opening (Min. 4-1/4" mineral wool & 1/4" silicone sealant
-
F-A-0014
- Assembly rating: 3 Hour
- Blank CP 680-M, P or PX Cast-In Device with Min 1" Mineral Wool and Device Cap (Min 4-1/2" Concrete)
-
F-A-1014
- Assembly rating: 2 Hour
- Max. 12" steel, 6" copper, conduit or 4" EMT pipe (AS=0" to 1-7/8") (FS-ONE MAX only)
-
F-A-1023
- Assembly rating: 3 Hour
- Max. 2" and 3" Steel conduit or EMT (CP 680-M, P or PX Cast-In Device)
-
F-A-1028
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, 6" copper, conduit or 4" EMT (Sleeve Optional) (AS=0" to 1-7/8")
-
F-A-1038
- Assembly rating: 3 Hour
- CP 681 Tub Box with max. 1-1/2" brass waste/overflow fittings
-
F-A-1066
- Assembly rating: 3 Hour
- Multiple 1-1/2" steel pipe, steel conduit, EMT, or max. 1" Copper (Max. Qty 4) (CP 680-M, P or PX Cast-In Device)
-
F-A-1119
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" steel conduit, max. 4" copper or EMT (optional sleeve in concrete floors only) (2-1/2" concrete) (AS=0" to 2")
-
F-A-1127
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, EMT, or 1" flexible steel conduit (one or more) (2 Hour T-rating w/ Thermal Ceramics or Unifrax Duct Wrap)
-
F-A-1128
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, steel conduit, copper or 4" EMT (CFS-DID MD Drop-In Device)
-
F-A-2054 (US Only)
- Assembly rating: 3 Hour
- Max. 6" PVC, CPVC, RNC (c,v) or Max. 4" PEX (4-1/2" concrete) (CP 680-P Cast-In Device)
-
F-A-2065 (US Only)
- Assembly rating: 2 Hour
- Max. 4" ABS or Nom. 6" FRPP (c,v) (2-1/2" concrete) (CP 680-P Cast-In Device)
-
F-A-2067 (US Only)
- Assembly rating: 2 Hour
- Max. 4" ABS, PVC, or CPVC (c,v) (2-1/2" concrete over metal deck) (AS varies) (CP 648E wrap insert & sealant)
-
F-A-2068 (US Only)
- Assembly rating: 2 Hour
- Max. 3" ABS, PVC, or CPVC (c,v) (2-1/2" concrete over metal deck) (AS varies) (Bottom side access) (CP 648E wrap insert & FS-ONE MAX)
-
F-A-2074 (US Only)
- Assembly rating: 2 Hour
- Nom. 4" ABS closet flange (v) (Toilet) (AS=1/4")
-
F-A-2075 (US Only)
- Assembly rating: 2 Hour
- Nom. 4" PVC closet flange (v) (Toilet) (AS=1/4")
-
F-A-2089 (US Only)
- Assembly rating: 3 Hour
- Max. 3" PVC, CPVC, ABS or FRPP (c,v) (CP 648E wrap insert & sealant)
-
F-A-2103 (US Only)
- Assembly rating: 2 Hour
- Multiple max. 2" PVC, CPVC or max. 1" ENT (c) (CP 680-P Cast-In Device & Mineral Wool)
-
F-A-3012
- Assembly rating: 3 Hour
- Cable bundle (various cables) (sleeve optional) (2-1/2" concrete over metal deck)
-
F-A-3033
- Assembly rating: 3 Hour
- Cable bundle (various cables) (2-1/2" concrete) (CP 680-M, P or PX Cast-In Device with 1" CP 618 Putty Stick)
-
F-A-5018
- Assembly rating: 3 Hour
- Max. 4" steel or copper pipe with max. 2" thickness glass-fiber insulation (4-1/2" concrete) (CP 680-M, P or PX Cast-In Device)
-
F-A-5032
- Assembly rating: 2 Hour
- Max. 3" copper, steel or cast iron with 1" glass fiber or AB/PVC pipe insulation (max qty 3) (AS=1/4" to 2")
-
F-A-5042
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron or max. 4" copper with max. 1-1/2" glass fiber insulation (AS varies) (Optional steel pipe sleeve) & PVC Jacket for W-rating
-
F-A-8004
- Assembly rating: 2 Hour
- Max. 6" steel tube and cables (Min. 2-1/2" concrete floor)
-
F-A-8012
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic pipes, conduits and cables (single or bundled) in max. 30" x 48" opening (4" Mineral Wool & 1/2" Silicone Sealant)
-
F-B-2007 (US Only)
- Assembly rating: 3 Hour
- Nom. 1-1/2" or 2" PVC, Nom. 1-1/2" PVC waste/overflow, and PVC Tub Box (v) (6" concrete) (CP 680-P Cast-In Device)
-
F-B-2013 (US Only)
- Assembly rating: 3 Hour
- Nominal 4" PVC (Aerator Fitting) (v) (6-1/2" concrete) (CP 680-P 4" Cast-In Device)
-
F-B-2032 (US Only)
- Assembly rating: 3 Hour
- Nominal 3" or 4" PVC and toilet or closet flange (CFS-CID CS Closet Stub Cast-In)
-
F-B-2033 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC transitioning to steel or cast iron (CP 680-P Cast-In Device)
-
F-B-2040 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PEX (max. qty = 4) (6" concrete) (CP 680-P Cast-In Device)
-
F-B-2041 (US Only)
- Assembly rating: 2 Hour
- Max. 2" Fusiotherm PP (Aquatherm) plastic pipe or 2" PEX (max. qty = 2) (6" concrete) (CP 680-P Cast-In Device)
-
F-B-2050 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, ABS, CPVC or FRPP (Hollow Core, Lightweight, or Normal weight concrete floor ) through CFS-DID C or HC Drop-In Device
-
F-B-5003
- Assembly rating: 2 Hour
- Multiple 3" copper, steel, cast iron (max. qty = 5) with 1" glass fiber or AB/PVC insulation (6" concrete) (AS=1/4" to 6")
-
F-B-5005
- Assembly rating: 3 Hour
- Max. 2" steel, cast iron or copper with 3/4" or 1" ABPVC / 1", 1-1/2" or 2" of glass fiber (Hollow Core) through CFS-DID C or HC Drop-In Device
-
F-C-1106
- Assembly rating: 1 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT (AS=0" to 7/8")
-
F-C-2071 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (c,v) (AS=1/4" to 3/8")
-
F-C-2142 (US Only)
- Assembly rating: 1 Hour
- Max. 2" ABS, PVC or CPVC (c,v) (AS=0" to 5/8")
-
F-C-2204 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings
-
F-C-2232 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC or ABS(c,v), 4" CPVC (c), or 3" PEX (c) with optional pipe coupling (AS=0" to 1/2")
-
F-C-2263 (US Only)
- Assembly rating: 1 Hour
- Max. 4" ABS or PVC toilet closet flange
-
F-C-2310 (US Only)
- Assembly rating: 2 Hour
- Multiple 1" PEX (max qty = 3) (AS varies)
-
F-C-2334 (US Only)
- Assembly rating: 1 Hour
- Maximum 1" Polyethylene (PEX) SDR 9 Tubing (closed or open) (AS=0" to 7/8")
-
F-C-2335 (US Only)
- Assembly rating: 1 Hour
- Maximum 3" PVC, ABS, CPVC, or RNC (c,v) (AS=3/16" to 5/16") (CP 648S wrap insert & FS-ONE MAX)
-
F-C-2403 (US Only)
- Assembly rating: 1 Hour
- Max 1" ENT (max qty 3) (AS=0" to 1")
-
F-C-3012
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Max 45% fill)
-
F-C-3074
- Assembly rating: 1 Hour
- Cable bundle (various cables) (AS=0" to 1")
-
F-C-5004
- Assembly rating: 2 Hour
- Max. 2" steel, copper, conduit or EMT pipes with max. 1/2" glass fiber or max. 3/4" AB/PVC insulation (AS varies)
-
F-C-5036
- Assembly rating: 1 Hour
- Max. 2" copper, or steel pipe with max. 1-1/2" glass fiber (AS=1/2" to 1")
-
F-C-5065 (US Only)
- Assembly rating: 1 Hour
- Max. 4" copper, cast iron or steel pipe with 3/4" AB/PVC insulation (AS=0" to 7/8")
-
F-C-5086 (US Only)
- Assembly rating: 1 Hour
- Max. 2" CPVC pipe (c) with 1" glass fiber insulation (AS=1/8" to 1")
-
F-C-7036
- Assembly rating: 2 Hour
- Steel Grease or Air Duct with one layer 1-1/2" Firemaster Duct Wrap Mfd. by Thermal Ceramics (AS=1-1/2")
-
F-C-7037
- Assembly rating: 2 Hour
- Max. 4" sheet metal duct with 1-1/2" thick duct wrap (AS=1-1/2")
-
F-C-7043
- Assembly rating: 1 Hour
- Max. 12" x 10" sheet metal duct (AS=0" to 1") (FS-ONE MAX or CP 606)
-
F-E-1004
- Assembly rating: 1 Hour
- Max. 6" steel, cast iron, steel conduit, or max. 4" EMT or copper pipe/tubing through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=1/4" to 3/4")
-
F-E-1018
- Assembly rating: 1 Hour
- Max. 1" flexible steel conduit or gas piping (max qty = 3) through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=0" to 1-1/4")
-
F-E-2026 (US Only)
- Assembly rating: 1 Hour
- Max. 4" ABS or PVC toilet closet flange through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=1/4")
-
F-E-2027 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC or CPVC plastic pipe through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS varies)
-
F-E-2033 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC or ABS w/ branch line (c, v) through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=0" to 1/2")
-
F-E-3005
- Assembly rating: 1 Hour
- Cable bundle (various) through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=3/4")
-
F-E-3012
- Assembly rating: 1 Hour
- Multiple SER cables in slotted opening through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS varies)
-
F-E-7008
- Assembly rating: 1 Hour
- Max. 12" x 10" sheet metal duct through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=0" to 1")
-
F-E-8008
- Assembly rating: 1 Hour
- HVAC Line Set through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=0" to 1")
-
F-A-2312 (US Only)
- Assembly rating: 3 Hour
- Nom. 3" or 4” PVC or ABS closet flange (v) (Toilet) through CFS-CID MD P Cast-In Device for Metal Deck (Min 2-1/2" concrete)
-
F-A-2313 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC through CFS-CID MD P Cast-In Device for Metal Deck (Min 4-1/2" concrete) (2 Hour T-Rating w/ 4" mineral wool)
-
W-J-1116
- Assembly rating: 2 Hour
- Max. 2" steel conduit or EMT (one or more) (CP 620 Fire Foam)
-
W-J-1124
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT (CP 606 only) (AS=0" to 1/2")
-
W-J-1128
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit, or max. 4" EMT (CP 606 only) (AS=0" to 1-7/8")
-
W-J-1215
- Assembly rating: 2 Hour
- Max. 3" steel, cast iron, steel conduit or EMT (CP 653 or CFS-SL GA L Speed Sleeve)
-
W-J-1221
- Assembly rating: 2 Hour
- Multiple Max. 1" Flexible steel conduits (AS=0" to 3")
-
W-J-1222
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron,6" steel conduit, or 4" copper in sheet meta sleeve (AS=0" to 1-7/8")
-
W-J-2070 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, ABS or CPVC (AS=9/16") (CP 648E wrap insert)
-
W-J-2190 (US Only)
- Assembly rating: 4 Hour
- Max. 2" ENT (AS=1/4" to 3/4") (3 or 4 Hour) (Min. 1-1/2" CP 618 Putty Stick)
-
W-J-2205 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, CPVC or Max. 4" ABS (AS varies) (CP 648S wrap insert)
-
W-J-2206 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" PVC, CPVC, RNC, or max. 1" PEX (closed) (AS=0" to 1") (Max Diameter of Opening = 4")
-
W-J-2218 (US Only)
- Assembly rating: 2 Hour
- Max. 8" Polypropylene (PP-R, PP-RCT) (closed only) or Max 4" Polypropylene (PP, PP-RCT) (closed, or vented) or PEX (Uponor AquaPEX or Wirsbo hePEX)(closed only) (AS=0" to 1/2")
-
W-J-2229
- Assembly rating: 2 Hour
- One or more Max. 1" PEX (bundled) (c,v) through CP 653 or CFS-SL GA L Speed Sleeve
-
W-J-2236 (US Only)
- Assembly rating: 2 Hour
- Max. 3/8" single or bundled pneumatic tube (max qty 12) (AS=0" to 1")
-
W-J-2237 (US Only)
- Assembly rating: 2 Hour
- Max 1/2" Single or bundled Dura-line Microduct (max qty 12) (AS=0" to 1")
-
W-J-2238 (US Only)
- Assembly rating: 2 Hour
- Max 1/2" Single or bundled Dura-line Microduct (max qty 12) (AS=0" to 1")
-
W-J-2242
- Assembly rating: 2 Hour
- Cable bundle (various cables) through flexible nylon raceway (sleeve optional) (AS=0" to 3")
-
W-J-3061
- Assembly rating: 2 Hour
- Cable bundle (various cables) (shaft wall) (AS=1/4" to 3/4")
-
W-J-3074
- Assembly rating: 2 Hour
- Cable bundle Cable Rack (Telecom) (various Cables) (AS=0" to 8")
-
W-J-3143
- Assembly rating: 2 Hour
- Cable bundle (various cables) (sleeve required for CMU) (CFS-PL Firestop Plug)
-
W-J-3188
- Assembly rating: 2 Hour
- Cable bundle on Max. 20" wide steel cable rack through concrete wall or block wall assembly
-
W-J-3189
- Assembly rating: 2 Hour
- Cable Bundle (various cables) through "ganged" CP 653 or CFS-SL GA L Speed Sleeves in one or two rows
-
W-J-3190
- Assembly rating: 3 Hour
- Cable bundle (various cables) (optional 45º angle)
-
W-J-3196
- Assembly rating: 2 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
W-J-3199
- Assembly rating: 2 Hour
- Blank or cables through CFS-SL SK Firestop Sleeve Kit with CFS-PL Firestop Plug
-
W-J-3200
- Assembly rating: 2 Hour
- Blank or cables through Cable Management Devices using CFS-SL GP Firestop Gangplate & CP 653 Speed Sleeves, CFS-SL RK Retrofit Kit or CFS-SL SK Sleeve Kit
-
W-J-4016
- Assembly rating: 2 Hour
- Max. 18" x 6" Aluminum Spine Cable Tray (AS=1" to 4-1/2")
-
W-J-5003
- Assembly rating: 2 Hour
- Max. 10" steel or max. 4" copper with 2" thick glass-fiber insulation (AS=1" to 1-1/8")
-
W-J-5057
- Assembly rating: 2 Hour
- Max. 10" steel pipe with max. 3" thick glass-fiber insulation (AS=1/2" to 3/4")
-
W-J-5058
- Assembly rating: 2 Hour
- Max. 10" steel, cast iron or 4" copper pipe with max. 3" thick glass-fiber insulation (AS=1/2" to 3/4")
-
W-J-5067
- Assembly rating: 2 Hour
- Max. 1" copper with max. 2" thick glass-fiber insulation (Shaft Wall) (One Sided) (AS=1/4" to 1-1/8")
-
W-J-5134
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or copper with 1-1/2"glass fiber insulation (AS=0" to 7/8")
-
W-J-5140
- Assembly rating: 2 Hour
- Max. 12" steel or 6" copper with max. 2" glass fiber (optional sleeve) (AS=0" to 1/2" for steel, 0" to 1-7/8" for copper)
-
W-J-6003
- Assembly rating: 2 Hour
- Max. 12" x 4" Fiber optic cable tray (ABS) (AS=0" to 4") (CFS-BL Firestop Block)
-
W-J-7029
- Assembly rating: 2 Hour
- Max. 24" x 12" sheet metal duct w/o damper with max. 1-1/2" thickness glass fiber duct insulation with foil scrim kraft facing (AS=1/4" to 1")
-
W-J-7038
- Assembly rating: 2 Hour
- Max. 6" sheet metal duct w/o damper (Shaft Wall) (One Sided) (AS=1/2" to 3/4"
-
W-J-7085
- Assembly rating: 2 Hour
- Max. 24" x 24" sheet metal duct w/o damper (no angles) (AS=1/2" to 1")
-
W-J-8009
- Assembly rating: 4 Hour
- Max. 6" steel, cast iron, copper, conduit or max. 4" EMT or max. 4" cable bundle (4 Hour) (CFS-BL Firestop Block)
-
W-J-8035
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic pipes, non metallic pipes, and cables (FS-ONE MAX & Mineral Wool)
-
W-J-8039 (US Only)
- Assembly rating: 2 Hour
- Multiple steel pipe, steel conduit, EMT, ENT, and cables
-
W-J-8044
- Assembly rating: 2 Hour
- Multiple HVAC Line Sets (max qty 3) bundled together (AS=0" to 1-1/2")
-
W-J-8047 (US Only)
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic, non-metallic, cable bundles (AS varies) (CFS-BL Firestop Block)
-
W-J-8048
- Assembly rating: 4 Hour
- Multiple penetrating items through concrete block wall (minimum 7-5/8" thick) (CFS-BL Firestop Block)
-
W-J-8050
- Assembly rating: 2 Hour
- ABS Fiber Optic Cable tray, cables (single or bundled), 2" Innerduct (CFS-BL Firestop Block)
-
W-L-0019
- Assembly rating: 2 Hour
- Max. 4" blank steel pipe sleeve with Firestop Plug
-
W-L-0023
- Assembly rating: 2 Hour
- Max. 4" unique firestop sleeve with Firestop Plug
-
W-L-0042
- Assembly rating: 2 Hour
- Blank opening through gypsum wall assembly with Firestop Block (Max area = 273 sq in with max dimension of 22-3/4")
-
W-L-1056
- Assembly rating: 2 Hour
- Max. 12" steel, cast iron, max. 4" copper, conduit or EMT pipe in steel sleeve (AS=3/4" to 4-1/2")
-
W-L-1058
- Assembly rating: 2 Hour
- Max. 16" steel, max. 4" copper, in wire mesh sleeve
-
W-L-1111
- Assembly rating: 4 Hour
- Max. 12" steel, max. 6" copper, conduit or max. 4" EMT (4 Hour) (AS=3/8" to 1/2")
-
W-L-1170
- Assembly rating: 2 Hour
- Max. 6" copper, (sleeved) (AS=1/2" to 1-3/8")
-
W-L-1176
- Assembly rating: 1 Hour
- Max. 2" EMT or steel conduits (one or more)
-
W-L-1205
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" conduit, max. 4" copper, EMT or max. 2" flexible steel conduit (sleeved) (one-sided installation, includes shaft wall) (AS=1/4" to 1-5/8")
-
W-L-1214
- Assembly rating: 1 Hour
- Max. 1" flexible steel conduit (AS=0" to 3/4")
-
W-L-1247
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, steel conduit or max. 3" copper, or max. 4" EMT pipe (one or more) (CP 637 Firestop Mortar)
-
W-L-1289
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT pipe (CP 620 Fire Foam) (AS=0" to 7-7/8")
-
W-L-1290
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT (CP 606 only) (AS=0" to 1/2") (Includes M Rating)
-
W-L-1380
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, 6" copper, 4" steel conduit or EMT (shaft wall) (AS=0" to 7/8")
-
W-L-1410
- Assembly rating: 2 Hour
- Max. 3" steel pipe, iron pipe, steel conduit, or EMT, or Max. 1" copper pipe/tubing or flexible steel conduit (membrane penetration) (AS=0" to 2")
-
W-L-1412
- Assembly rating: 1 Hour
- Max. 2" steel, cast iron, steel conduit, or EMT running vertically through plane of wall on one side (AS=0" to 3/4")
-
W-L-1441
- Assembly rating: 2 Hour
- Max. 3" steel, cast iron, steel conduit, or EMT through CP 653 or CFS-SL GA L Speed Sleeve
-
W-L-1462
- Assembly rating: 2 Hour
- Max. 4 Medical gas station outlets (Beacon Medical Products LLC, DBA BeaconMedaes — Series B) (CP 617 Putty Pad)
-
W-L-1465
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, 6" steel conduit, 4" copper or EMT w/ sheet metal sleeve (AS=0" to 1-7/8")
-
W-L-2075 (US Only)
- Assembly rating: 2 Hour
- Max. 2" ENT (closed system only) (AS=3/4")
-
W-L-2078 (US Only)
- Assembly rating: 2 Hour
- Max. 10" PVC, CPVC, max. 6" ABS, FRPP or max. 4" PVDF, PEX (Uponor AquaPEX or Wirsbo hePEX) (CP 643N or CP 644 Firestop Collar & FS-ONE MAX) (AS=0" to 1/2") (Includes M Rating)
-
W-L-2128 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (closed or open) (sleeve optional) (FS-ONE MAX only) (AS=1/4" to 11/16")
-
W-L-2186 (US Only)
- Assembly rating: 2 Hour
- Max. 1" PEX (closed system only) (sleeved) (AS=1/2" to 1-3/8")
-
W-L-2196 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" ABS (closed or open) (AS=3/8" to 3/4")
-
W-L-2232 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=9/16")
-
W-L-2234 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, ABS or CPVC (AS=5/8")
-
W-L-2236 (US Only)
- Assembly rating: 2 Hour
- Max. 8" PVC or CPVC (c,v) (AS=0" to 1-3/8")
-
W-L-2245 (US Only)
- Assembly rating: 4 Hour
- Max. 6" PVC or CPVC (c,v) (CP 643N Firestop Collar & FS-ONE MAX only) (4 hour) (AS=0" to 1/2")
-
W-L-2292 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC connecting to 4" Cast Iron (w/No Hub Coupling) (Shaft Wall) (sleeved)
-
W-L-2295 (US Only)
- Assembly rating: 2 Hour
- Max. 9" PVDF (closed or open) (sheet metal sleeve & CP 648E wrap strip)
-
W-L-2341 (US Only)
- Assembly rating: 2 Hour
- Max. 12" PVC or CPVC (closed or open) (sheet metal sleeve & CP 648E wrap strip)
-
W-L-2377 (US Only)
- Assembly rating: 2 Hour
- Max. 2" FlowGuard Gold or Blazemaster CPVC (closed) (AS=0" to 1-1/4")
-
W-L-2411 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, ABS, FRPP or CPVC with optional coupling (c,v) (AS=0" to 1/2") (FS-ONE MAX, CP 648E wrap strip & retaining collar)
-
W-L-2444 (US Only)
- Assembly rating: 4 Hour
- Max. 2" ENT (closed system only) (3 or 4 Hour) (AS=3/16" to 5/16")
-
W-L-2453 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or PP (closed or open) (AS=0" to 1/4")
-
W-L-2466 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" PVC, CPVC, RNC, or max. 1" PEX (closed) (Max Diameter of Opening=4") (AS=0" to 1")
-
W-L-2471 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PVC, ABS, CPVC, or RNC (UL Classified U336 or U366 Wall) (Party Wall) (AS=3/16" to 5/16")
-
W-L-2472 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, or RNC (UL Classified U300 Series Wall) (Party Wall) (AS=0" to 5/8")
-
W-L-2474 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, PEX, RNC (closed or open) (FS-ONE MAX only) (AS=0" to 5/8")
-
W-L-2480 (US Only)
- Assembly rating: 2 Hour
- Max 1" PEX (max qty = 6) (c) (AS=1/2" to 1")
-
W-L-2482 (US Only)
- Assembly rating: 1 Hour
- Max 2" PVC (c,v) with optional coupling (AS=0" to 1/2")
-
W-L-2509 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PP or Orion Polystar or 50mm Aquatherm Fusiotherm (c,v) (AS=0" to 5/8")
-
W-L-2537
- Assembly rating: 2 Hour
- One or more Max. 1" PEX (bundled) through CP 653 or CFS-SL GA L Speed Sleeve
-
W-L-2546 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, ABS (c,v) max 2" Flowguard Gold, Blazemaster, PVC conduit (nonsymmetrical installation) (AS=0" to 1/2")
-
W-L-2557 (US Only)
- Assembly rating: 2 Hour
- Max. 3/8" single or bundled pneumatic tube (max qty = 12) (AS=0" to 1")
-
W-L-2558 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" Single or bundled Dura-line Mircroduct (AS=0" to 1")
-
W-L-2568
- Assembly rating: 2 Hour
- Cable bundle (various cables) in flexible nylon fiber optic cable routing system (sleeved) (AS=0" to 1" outside sleeve) (AS=0" to 3" inside sleeve)
-
W-L-3065
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Steel sleeve optional) (AS=0" to 1") (Max 45% fill) (FS-ONE MAX only)
-
W-L-3139
- Assembly rating: 4 Hour
- Cable bundle (various cables) sleeved (4 Hour) (Max. 33% fill, AS=1/4" to 1")
-
W-L-3226
- Assembly rating: 2 Hour
- Cable bundle (various cables) (P-W steel sleeve) (Max. 45% fill) with CFS-BL Firestop Block
-
W-L-3296
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Z-frame with CFS-BL Firestop Blocks) (AS=Min. 1")
-
W-L-3316
- Assembly rating: 2 Hour
- Cable bundle (various cables) through Unique Sleeves with "gang plate" (Max. 45% fill)
-
W-L-3382
- Assembly rating: 2 Hour
- Cable bundle on Max. 20" wide steel cable rack (Max. 35% fill, AS=0" to 12") (CFS-BL Firestop Blocks)
-
W-L-4011
- Assembly rating: 2 Hour
- Max. 24" x 6" Aluminum or Steel Open Ladder or Solid Back Cable Tray (CFS-BL Firestop Block) (AS=0" to 4")
-
W-L-4019
- Assembly rating: 2 Hour
- Max. 18" x 6" Aluminum Spine Cable Tray (CFS-BL Firestop Block) (AS=1" to 2-5/8")
-
W-L-4034
- Assembly rating: 2 Hour
- Max. 24" x 4" Aluminum Open Ladder Cable Tray (CP 620 Fire Foam) (AS=0" to 5")
-
W-L-4038
- Assembly rating: 2 Hour
- Max. 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray (CFS-BL Firestop Block) (AS varies)
-
W-L-4060
- Assembly rating: 2 Hour
- Max. 24" x 6" Aluminum or Steel Open Ladder Cable Tray (FS-ONE MAX & Mineral Wool) (AS=0" to 3")
-
W-L-4081
- Assembly rating: 2 Hour
- Max. 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray (CFS-BL Firestop Block) (AS varies)
-
W-L-5029
- Assembly rating: 3 Hour
- Max. 12" steel, cast iron or max. 6" copper 1", 1-1/2", or 2" glass fiber or max. 2" calcium silicate insulation (FS-ONE MAX only) (AS varies)
-
W-L-5046
- Assembly rating: 2 Hour
- Max. 12" steel or max. 6" copper pipe with 1-1/2" to 3" FOAMGLASS insulation with optional metal jacket (AS=3/4" to 3")
-
W-L-5047
- Assembly rating: 2 Hour
- Max. 20" steel or max. 6" copper with max. 3" glass-fiber & mineral fiber insulation (Steel sleeve optional) (AS varies)
-
W-L-5073
- Assembly rating: 4 Hour
- Max. 6" steel, copper, conduit or EMT pipe with max. 1-1/2" glass fiber insulation in a sleeve (AS=1-1/4" to 1-1/2")
-
W-L-5096
- Assembly rating: 2 Hour
- Max. 12" steel or max. 6" copper pipe with max. 2" glass fiber insulation (steel sleeve optional) (AS varies)
-
W-L-5224 (US Only)
- Assembly rating: 2 Hour
- Beverage Line Set - Max. 1/2" diameter PE or PEX tubing (Max qty = 12) with AB/PVC insulation (AS=0" to 1")
-
W-L-5225 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC/CPVC with 1-1/2" thick glass fiber insulation (AS=0" to 1") or Max. 2" PVC/CPVC with Max. 1" AB/PVC insulation (AS=1/8" to 1/4")
-
W-L-5257
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or copper with 1-1/2"glass fiber insulation (AS=0" to 7/8")
-
W-L-5259
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron or copper with 1-1/2" glass fiber (UL Classified U336 or U366 Wall) (Party Wall) (AS=0" to 7/8")
-
W-L-5263
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, max 2" copper with 3/4" AB/PVC pipe insulation (AS=0" to 7/8")
-
W-L-5274
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron, or copper with 1" to 1-1/2" glass fiber or calcium silicate pipe insulation (AS=0" to 7/8", cont. point of contact) (Optional 45 degree angle)
-
W-L-5293 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" CPVC (c) with 1" glass fiber (AS=1/4" to 7/8")
-
W-L-5294 (US Only)
- Assembly rating: 2 Hour
- Max. 2" CPVC (c) with 1" glass fiber or AB/PVC (CP 648 E wrap insert & FS-ONE MAX) (AS=3/16" to 15/16")
-
W-L-7017
- Assembly rating: 1 Hour
- Max. 6" diameter sheet metal duct w/o damper (AS=1/2" to 1-1/2")
-
W-L-7042
- Assembly rating: 2 Hour
- Max. 24" spiral wound duct or Max. 12" sheet metal duct w/o damper (AS=0" to 1-1/2")
-
W-L-7143
- Assembly rating: 2 Hour
- Max. 24" x 24" sheet metal duct w/o damper (no angles) (AS=1/2" to 1")
-
W-L-7151
- Assembly rating: 2 Hour
- Max. 60" x 36" sheet metal duct (w/o damper) with max. 2" thick glass fiber duct insulation (optional angles on ducts 45" x 25" and smaller) (AS=1/4" to 3-1/2")
-
W-L-7156
- Assembly rating: 2 Hour
- Max. 100" x 100" sheet metal duct (w/o damper) with nom. 1-1/2" or 2" thick glass fiber duct insulation (insulation split for angles) (AS=1/2" to 3-1/2")
-
W-L-7157
- Assembly rating: 2 Hour
- Max. 24" x 24" steel grease duct with two layers of 1-1/2" duct wrap Mfd. by Unifrax (AS=0" to 1-1/2")
-
W-L-7188
- Assembly rating: 2 Hour
- Max. W14 x 90 Steel I-beam service support (AS=1/2" to 3")
-
W-L-8014
- Assembly rating: 4 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, cable tray or cables (single or bundled) (Max. 4 Hour) (CFS-BL Firestop Block)
-
W-L-8019
- Assembly rating: 2 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, flexible steel conduit or sheet metal duct, PVC pipe or cables (single or bundled) (CP 620 Fire Foam)
-
W-L-8085
- Assembly rating: 2 Hour
- Single HVAC Line Set through CP 653 or CFS-SL GA L Speed Sleeve
-
W-L-8086
- Assembly rating: 2 Hour
- Cable bundle and metallic pipe through CP 653 or CFS-SL GA L Speed Sleeve
-
W-L-8087
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic, non-metallic, cable bundles (AS varies) (CFS-BL Firestop Block)
-
W-L-8095
- Assembly rating: 2 Hour
- Multiple penetrations through gypsum wall assembly (various insulated or non-insulated metallic, non-metallic, and cables) (CFS-BL Firestop Block)
-
FW-D-0067
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max JW = 1”)
-
FF-D-1125
- Joint type: Floor-to-Floor
- Assembly rating: 4 Hour
- Concrete floor to floor joint (Max JW = 3”)
-
HW-D-0632 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to flat concrete (top-of-wall) (Max JW = 1”)
-
HW-D-1103
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Block wall to underside of flat concrete or hollow core (Max JW = 3”)
-
HW-D-0702
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to flat concrete or hollow core (top-of-wall) (Max JW = 1”)
-
C-AJ-2675 (US Only)
- Assembly rating: 2 Hour
- Max. 2” Glass pipe (AS = 0” to 1-3/4”)
-
C-AJ-2677
- Assembly rating: 2 Hour
- Max. 2” PP (SDR 7.4) (AS=5/16”)
-
C-AJ-7151
- Assembly rating: 3 Hour
- Carbon steel air or grease duct with two layers 1-1/2” thick FireMaster FireWrap XL, FireMaster FastWrap+, or Pyrostate Duct Wrap XL
-
C-AJ-7149
- Assembly rating: 2 Hour
- Max. 8” sheet metal duct (min 26 Ga) (AS = ¼” to 1-3/4”)
-
F-A-1136
- Assembly rating: 3 Hour
- Max 8” steel, cast iron, max 4” copper, steel conduit, or EMT (AS = ¼” to 1-5/8”)
-
F-A-5047
- Assembly rating: 3 Hour
- Max. 8” steel, cast iron, 4” copper with 1” glass fiber (AS=1/4” to 5/8”)
-
W-L-3413
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Steel sleeve optional) (sleeve may be continuous on one side of wall)(cables may be at 45º angle) (AS=0” to 1”)
-
W-L-7213
- Assembly rating: 2 Hour
- Max. 48” x 24” sheet metal duct w/o damper (AS=0” to 2”)
-
W-L-2043
- Assembly rating: 2 Hour
- Max. 2" PP (sch 80) with 1" AB/PVC or 1-1/2" glass fiber or mineral fiber pipe insulation (AS=0" to 1/4")
-
W-L-1497 (US Only)
- Assembly rating: 2 Hour
- Max. 4" Aluminum tube (CFS-BL Firestop Block) (AS=Min. 3")
-
F-C-7057
- Assembly rating: 1 Hour
- Max. 7" diameter or 10" x 4" steel air duct with 1/2” or 1-1/2" thick FireWrap DPS or FireWrap Elite 1.5 by Unifrax (AS=1-1/2")
-
CW-D-1019
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Tilt-up Concrete Panel Curtain Wall (Max. JW=4")
-
C-AJ-2639 (US Only)
- Assembly rating: 2 Hour
- Max. 2” FRPP or PVDF (c,v) (AS=5/16”) (CP 648E wrap insert & FS-ONE MAX)
-
F-C-7059
- Assembly rating: 1 Hour
- Max. 7" steel air duct with 1/2” thick FireMaster DryerWrap, FireMaster FastWrap XL, or Pyrostate Duct Wrap XL by Thermal Ceramics (AS=1/2")
-
F-A-2071 (US Only)
- Assembly rating: 3 Hour
- Nom. 4” PVC or ABS closet flange (v) (Toilet) (CP 680-P 4" Cast-In Device)
-
CLIV (Firestop Box Insert)
- Assembly rating: 2 Hour
- Wall Opening Protective Materials (CLIV) (Outlet Boxes) - Firestop Box Insert
-
F-A-2230 (US Only)
- Assembly rating: 2 Hour
- Max. 2 in. PVC into shower/floor drain through CFS-DID 3" MD Firestop Drop-In Device
-
C-AJ-2700 (US Only)
- Assembly rating: 2 Hour
- Max.1-1/4" Polystar PP or PP-R plastic pipe (mfd. by Orion, Cosmoplast or Coprax) (closed only) (Includes Hollow-Core) (AS=0" to 2")
-
HI/PF 120-01
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, or EMT (2 Hour T-Rating)
-
HI/PF 120-03
- Assembly rating: 2 Hour
- Max. 4" copper (AS=0" to 1-7/8") (2 Hour T-Rating)
-
HI/PF 120-05
- Assembly rating: 2 Hour
- Single or Multiple Max. 4/C No 500 kcmil metal clad power cable with PVC jacket (AS = 0" to 4") (2 Hour T-Rating)
-
C-AJ-5352 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PP pipe w/ Max. 1-1/2 Glass Fiber (AS=3/8" to 1-1/8") (Min. 2-1/2" floor, Min. 2-3/4" wall) (CP 648E wrap insert & sealant)
-
F-C-5088
- Assembly rating: 2 Hour
- Max. 4" Steel Pipe, Iron Pipe, Copper Tubing, Copper Pipe (AS=0" to 1/2")
-
W-L-2602 (US Only)
- Assembly rating: 2 Hour
- Max. 1" PP pipe (c) (sheet metal sleeve, CP 648E wrap insert & sealant) (AS=3/16" to 1/2")
-
W-L-5303 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PP Orion Polystar or Aquatherm Fusiotherm pipe (c) w/ Max. 1-1/2" Glass Fiber (sheet metal sleeve, wrap inserts & sealant) (AS=3/8" to 1-1/8")
-
HW-D-0750
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (top-of-wall) (Max. JW=1-1/2")
-
F-C-1168
- Assembly rating: 1 Hour
- Max. 3/4" steel, iron, conduit, or EMT pipe; Max. 1/2" copper tubing or copper pipe; AS = Min. 0" (CFS-D 1" Firestop Putty Disc)
-
F-C-2432 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" microduct (c); AS= Min. 0" (CFS-D 1" Firestop Cable Disc)
-
W-J-3215
- Assembly rating: 2 Hour
- Cable bundle; VF = 0 - 100%; AS = Min. 0" (CFS-D 1" Firestop Putty Disc)
-
W-L-2605 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" microduct or Max. 3/4" PEX (c); AS = 0" to 1/2" (CFS-D 1" Firestop Putty Disc)
-
HI/JF 120-03
- Joint type: Wall-to-Column
- Assembly rating: 2 Hour
- Gypsum Shaft Wall to Fireproofed Column Vertical Joint (Max. JW = 5/8")
-
TP-CS-SL SA
- Assembly rating: 0 Hour
- Through penetration for non fire-rated smoke partitions with CS-SL SA Smoke & Acoustic Sleeve
-
WW-S-0074
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete wall (wall-to-wall) with CFS-TTS Top Track Seal
-
WW-S-0075
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum wall (double stud) to concrete wall (wall-to-wall) with CFS-TTS Top Track Seal
-
HW-D-0757
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (top-of-wall) with CFS-TTS Top Track Seal (optional resilient Channel) (Max. JW=3/4")
-
W-L-3233
- Assembly rating: 2 Hour
- Cable bundle (various cables) through gypsum board wall (Max. 48% fill) in unique threaded sleeve
-
W-L-3230
- Assembly rating: 2 Hour
- Angled cable membrane penetration through gypsum board wall (Unique Firestop Sleeve) (CP 618 Firestop Putty Stick)
-
C-AJ-0155
- Assembly rating: 4 Hour
- Max 30" x 30" Blank opening with CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) (min. 4-1/2" concrete) (4 hour)
-
C-AJ-4107
- Assembly rating: 4 Hour
- Max 24" x 4" Steel or Aluminum Open Ladder Cable Tray with CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing)
-
C-AJ-8250
- Assembly rating: 4 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) and cable bundle or metallic penetrant through concrete floor or block wall (min.4-1/2") (4 Hour)
-
W-L-8105
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) for multiple or mixed penetrants through gypsum board/stud wall assembly.
-
W-L-7250
- Assembly rating: 2 Hour
- Max. 30" x 30" sheet metal duct (w/o damper) (AS=1/4" to 1-1/8") (Angles Max. 4" from wall)
-
F-A-2270 (US Only)
- Assembly rating: 3 Hour
- Max. 4" Aquatherm PP-R pipe (c) (4-1/2" concrete) (CP 680-P Cast-In Device)
-
C-AJ-7192
- Assembly rating: 3 Hour
- Max. 30” x 30” sheet metal duct (w/o steel angles) (Min. 24 ga. for 2 hour, Min. 22 ga for 3 hour) (AS=1/2” to 1-1/2”)
-
F-B-0005
- Assembly rating: 2 Hour
- Blank CFS-CID M & P [8" or 10"] Cast-In Device (Min 6" concrete) (4" Mineral Wool & 1/2" Sealant)
-
F-A-2271 (US Only)
- Assembly rating: 2 Hour
- Max. 4" Aquatherm Greenpipe PP through CFS-DID MD Firestop Drop-In Device (1/2" CF 812 Filler Foam required only for 4" pipe)
-
W-J-8068
- Assembly rating: 2 Hour
- HVAC line set through CFS-SL SK Firestop Sleeve Kit with CFS-PL Firestop Plug
-
W-L-2676
- Assembly rating: 2 Hour
- Max. 2" ENT (AS=0" to 1/2")
-
F-A-1168
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, EMT, or 1" flexible steel conduit (one or more & multiple rows) (2 Hour T-rating w/ Thermal Ceramics or Unifrax Duct Wrap)
-
C-AJ-2770 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PP-R or HDPE pipe (AS varies) (CP 648E wrap insert & FS-ONE MAX)
-
HW-D-0824
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Shaft Wall to Flat Concrete Floor (includes Hollow-Core) with CFS-TTS Top Track Seal (Max. JW=1/2")
-
F-A-5061 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PEX (Uponor AquaPEX or Wirsbo hePEX) (closed) with Nom. 1" Glass Fiber through CFS-DID Firestop Drop-In Device MD or C
-
F-A-8047
- Assembly rating: 2 Hour
- Single HVAC Line Set through CFS-DID Firestop Drop-In Device 3" MD or C
-
F-B-2063
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, or ABS (Concrete Floor or Hollow-Core Floor) inside optional Gypsum Chase Wall.
-
F-B-5010 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PEX (Uponor AquaPEX or Wirsbo hePEX) (closed) with Nom. 1" Glass Fiber through CFS-DID Firestop Drop-In Device C or HC (Hollow-Core)
-
W-L-5345
- Assembly rating: 2 Hour
- Max. 7/8" Streamline ACR-Type L Copper Tubing with Nom. 1/2" (Duraguard) Polyethylene Insulation (AS=1/4" to 1-1/2")
-
HI/BPF 120-12
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing (Max. JW = 4")
-
W-L-2683 (US Only)
- Assembly rating: 2 Hour
- Max. 6" Polypropylene (PP) Aquatherm Greenpipe (closed) (Steel Sleeve, CP 648E wrap insert & FS-ONE Max)
-
HW-D-0825 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete wall/block wall to flat concrete floor (Includes Hollow-Core) one-sided install with optional max. 1" steel or pvc conduit penetrants (CFS-D 1" Firestop Putty Disc installed on each penetrant) (Max. JW=2")
-
WW-D-0220 (US Only)
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (one-sided install) with optional max. 1" steel or pvc conduit penetrants (CFS-D 1" Firestop Putty Disc installed on each penetrant) (Max. JW=2")
-
W-L-7277
- Assembly rating: 2 Hour
- Max. 20-1/8" wide by 42" high by 5-3/4" deep steel box (min 18 ga.) (membrane penetration) (CP 617 Firestop Putty Pad) (AS=0" to 1/2")
-
C-AJ-2827 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PEX (closed only) (Includes Hollow-Core) (AS=3/8" to 1-1/8") (FS-ONE MAX & Mineral Wool only)
-
C-AJ-2831
- Assembly rating: 3 Hour
- Max. 6" Polypropylene (PP, PP-R, PP-RCT) or PVC-HR plastic pipe (AS=0" to 3/4")
-
C-AJ-2830
- Assembly rating: 2 Hour
- Max. 3" Polypropylene (PP, PP-R, PP-RCT) or PVC-HR (Sch. 40) (AS=0" to 1/2")
-
W-J-3261
- Assembly rating: 2 Hour
- Cable Bundle through CFS-MS 1" Sleeve Kit with CFS-D 1" Firestop Cable Disc (VF = 0 to 100%, AS=0" to 1/8")
-
W-L-3446
- Assembly rating: 2 Hour
- Cable bundle through (Membrane) Max. 1" Steel Conduit Sleeve extended Max. 12" (one side of wall); VF = 0 - 100%; AS = Min. 0" (CFS-D 1" Firestop Putty Disc)
-
TP-572
- Assembly rating: 0 Hour
- Through penetration details for non fire-rated smoke partitions with CP 572 Smoke & Acoustic Spray
-
C-BJ-3039
- Assembly rating: 2 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-BJ-8037
- Assembly rating: 2 Hour
- Cables (various) and/or one or more Max. 1" Steel Conduit or EMT through CFS-T Firestop Cable Transit (Max. 100% fill)
-
HI/BPF 120-16
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) (Max. JW = 4")
-
F-A-5071
- Assembly rating: 2 Hour
- Max. 1" steel or copper pipe/tubing with nominal 1-1/2" cellular glass insulation (Min. 4-1/2" concrete) through CFS-CID MD P Cast-In Device for Metal Deck
-
F-A-3072 (US Only)
- Assembly rating: 3 Hour
- Nom. 4/C No 500 kcmill TEK Cable through through CFS-CID MD [M or P] (Min. 2-1/2" Concrete)
-
HI/BPF 120-19
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel with Aluminum Framing (vision glass at floor) with CFS-EOS QS Edge of Slab Quick Seal (Max. JW=4-1/2")
-
F-C-8059 (US Only)
- Assembly rating: 1 Hour
- Mixed/Multiple insulated or non-insulated metallic pipes, non-metallic pipes, cable bundles or ducts (Max 32" x 14-1/2" opening) (CFS-BL Firestop Block)
-
HW-D-0874
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (parallel & perpendicular) with structural steel beams or bar joists penetrating wall (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-1/4")
-
HW-D-0884
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (parallel & perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0881
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1/2")
-
HI/BPF 120-13
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Aluminum Framing (Max JW = 6")
-
W-J-1321
- Assembly rating: 1 Hour
- Max. 2" Steel Pipe or Steel Conduit (AS= 0" to 2-1/2") (CFS-BL Firestop Block) (Includes M Rating)
-
W-L-1597
- Assembly rating: 1 Hour
- Max. 2" Steel Pipe or Steel Conduit (AS= 0" to 2-1/2") (CFS-BL Firestop Block) (Includes M Rating)
-
HI/BPF 120-22
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 4-1/2")
-
HI/BPF 120-27
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 4")
-
HI/BPF 120-23
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5")
-
C-BJ-3042
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) with one or more CP 653 or CFS-SL GA L Speed Sleeves with cables (Max. 100% fill) through conc. floor or block wall (min.8")
-
C-AJ-2887
- Assembly rating: 2 Hour
- Max. 4" HDPE (AS varies) (CP 648E wrap insert & FS-ONE MAX)
-
F-C-2515
- Assembly rating: 1 Hour
- Max. 6" PVC, CPVC or RNC (c,v) (AS=0" to 1/2") (CP 643N Firestop Collar & FS-ONE MAX)
-
HW-D-0907
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (diagonal or offset to flutes) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HI/BPF 120-24
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Precast Concrete Panel Curtain Wall with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 3").
-
HI/BPF 240-01
- Joint type: Curtain Wall
- Assembly rating: 4 Hour
- Precast Concrete Panel Curtain Wall with Mineral Wool and CFS-SP WB Firestop Joint Spray (Max. JW = 3-1/4").
-
HI/BPF 120-28
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Upper Transom Support Angle and Aluminum Framing (Max. JW = 3")
-
HI/BPF 120-29
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Upper Transom Support Angle and Aluminum Framing (Max. JW = 3")
-
F-A-2322 (US Only)
- Assembly rating: 2 Hour
- Nominal 12" Diameter Polypropylene (PP-R/PP-RTC) pipe (closed piping only) (AS= 1/2" to 5") (CFS-BL Firestop Blocks)
-
F-A-2347 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC with Shower Drain (v) through CFS-CID MD P Cast-In Device for Metal Deck (Min 2-1/2" concrete)
-
HW-D-0923
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck with use of spray-on fireproofing (parrallel or perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0925
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (offset flutes) with CFS-TTS MD Top Track Seal and steel strapping (Max. JW=1-5/8")
-
TP-CS-S SA LIGHT
- Assembly rating: 0 Hour
- Through penetration details for non fire-rated smoke partitions with CS-S SA LIGHT Smoke & Acoustic Sealant
-
HW-D-1125
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall (with RipTRAK) to concrete over fluted metal deck or flat concrete (Max. JW=4")
-
FF-D-0155
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint using CFS-SP WB Firestop Joint Spray without overlap (Max. JW=1")
-
HI/PF 120-09 (US Only)
- Assembly rating: 2 Hour
- Nominal 2" PVC (Sch. 40) through Mass Timber Floor or Wall.
-
HI/PF 120-10
- Assembly rating: 2 Hour
- Nominal 6" Diameter Steel, or Cast Iron, with Max. 2" Glass Fiber through Mass Timber Floor or Wall
-
HW-D-0930
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete wall/block wall to flat concrete floor (Includes Hollow-Core) optional one-sided install (Max. JW=2")
-
C-AJ-2897 (US Only)
- Assembly rating: 3 Hour
- Max. 4" Polybutylene (PB) plastic pipe (closed system) through a concrete floor or wall.
-
HW-D-0906
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over Metal deck (includes Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.) (Perpendicular) (top-of-wall) (Max. JW=3/4")
-
W-L-7324
- Assembly rating: 2 Hour
- Max. 14-3/8" wide by 39" high by 3-7/8" deep steel box (min 20 ga.). Membrane penetration utilizing HILTI CFP-ES ENDO-SHIELD. (AS=nominal 0")
-
F-A-1207
- Assembly rating: 2 Hour
- Max. 4" steel, iron, conduit, or EMT through CP 680-M/P/PX (Min. 4-1/2" Concrete) (1 or 2 Hour T-rating with HILTI CFP-ES ENDO-SHIELD)
-
C-AJ-3386
- Assembly rating: 2 Hour
- Cable bundle (various cables) through CP 653 Speed Sleeve (T-rating with HILTI CFP-ES ENDO-SHIELD)
-
HW-D-0947
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to concrete floor or UL Classified hollow-core Precast Concrete Units with CFS-TTS Top Track Seal (Optional: one side of wall may be sealed with HILTI CP 606 or HILTI CFS-S SIL GG) (Max Width of Joint = 3/4")
-
FW-D-1141
- Joint type: Floor-to-Wall
- Assembly rating: 3 Hour
- Concrete floor to wall joint with CFS-SP SIL Firesop Silicone Joint Spray (Max. JW=3")
-
HW-D-0956
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to bottom of offset I beam with Z-bar extensions and fireproofing. (Max JW = 1-1/2")
-
F-A-3087
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together to completely fill row in CFS-FGR Floor Grid. HILTI CFP-ES Endo-Shield to be added for Temperature Rating.
-
HW-S-0036
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-S-0038
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over metal deck (Perpendicular) (Top-of-wall) (Max. JW = 3")
-
HW-D-0957
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor(top-of-wall & Bottom-of-wall) (Max. JW=2")
-
HW-D-0958
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor(top-of-wall & Bottom-of-wall) (Max. JW=1")
-
F-G-5001
- Assembly rating: 1 Hour
- Max. 4" steel, cast or ductile iron, or copper with 1", 1-1/2" or 2" of glass fiber insulation through a mass timber floor assembly using CFS-DID MD or CFS-DID C Drop-In Device
-
HI/BPF 120-35
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Mass Timber Floor Assembly to Concrete Spandrel Panel with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
HI/BPF 180-05
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Normal Weight Concrete Floor Assembly to Concrete Spandrel Panel with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
C-AJ-8333
- Assembly rating: 2 Hour
- 1 or more Max. 2" PVC, CPVC, RNC, PEX, Polypropylene, steel pipe, steel conduit, EMT, stainless steel, or copper tubing. Nom. 1" glass fiber required for Copper, optional for PVC, CPVC, and PP. max. 160 sq. in. opening with max. dimension of 32".
-
W-J-8102
- Assembly rating: 2 Hour
- One or more HVAC Line Set (5/8" depth of FS-ONE MAX only)
-
W-L-8141
- Assembly rating: 2 Hour
- HVAC Line Set (5/8" depth of FS-ONE MAX only) (AS=0" to 1/2")
-
W-L-5383
- Assembly rating: 2 Hour
- Max. 2" diameter copper pipe or tube with max. 1-1/2" AB/PVC insulation (Sealant, Wrap Strip, & Retaining Collar)
-
FW-D-0103
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to Wall joint with CFS-TTS MD OS or CFS-TTS MD 600 Firestop Top Track Seal (Max. JW= 1-1/8")
-
WW-D-0278
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint with CFS-TTS MD OS or CFS-TTS MD 600 (Max. JW=1-1/8")
-
F-A-1218
- Assembly rating: 2 Hour
- Max. 10" steel, cast iron, 6" steel conduit, or 4" EMT (1 or 2 Hour T-rating with HILTI CFP-ES ENDO-SHIELD)
-
C-AJ-8334
- Assembly rating: 2 Hour
- HVAC line set with nom. 3/4" polyethylene insulation. (AS=min 0" to Max 1-3/8")
-
HW-D-0946 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=3/4"). Penatrating item of Nominal 2" or smaller PVC, CPVC, or RNC.
-
J-CFS-BTS
- Joint type: Bottom-of-Wall
- Assembly rating: 0 Hour
- Bottom-of-Wall joint system for non-rated smoke partitions with CFS-BTS Bottom Track Seal
-
C-AJ-2937
- Assembly rating: 2 Hour
- Max 10" HDPE plastic pipe (SDR 11) (closed only) (AS=0" to 1-1/4")
-
HI/BPF 120-37
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass spandrel with aluminum framing curtain wall assembly utilizing Curtain wall Hilti insulation clips. (Max. JW=4")
-
F-G-2002
- Assembly rating: 2 Hour
- Max. 4" PVC-XFR (Sch. 40) (Closed or vented piping system) through a mass timber floor assembly.
-
F-G-2003 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC (Sch. 40) (Closed or Vented piping system) or CPVC (SDR 11 or 13.5) (Closed piping system) through a mass timber floor assembly.
-
HW-D-0089 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ optional use of spray-on fireproofing (top-of-wall) (Max. JW=2")
-
F-A-1220
- Assembly rating: 2 Hour
- Max. 4" nominal diameter aluminum pipe or conduit with CFP-ES ENDO-SHIELD through CFS-CID MD, or CP 680.
-
W-L-2840 (US Only)
- Assembly rating: 2 Hour
- Max. 3" nominal diameter CPVC (SDR 11 or Sch. 80) (closed Piping system) Sealant only
-
W-J-2396 (US Only)
- Assembly rating: 2 Hour
- Max. 3" nominal diameter CPVC (SDR 11 or Sch. 80) (closed Piping system) Sealant only
-
C-BJ-1072
- Assembly rating: 2 Hour
- Max. 4" Steel, Iron, Steel Conduit, or Steel EMT pipe with underside access. (AS=0" to 1-1/2") (T-rating with HILTI CFP-ES ENDO-SHIELD)
-
HW-D-0120
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum shaft wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (top-of-wall) (Max. JW=1")
-
HW-D-0154
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0155 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0181
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=1")
-
HW-D-0190
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ spray-on fireproofing completely filling flutes (top-of-wall) (Max. JW=2")
-
HW-D-0209
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Gypsum wall to concrete floor or hollow core (top-of-wall) (Max. JW=1")
-
HW-D-0218
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck with structural steel beams or bar joists penetrating wall (top-of-wall) (Max. JW=1-1/2")
-
HW-D-0225
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=2-1/4")
-
HW-D-0258
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck with structural steel beams or bar joists penetrating wall (top-of-wall) (Max. JW=1")
-
HW-D-0268
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=1") (backer rod optional)
-
HW-D-0285
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal roof deck (top-of-wall) (stuff/spray/stuff/spray) (Max. JW=2")
-
HW-D-0286
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal roof deck (top-of-wall) (stuff/spray/stuff/spray) (Max. JW=2")
-
HW-D-0294
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (perpendicular) (Max. JW=1")
-
HW-D-0295
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Gypsum Wall to concrete over fluted metal roof deck (top-of-wall) (parallel) (Max. JW=1")
-
HW-D-0296
- Joint type: Head-of-Wall
- Assembly rating: 4 Hour
- Concrete Wall to concrete over fluted metal roof deck (top-of-wall) (parallel) (Max. JW=1")
-
HW-D-0324
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Wall to concrete over fluted metal roof deck (top-of-wall) (castle cut, gypsum cut to profile) (Max. JW=3/4")
-
HW-D-0342
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete floor (Max. JW=1")
-
HW-D-0388
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck with one side inaccessible due to structural member (Max. JW=1-1/2")
-
HW-D-0389
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over metal deck with one side inaccessible due to structural member (Max. JW=1")
-
HW-D-0396
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal roof deck (offset to flute) (Max. JW=3/4")
-
HW-D-0403
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=2")
-
HW-D-0440
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to bottom of fire-proofed steel I-beam to concrete over metal deck (Max. JW=2")
-
HW-D-0460
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to conrete over metal deck (top-of-wall) (perpendicular) (Max. JW=3/4") (The Steel Network)
-
HW-D-0466
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to conrete floor joint (top-of-wall) (Max. JW=3/4") (The Steel Network)
-
HW-D-0529
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to insulated roof deck (top-of-wall) (Max. JW=2")
-
HW-D-0530
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to insulated roof deck (top-of-wall) (Max. JW=2")
-
HW-D-0538
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=1-1/2")
-
HW-D-0541
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=3/4")
-
HW-D-0542
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (top-of-wall) (parallel) (Max. JW=3/4")
-
HW-D-0545
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=3/4")
-
HW-D-0564
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular) (Penetrations through flutes) (Max. JW=2")
-
HW-D-0569
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (top-of-wall) (perpendicular) (Max. JW=1-1/2")
-
HW-D-0570
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (top-of-wall) (parallel) (Max. JW=1-1/2")
-
HW-D-0571
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to bottom of fireproofed steel beam to concrete over metal deck (top-of-wall) (Max. JW=1-1/2")
-
HW-D-0572
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to flat concrete (top-of-wall) (Max. JW=1-1/2")
-
HW-D-0634
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Wall to bottom of offset I beam with Z-bar extensions (Max. JW=1-1/2")
-
HW-D-0635
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Wall to bottom of offset I beam with Z-bar extensions w/ additional gypsum (Max. JW=1-1/2")
-
HW-D-0639
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck with one side inaccessible due to structural member (Max. JW=1-1/2")
-
HW-D-0640
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck with one side inaccessible due to structural member (Max. JW=1-1/2")
-
HW-D-1008
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=3-1/2")
-
HW-D-1009
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max. JW=3-3/4")
-
HW-D-1011
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (Max. JW=3")
-
BW-S-0001
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to Concrete floor (bottom-of-wall)
-
BW-S-0023
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete floor (bottom of wall)
-
HI/BPF 120-06 (CEJ 216P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel and Aluminum Framing (Max. JW=6")
-
HI/BP 135-01 (CEJ 245P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Concrete Panels with Steel Framing (Max. JW=8")
-
HI/BP 120-08 (CEJ 259P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with EIFS Finish and Steel Framing (Max. JW=8")
-
HI/PHV 120-07 (CEJ 261P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Stone Finish and Steel Framing (Max. JW=8")
-
HI/PHV 120-08 (CEJ 262P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Brick Finish and Steel Framing (Max. JW=8")
-
HI/PHV 120-09 (CEJ 263P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Aluminum or Steel Siding and Steel Framing (Max. JW=8")
-
HI/PHV 120-10 (CEJ 264P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with EIFS Finish and Steel Framing (Max. JW=8")
-
HI/PHV 120-11 (CEJ 265P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Aluminum or Steel Siding and Steel Framing (Max. JW=8")
-
HI/BP 180-01 (CEJ 307P)
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Glass or Aluminum Spandrel with Aluminum Framing (Max. JW=8")
-
HI/BP 165-01 (CEJ 314P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Brick Finish and Steel Framing (Max. JW=6")
-
HI/BP 165-02 (CEJ 315P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Cementitious Finish and Steel Framing (Max. JW=6")
-
HI/BP 165-03 (CEJ 316P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with Plaster Finish and Steel Framing (Max. JW=6")
-
HI/BP 120-02 (CEJ 400P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- GFRC Panels with steel framing (Max. JW=8")
-
HI/BP 120-04 (CEJ 425P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum wall with various facades. Steel framing starts and stops above and below floor (Nom. 2" cantilever)
-
HI/BP 60-01 (CEJ 526P)
- Joint type: Curtain Wall
- Assembly rating: 1 Hour
- Glass Spandrel with Aluminum Framing (vision glass at floor) (Max. JW=6")
-
HI/JS 120-04 (CEJ 529P)
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass spandrel panel with aluminum framing (Max. JW=2") (25% vertical shear movement)
-
CJ-D-0004
- Joint type: Continuity Head-of-Wall,Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to non-rated floor/roof deck (Max. JW=1-1/2")
-
CJ-D-0009 (US Only)
- Joint type: Continuity Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to non-rated insulated roof deck (Max. JW=2")
-
CJ-D-0010 (US Only)
- Joint type: Continuity Head-of-Wall,Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to non-rated insulated roof deck (Max. JW=2")
-
CW-D-1001
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Tilt-up Concrete Panel Curtain Wall (Max. JW=6")
-
CW-D-1003
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Tilt-up Concrete Panel Curtain Wall (Max. JW=6")
-
CW-D-1015
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=4")
-
CW-D-1018
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Tilt-up Concrete Panel Curtain Wall (Max. JW=3")
-
CW-D-2025
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Insulated Tilt-up Concrete Panel Curtain Wall (Max. JW=8")
-
CW-D-2026
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8")
-
CW-D-2027
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8")
-
CW-D-2046
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8")
-
CW-S-1007
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Tilt-Up Concrete Panel Curtain Wall (Max JW = 6")
-
CW-S-2027
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel and Aluminum Framing (Max. JW=8")
-
CW-S-2028
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel and Aluminum Framing (Max. JW=8")
-
CW-S-2030
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Aluminum Spandrel Panel and Aluminum Framing (Max. JW=8")
-
CW-S-2031
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Granite Spandrel Panel and Aluminum Framing (Max. JW=8")
-
FF-D-0055
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint (Max. JW=2")
-
FF-D-1011
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint (Max. JW=3-1/2")
-
FF-D-1012
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max. JW=3-3/4")
-
FF-D-1013
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max. JW=3-1/2")
-
FF-D-1039
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max. JW=6")
-
FF-D-1047
- Joint type: Floor-to-Floor
- Assembly rating: 4 Hour
- Concrete floor to floor joint (Max. JW=2")
-
FF-D-1087
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max. JW=3")
-
FW-D-0041
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max. JW=1/2")
-
FW-D-0042
- Joint type: Floor-to-Wall
- Assembly rating: 3 Hour
- Concrete floor to wall joint (Max. JW=2")
-
FW-D-1011
- Joint type: Floor-to-Wall
- Assembly rating: 3 Hour
- Concrete floor to wall joint (Max. JW=3-1/2")
-
FW-D-1037
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max. JW=6")
-
FW-D-1043
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete stair case to Concrete wall joint (Max. JW=3-3/4")
-
FW-D-1047
- Joint type: Floor-to-Wall
- Assembly rating: 4 Hour
- Concrete floor to wall joint (Max. JW=2")
-
FW-D-1071
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max. JW=3")
-
HI/BP 120-05
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Gypsum with various facades. Steel framing starts and stops above and below floor (Max. JW=0") (Max. 2" cantilever)
-
HI/BP 150-01
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass spandrel with aluminum framing (vision glass at floor) (Max. JW=8")
-
HI/JF 120-01
- Joint type: Wall-to-Column
- Assembly rating: 2 Hour
- Gypsum Wall to Fireproofed Column Vertical Joint (Max. JW = 1-1/2")
-
HW-D-0042
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (includes Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp. ) w/ optional use of spray-on fireproofing (top-of-wall) (Max. JW=1")
-
HW-D-0045
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (includes Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.) (top-of-wall) (Max. JW=3/4")
-
HW-D-0049
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (includes Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.) w/ optional use of spray-on fireproofing (top-of-wall) (Max. JW=1")
-
HW-D-0060
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (top-of-wall) (Max. JW=1")
-
HW-D-0061
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck or flat concrete (top-of-wall) (Max. JW=1")
-
HW-D-0080
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0082
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (top-of-wall) (Max. JW=3/4")
-
HW-D-0084
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (Max. JW=3/4")
-
HW-D-0097
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor joint (top-of-wall)
-
HW-D-0098
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (penetrations in flutes) (Max. JW=1")
-
HW-D-0106 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor or hollowcore (top-of-wall) (Max. JW=2")
-
HW-D-1020
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall (with Fire Trak) to concrete over fluted metal deck (Max. JW=3")
-
HW-D-1037
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck (top-of-wall) (Max. JW=3-1/2")
-
HW-D-1041
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over metal deck w/ spray-on fireproofing completely filling flutes (top-of-wall) (Max. JW=3-1/2")
-
HW-D-1044
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete over fluted metal deck w/ steel bracing (top-of-wall) (Max. JW=3-1/2")
-
HW-D-1045
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor w/ steel bracing (top-of-wall) (Max. JW=3-1/2")
-
HW-D-1058
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete floor (Max. JW=3-1/4")
-
HW-D-1068
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to underside of flat concrete (Max. JW=2-1/2")
-
HW-D-1069
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Block wall perpendicular/parallel to fluted metal deck (Max. JW=2-1/2")
-
HW-D-1070
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Block wall to underside of flat concrete (Max. JW=2-1/2")
-
HW-S-0053 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor or fluted metal roof deck (Max. JW=0")
-
HW-S-0054
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor or fluted metal roof deck (Max. JW=0")
-
HW-S-0069
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to underside of offset I-beam with Z-bar extentions (Max. JW=1")
-
HW-S-0090
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to wood floor/ceiling assembly (Max. JW=1/2")
-
WW-D-0032
- Joint type: Wall-to-Wall
- Assembly rating: 3 Hour
- Concrete wall to wall joint (Max. JW=1") (CP 606 only, backer rod optional)
-
WW-D-0040
- Joint type: Wall-to-Wall
- Assembly rating: 4 Hour
- Gypsum wall to concrete/block wall joint (Max. JW=1")
-
WW-D-0064
- Joint type: Wall-to-Wall
- Assembly rating: 3 Hour
- Concrete wall to wall joint (Max. JW=2")
-
WW-D-0067
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum wall to wall joint (Max. JW=2")
-
WW-D-0068
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete wall joint (Max. JW=2")
-
WW-D-0105
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete/block wall joint (Max. JW=1") (Polyethylene Backer Rod)
-
WW-D-1011
- Joint type: Wall-to-Wall
- Assembly rating: 3 Hour
- Concrete wall to wall joint (Max. JW=3-1/2")
-
WW-D-1047
- Joint type: Wall-to-Wall
- Assembly rating: 4 Hour
- Concrete wall to wall joint (Max. JW=2")
-
WW-D-1080
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=3")
-
WW-S-0042
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=1") (Exterior side sealed with 790 or 795 Dow Sealant, Pensil 300 Sealant, or Dynatrol II caulk or 864 Pecora Sealant)
-
WW-S-0048
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to gypsum wall joint (gypsum sitting on top of block) (Max. JW=3/4")
-
WW-S-0059
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete wall (Max. JW=1")
-
C-AJ-2631 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, ABS, CPVC, or FRPP (c,v) with a sheet metal cover plate (2-1/2" concrete) (AS=0" to 3-1/2") (CP 643N Firestop Collar, Mineral Wool & FS-ONE MAX)
-
C-AJ-2632 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC/CPVC with 1" glass fiber pipe insulation (c) (AS=3/16" to 1-1/8") (Includes Hollow-Core)
-
C-AJ-2659
- Assembly rating: 3 Hour
- Cable bundle (various cables) in flexible nylon raceway (PVC sleeve optional) (AS=0" to 3")
-
C-AJ-2660
- Assembly rating: 2 Hour
- Cable bundle (various cables) in flexible nylon raceway (steel sleeve optional) (AS=0" to 3")
-
C-AJ-3070
- Assembly rating: 3 Hour
- Cables (separated)
-
C-AJ-3084
- Assembly rating: 3 Hour
- Cable bundle (telephone cables) Optional PVC sleeve
-
C-AJ-3095
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional) (2-1/2" Concrete)
-
C-AJ-3096
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional)
-
C-AJ-3138
- Assembly rating: 3 Hour
- Single cable (telephone cable) (AS=1/4" to 1/2")
-
C-AJ-3152
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Steel sleeve)
-
C-AJ-3180
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional)
-
C-AJ-3181
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional) (AS=0" to 1-7/8")
-
C-AJ-3193
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Steel sleeve optional) (AS=1")
-
C-AJ-3208
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Optional PVC or steel sleeve) (AS=0" to 1") (CP 618 Firestop Putty Stick & Mineral Wool)
-
C-AJ-3216
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Optional Steel or PVC sleeve) (CFS-PL Firestop Plug) (AS=0" to 3")
-
C-AJ-3232
- Assembly rating: 2 Hour
- Cable bundle (various cables) (P-W Steel Sleeve) with CFS-BL Firestop Block
-
C-AJ-3236
- Assembly rating: 2 Hour
- Single Cable (4/C 750 kcmil TEK Cable) (AS=0" to 3")
-
C-AJ-3279
- Assembly rating: 2 Hour
- Cable bundle (various cables) in PVC sleeve (2-1/2" concrete) (CP 643N & CP 618 Putty Stick)
-
C-AJ-3285
- Assembly rating: 3 Hour
- Blank or cables through CP 653 Speed Sleeve (top side access) (T-rating, mineral wool & sealant)
-
C-AJ-3320
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Optional PVC or Steel Sleeve) with CFS-CC Firestop Cable Collar
-
C-AJ-4034
- Assembly rating: 3 Hour
- Max. 18" x 6" & Max. 24" x 4" Aluminum or Steel Open Ladder Cable Tray(s) (CFS-BL Firestop Block) (AS varies)
-
C-AJ-4035
- Assembly rating: 3 Hour
- Max. 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray (CFS-BL Firestop Block) (AS=1" to 4")
-
C-AJ-4054
- Assembly rating: 2 Hour
- Max. 24" x 4" Aluminum Open Ladder Cable Tray (CP 620 Fire Foam) (AS=0" to 5")
-
C-AJ-4071
- Assembly rating: 2 Hour
- Max. 24" x 6" Aluminum or Steel Open Ladder Cable Tray (FS-ONE MAX & Mineral Wool) (AS=0" to 6")
-
C-AJ-4083
- Assembly rating: 2 Hour
- Max 36" x 6" Steel or Aluminum Open Ladder Cable Tray (CFS-BL Firestop Block) (AS=0" to 2-1/4")
-
C-AJ-5044
- Assembly rating: 3 Hour
- Max. 3" steel or copper with Nom. 1" glass fiber insulation (max qty 4) (Max Opening = 24" x 8")
-
C-AJ-5061
- Assembly rating: 3 Hour
- Max. 20" steel, cast iron, max. 6" copper pipe with max. 3" Glass fiber insulation & 3" Mineral fiber insulation (Steel sleeve optional)
-
C-AJ-5069
- Assembly rating: 2 Hour
- Max. 12" steel, max. 6" copper pipe with max. 3" Cellular Glass (FOAMGLASS) insulation (Steel sleeve optional) (AS=3/4" to 3")
-
C-AJ-5091
- Assembly rating: 2 Hour
- Max. 12" steel, cast iron or Max. 6" copper with Max. 2" glass fiber or calcium silicate insulation (Steel sleeve optional) (AS=1/2" to 12")
-
C-AJ-5096
- Assembly rating: 2 Hour
- Max. 12" steel, max. 6" copper with max. 1-1/2" glass fiber insulation (Steel sleeve optional) (2-1/2" concrete) (AS=1/2" to 1-7/8")
-
C-AJ-5185
- Assembly rating: 3 Hour
- Max. 24" steel, cast iron or Max. 4" copper with Nom. 3" thick mineral fiber insulation butted up to firestop assembly (AS=0" to 1-7/8")
-
C-AJ-5230
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or copper pipe w/ max. 2" glass fiber (sleeve w/ welded flange)
-
C-AJ-5265
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, or copper pipe w/ max. 2" glass fiber (optional sleeve) (AS=1/4" to 1-5/8")
-
C-AJ-5277
- Assembly rating: 2 Hour
- Max. 12" steel, 6" copper with nom. 1-1/2" or 3" thick Cellular Glass (FoamGlass) pipe insulation in min. 2-1/2" concrete
-
C-AJ-5289
- Assembly rating: 3 Hour
- Max. 2" copper, steel, or cast iron with 1/2" to 1" AB/PVC insulation (Optional steel sleeve) (bottom side access) (AS=3/16" to 3/4") (CP 648E wrap insert & FS-ONE MAX)
-
C-AJ-5295
- Assembly rating: 2 Hour
- Max. 3" steel, cast iron, or copper with 2" polyisocyanurate foam insulation (AS=1/4" to 5/8")
-
C-AJ-5320 (US Only)
- Assembly rating: 2 Hour
- Insulated Max. 4" PVC or CPVC with 1" Glass Fiber (AS=0" to 1/2") or Max. 1" PVC or CPVC with 3/4" AB/PVC (AS=0" to 3/16")
-
C-AJ-5341
- Assembly rating: 2 Hour
- Max. 10" steel/cast iron with 1" to 3" glass fiber insulation (optional steel sleeve) (AS=1/2" to 2-1/8") (CP 648E wrap insert & FS-ONE MAX)
-
C-AJ-5342
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or copper with 1" to 2" glass fiber insulation (optional steel sleeve) (bottom side access) (AS=1/2" to 1-1/2") (CP 648E wrap insert & FS-ONE MAX)
-
C-AJ-6006
- Assembly rating: 3 Hour
- Electrical busway (23" x 4-1/2") (2-1/2" concrete) (CP 637 Firestop Mortar) (AS=Min. 1")
-
F-A-1193
- Assembly rating: 3 Hour
- Max. 3" steel, cast iron, copper, conduit, or EMT (Max Qty 5) through CFS-CID MD [M or P] (Min. 4-1/2" Concrete)
-
C-AJ-0055
- Assembly rating: 3 Hour
- Max. 4" steel pipe sleeve blank opening (CFS-BL Firestop Block)
-
C-AJ-0058
- Assembly rating: 3 Hour
- Max. 4" blank opening (no sleeve)
-
C-AJ-0070
- Assembly rating: 2 Hour
- Max. 7" un-sleeved blank opening
-
C-AJ-0074
- Assembly rating: 1 Hour
- Max. 32" x 32" un-sleeved blank opening (Min 2-1/2" Concrete) (CP 637 Firestop Mortar)
-
C-AJ-0081
- Assembly rating: 4 Hour
- Max. 32" x 32" un-sleeved blank opening (CP 637 Firestop Mortar)
-
C-AJ-0082
- Assembly rating: 3 Hour
- Max. 288 sq. in. un-sleeved blank opening with max. dimension of 24" (CP 637 Firestop Mortar)
-
C-AJ-0086
- Assembly rating: 3 Hour
- Max. 6" un-sleeved blank opening
-
C-AJ-0090
- Assembly rating: 2 Hour
- Max. 6" blank opening (optional steel pipe sleeve)
-
C-AJ-0097
- Assembly rating: 2 Hour
- Max. 4" blank opening (Steel sleeve optional for CFS-PL Firestop Plug)
-
C-AJ-0138
- Assembly rating: 2 Hour
- Max 12" x 24" Blank Opening Through Concrete Floor/Wall or Block Wall Assembly with CFS-BL Firestop Block
-
C-AJ-1149
- Assembly rating: 2 Hour
- Max. 10" steel, cast iron, max. 4" copper, steel conduit or EMT pipe (AS=0" to 1-1/4")
-
C-AJ-1154
- Assembly rating: 3 Hour
- Max. 10" steel, max. 4" copper, steel conduit or EMT pipe (backer rod or foam as backer) (AS=0" to 3-1/4")
-
C-AJ-1156
- Assembly rating: 3 Hour
- Max. 21" steel pipe (AS=0" to 3")
-
C-AJ-1158
- Assembly rating: 2 Hour
- Max. 10" steel or cast iron pipe (AS=0" to 1-1/4")
-
C-AJ-1184
- Assembly rating: 3 Hour
- Max. 10" steel, cast iron, max. 4" copper, steel conduit or EMT pipe (includes Hollow Core) (AS=0" to 3-1/4")
-
C-AJ-1278
- Assembly rating: 3 Hour
- Max. 30" steel, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 7/8")
-
C-AJ-1291
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (2-1/2" Concrete) (AS=0" to 7/8")
-
C-AJ-1326
- Assembly rating: 2 Hour
- Max. 1" flexible steel conduit (AS=1/2" to 1-1/2")
-
C-AJ-1346
- Assembly rating: 2 Hour
- Max. 1" flexible steel conduit or steel gas piping (2-1/2" Concrete) (AS=1/2" to 1-1/4")
-
C-AJ-1380
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (2-1/2" Concrete) (AS=0" to 1-7/8")
-
C-AJ-1435
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 1-7/8")
-
C-AJ-1453 (US Only)
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, steel conduit, or max. 4" EMT pipe (optional sleeve) (AS=0" to 2")
-
C-AJ-1454
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, copper, conduit, or 4" EMT (sleeve w/ welded flange) (AS varies)
-
C-AJ-1513
- Assembly rating: 2 Hour
- Max. 4" steel conduits, EMT's, or max. 2" flexible steel gas piping (one or more) in 30" x 8" opening (AS=0" to 12")
-
C-AJ-1517
- Assembly rating: 2 Hour
- Max. 24" steel, cast iron, max. 6" copper, conduit, or max. 4" EMT (AS=0" to 2")
-
C-AJ-1534
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" steel conduit, max. 4" copper or EMT (bottoms side access) (AS=0" to 1-7/8")
-
C-AJ-1572
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron, steel conduit or EMT (bottom side access) (AS=3/16" to 7/16") (CP 648S wrap insert)
-
C-AJ-1575
- Assembly rating: 3 Hour
- Max. 30" steel, cast iron, max. 6" steel conduit, max. 4" EMT and copper (sleeve optional) (min. 2-1/2" concrete) (bottom or top access) (with and without backer) (Includes Hollow-Core)
-
C-AJ-1597
- Assembly rating: 3 Hour
- Max. 8" steel, cast iron, max. 6" steel conduit, 4" EMT or copper (AS=0" to 2") (T-rating w/ Thermal Ceramics or Unifrax Duct Wrap)
-
C-AJ-1606
- Assembly rating: 2 Hour
- One or more max. 4" steel, cast iron, steel conduit, or EMT (max. 32" x 18" opening) (AS=0" to 7") (Mineral wool & CFS-SP WB Firestop Joint Spray)
-
C-AJ-1609
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, EMT, or 3" copper (PVC sleeve) (AS = 0" to 2-7/8")
-
C-AJ-1610
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or steel conduit (T-rating w/ fiberglass duct wrap) (AS=0" to 1-1/2")
-
C-AJ-2095 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC or CPVC (closed or open) (AS=0" to 1/2")
-
C-AJ-2109 (US Only)
- Assembly rating: 3 Hour
- Max.10" PVC, CPVC, max 6" FRPP or ABS (c, v) (optional sleeve) (AS=0" to 1/2" on pipes 6" and smaller, 0" to 1-1/4" on pipes larger than 6") (CP 643N or CP 644 Firestop Collar & Sealant)
-
C-AJ-2110 (US Only)
- Assembly rating: 3 Hour
- Max. 6" PVC, CPVC, FRPP or ABS with sheet metal cover plate (optional steel sleeve) (c,v) (Includes Hollow Core) (AS=1/4" to 1-1/4") (CP 643N Firestop Collar & Sealant)
-
C-AJ-2118 (US Only)
- Assembly rating: 3 Hour
- Max. 6" glass pipe (closed or open) (AS=1/4" to 3-1/2")
-
C-AJ-2167 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=0" to 5/8") (FS-ONE MAX only)
-
C-AJ-2217 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVDF or 4" PP (closed or open) (AS=0" to 3/8") (CP 643N collar & FS-ONE MAX)
-
C-AJ-2220
- Assembly rating: 3 Hour
- Max. 2" PVC, CPVC, FRPP or ABS (closed or open) (AS=1/2" to 1-1/8") (FS-ONE MAX only)
-
C-AJ-2243 (US Only)
- Assembly rating: 3 Hour
- Nom. 6" PVC and max. 4" PVDF plastic pipe (double-contained) (AS=0" to 1/2")
-
C-AJ-2272 (US Only)
- Assembly rating: 2 Hour
- Max. 6" Fiberglass reinforced pipe (FRP) (closed or open) (AS=0" to 1/2")
-
C-AJ-2283 (US Only)
- Assembly rating: 2 Hour
- Max. 8" PVC and max. 4" PVDF plastic pipe (closed or open) (double-contained) (AS=0" to 1-3/8") (CP 644 Firestop Collar, FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2285 (US Only)
- Assembly rating: 2 Hour
- Max. 8" PP and max. 4" PP plastic pipe (closed system) (double-contained) (AS=0" to 1-3/8") (CP 644 Firestop Collar, FS-ONE MAX & CF-AS CJP or CF 812 Filler Foam)
-
C-AJ-2305
- Assembly rating: 2 Hour
- Max. 8" PVC (Sch. 40), CPVC (SDR 13.5), PVC (Sch. 80), or CPVC (Sch. 40 or Sch. 80) (4 wrap CP 648E & retaining collar).
-
C-AJ-2335 (US Only)
- Assembly rating: 3 Hour
- Max. 3" PVC or CPVC (closed) (AS=1/4" to 1-1/4") (FS-ONE MAX & Mineral Wool)
-
C-AJ-2337 (US Only)
- Assembly rating: 3 Hour
- Max. 4" ABS (Double-Stacked CP 648E wrap insert) (AS=3/16" to 5/16")
-
C-AJ-2342 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, ABS, FRPP or CPVC plastic pipe (c,v) (2-1/2" concrete) (AS varies) (CP 648E wrap insert & sealant)
-
C-AJ-2343 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, CPVC, ABS, or FRPP (closed or open) (AS=0" to 1/2")
-
C-AJ-2371 (US Only)
- Assembly rating: 3 Hour
- Max. 6" PVC, CPVC, ABS, or FRPP (closed or open)
-
C-AJ-2372 (US Only)
- Assembly rating: 3 Hour
- Max. 3" PVC or CPVC (AS=3/16" to 5/16") (CP 648E or CP 648S wrap insert & sealant)
-
C-AJ-2392 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC (AS=3/16" to 5-5/16") (CP 648E wrap insert & CP 620 foam)
-
C-AJ-2393 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC (AS=3/16" to 5/16") (CP 648E wrap insert & FS-ONE MAX)
-
C-AJ-2407 (US Only)
- Assembly rating: 2 Hour
- Multiple max. 3" CPVC, max. 2" PVC, RNC, ENT, max. 1" OFR or PEX (closed systems only) (sleeve optional) (FS-ONE MAX only)
-
C-AJ-2409 (US Only)
- Assembly rating: 3 Hour
- Max. 10" FRPP plastic pipe (closed or open) (AS=0" to 3-3/8")
-
C-AJ-2420
- Assembly rating: 3 Hour
- Nominal 10" or 12" PVC or CPVC (c,v) (AS=1/4" to 1")
-
C-AJ-2434 (US Only)
- Assembly rating: 3 Hour
- Max. 4" ABS, PVC, or CPVC (AS=0' to 1/2") - Nonsymmetrical
-
C-AJ-2435 (US Only)
- Assembly rating: 2 Hour
- Max. 4" ABS, PVC or CPVC (AS=0" to 1/2") (CP 648E 1" wrap strip & retaining collar)
-
C-AJ-2468 (US Only)
- Assembly rating: 2 Hour
- Max. 4" diameter Insulated Beverage Lines (PE or PEX) w/ max. 3/4" AB/PVC (AS=3/16" to 1-13/16")
-
C-AJ-2565 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, ABS, FRPP, or RNC (closed or open) (AS varies) (CP 648S wrap insert & CP 620 foam)
-
C-AJ-2566 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, ABS, FRPP, or RNC (closed or open) (AS varies) (CP 648S & CP 620 Fire Foam)
-
C-AJ-2567 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, RNC, PEX or PP (sleeve optional) (AS w/sleeve = 1/4" to 1-3/8") (AS w/o sleeve = 0" to 1-5/8") (Includes Hollow-Core)
-
C-AJ-2569 (US Only)
- Assembly rating: 2 Hour
- Max.4" PVC, ABS, or CPVC (closed or open) (sleeve optional on pipes 3" and smaller) (AS varies) (bottom side access)
-
C-AJ-2613 (US Only)
- Assembly rating: 2 Hour
- Max. 2" Fusiotherm, Climatherm, or Polystar PP plastic pipe (closed or vented) (mfd. by Aquatherm or Orion) (Includes Hollow-Core) (AS=0" to 5/16")
-
F-A-2315 (US Only)
- Assembly rating: 2 Hour
- Multiple max. 2" PVC, CPVC or max. 1" ENT (c) (Max Qty 3) through CFS-CID MD P Cast-In Device for Metal Deck w/ Mineral Wool (Min 4-1/2" concrete)
-
W-J-0010
- Assembly rating: 2 Hour
- Max. 4" blank opening (optional sleeve) (sleeve required for CMU) with CFS-PL Firestop Plug
-
W-J-0015
- Assembly rating: 2 Hour
- Blank opening (Max. area of opening - 240 sq. in. with max. dimension of 20")
-
W-J-1020
- Assembly rating: 2 Hour
- Max. 4" steel, copper, conduit or EMT pipe (AS=3/4" to 3-1/2")
-
W-J-1021
- Assembly rating: 2 Hour
- Max. 18" steel or max. 4" copper pipe (AS=0" to 3")
-
W-J-1041
- Assembly rating: 4 Hour
- Max. 12" steel, cast iron, max. 6" copper, conduit or max. 4" EMT in sleeve (4 Hour) (AS=7/8" to 1")
-
W-J-1058
- Assembly rating: 2 Hour
- Max. 8" steel or cast iron pipe or max. 4" conduit or EMT with 2" glass fiber through wall and 2" beyond (AS=0" to 3/8")
-
W-J-1067
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" steel EMT, or max. 2" aluminum pipe or EMT (AS=0" to 2-1/4") (FS-ONE MAX only)
-
W-J-1068
- Assembly rating: 4 Hour
- Max. 6" steel, copper, conduit or max. 4" EMT pipe in sleeve (4 Hour) (AS=1/2" to 1-1/4")
-
W-J-1088
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" conduit, max. 4" copper, EMT, or max. 2" flexible steel conduit (shaft wall) (AS=1/4" to 1-5/8")
-
C-AJ-6036
- Assembly rating: 2 Hour
- Electrical busway (23" x 4-1/2", qty 1) or (11-1/4" x 4-1/2", qty 2) (AS=1/4" to 5-3/4") with CP 620 Fire Foam & Mineral Wool
-
C-AJ-6042
- Assembly rating: 2 Hour
- Electrical busway (23" x 4-1/2", qty 1) or (11-1/4" x 4-1/2", qty 2) (AS=1/4" to 5-3/4") (CFS-BL Firestop Block)
-
C-AJ-7006
- Assembly rating: 3 Hour
- Max. 36" grease duct manufactured by Metal-Fab (AS=1")
-
C-AJ-7029
- Assembly rating: 2 Hour
- Flamebar BW 11 Fire Rated Duct Work (Max. perimeter of 13.3 ft with Max. dimension 40") (CP 637 Firestop Mortar) (AS=2")
-
C-AJ-7030
- Assembly rating: 2 Hour
- Insulated Flamebar BW11 Coated Fire Rated Ductwork (CP 637 Firestop Mortar) (AS=2")
-
C-AJ-7046
- Assembly rating: 3 Hour
- Max. 32" x 32" sheet metal duct (w/o damper) (AS=1/4" to 1-1/2") (Silicone Sealant & Mineral Wool)
-
C-AJ-7051
- Assembly rating: 3 Hour
- Max. 30" x 30" sheet metal duct (w/o damper) (AS=1/4" to 1-3/4")
-
C-AJ-7084
- Assembly rating: 2 Hour
- Max. 20" spiral wound duct (min 24 ga) or Max. 12" sheet metal duct (min 28 ga) (AS=0" to 1-1/2")
-
C-AJ-7103
- Assembly rating: 2 Hour
- Max. 6" sheet metal duct w/o damper (bottom side access) (Includes hollow-core) (AS=0" to 2")
-
C-AJ-7104
- Assembly rating: 2 Hour
- Max. 24" x 12" sheet metal duct w/o damper (bottom side access) (AS=0" to 2")
-
C-AJ-7111
- Assembly rating: 2 Hour
- Max. 30" x 30" sheet metal duct w/o damper (Min. 2-1/2" concrete) (AS=1/4" to 1-3/4")
-
F-A-1192
- Assembly rating: 3 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT through CFS-CID MD [M or P] (Min. 2-1/2" Concrete for 2 HR & Min. 4-1/2" Concrete for 3 HR)
-
C-AJ-7123
- Assembly rating: 2 Hour
- Max. 24" x 24" steel air or grease duct with 2 layers of 1-1/2" Duct Wrap by Unifrax (AS=1")
-
C-AJ-7140
- Assembly rating: 2 Hour
- Max. 38" Fyreguard Grease Duct, mfg by Schebler Co (AS=1/2" to 1-1/2")
-
C-AJ-8038
- Assembly rating: 3 Hour
- Multiple insulated and non-insulated copper pipes (max. 3") (AS=1" to 2-1/4")
-
C-AJ-8041
- Assembly rating: 3 Hour
- Multiple insulated and non-insulated steel and copper pipes (max. 3" steel/copper) (AS varies)
-
C-AJ-8044
- Assembly rating: 3 Hour
- Insulated and non-insulated steel and copper pipe (max. 1" steel/copper) (AS=3/8" to 2")
-
C-AJ-8056
- Assembly rating: 3 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, cable tray or cables (single or bundled) (AS varies) (CFS-BL Firestop Block)
-
C-AJ-8081
- Assembly rating: 2 Hour
- Max. 6" steel tube and cables (AS varies)
-
C-AJ-8095
- Assembly rating: 4 Hour
- Max. 26" steel, 15" cast iron, 6" copper or steel conduit, or 4" EMT pipe and cable trays with CP 637 Firestop Mortar (4 Hour)
-
C-AJ-8099
- Assembly rating: 3 Hour
- Insulated or non-insulated copper or steel, flexible steel gas lines, cables (single or bundled), or flexible steel conduit (includes Hollow Core) (AS Varies)
-
C-AJ-8100
- Assembly rating: 3 Hour
- Insulated or non-insulated copper or cables (single or bundled) (AS varies) (CFS-BL Firestop Block)
-
C-AJ-8107
- Assembly rating: 3 Hour
- Max. 2" EMT or conduit, single or bundled cables, Max. 2" PVC Innerduct (AS varies) (CFS-BL Firestop Block)
-
C-AJ-8110
- Assembly rating: 3 Hour
- Max. 8" steel, cast iron, 6" copper, steel conduit, or max. 4" EMT, Max. 2" Innerduct, Cable Tray, Large cables, (various cables) (AS varies) (CFS-BL Firestop Block)
-
C-AJ-8143
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic pipes, conduits and cables (single or bundled) in max. 30" x 48" opening (AS varies) (FS-ONE MAX & Mineral Wool)
-
C-AJ-8166
- Assembly rating: 3 Hour
- HVAC line set (optional sleeve) (bottom side access) (Includes Hollow-Core)
-
C-AJ-8177
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic pipes, conduits, non-metallic pipes cables, and sheet metal duct (CP 637 Firestop Mortar)
-
C-AJ-8207
- Assembly rating: 3 Hour
- Multiple penetrations through concrete floor/wall or block wall (Max Area=18 sq ft with Max Dimension=6 ft) (CFS-BL Firestop Block)
-
C-AJ-8209
- Assembly rating: 3 Hour
- Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
-
C-AJ-8211
- Assembly rating: 2 Hour
- Multiple penetrating items through concrete floor/wall or block wall (CFS-BL Firestop Block)
-
C-BJ-0022
- Assembly rating: 2 Hour
- Max. 24" x 12" unsleeved opening with CFS-BL Firestop Block and sheet metal cover plate fastened to steel channel sheathing
-
C-BJ-1034
- Assembly rating: 4 Hour
- Max. 4" steel, conduit or EMT pipe (4 Hour) (AS=3/4" to 3")
-
C-BJ-1037
- Assembly rating: 4 Hour
- Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe (Sleeve Optional) - Hebel Autoclaved Aerated Concrete (4 Hour)
-
C-BJ-1046
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit, or max. 4" EMT pipe (Hollow-Core Floor)
-
C-BJ-1047
- Assembly rating: 2 Hour
- Max. 8" steel or cast iron (2 hour T-rating with Mineral Fiber Insulation) (CP 620 Fire Foam & Mineral Wool) (AS=0" to 1-3/8")
-
C-BJ-1055
- Assembly rating: 2 Hour
- Max. 2" steel or cast iron (2 Hour T-rating with Glass-Fiber Insulation) (AS=0" to 1-5/8")
-
C-BJ-1059
- Assembly rating: 3 Hour
- Multiple max. 1" flexible steel conduits or gas piping (Hollow Core) (AS=0" to 1-1/2")
-
C-BJ-2011 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PVC or CPVC (AS=1/4") (Hollow Core) (CP 648E or CP 648S wrap insert & sealant)
-
C-BJ-2012 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC (AS=1/4") (Hollow Core) (CP 648E wrap insert & FS-ONE MAX)
-
C-BJ-2014 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, or RNC (closed) (Hollow Core) (AS=0" to 1-5/8")
-
C-BJ-2016 (US Only)
- Assembly rating: 4 Hour
- Max. 2" PVDF plastic pipe (closed or open) (sleeved) (AS=0" to 5/8")
-
C-BJ-2017 (US Only)
- Assembly rating: 4 Hour
- Max. 4" PVC or CPVC (c,v) (6" Concrete) (Includes Hollow Core) (4 Hour) (AS=0" to 1/2")
-
C-BJ-2021 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, CPVC, FRPP or ABS (c,v) (Hollow Core) (AS=0" to 1/2")
-
C-BJ-2028 (US Only)
- Assembly rating: 3 Hour
- Bundle of max. 1" PVC, RNC, ENT, or PEX (c) (max qty = 6) (Hollow Core) (AS=0" to 1-1/2")
-
C-BJ-2040 (US Only)
- Assembly rating: 3 Hour
- Max. 2" CPVC, BlazeMaster CPVC, or PEX (c) (Hollow Core) (AS=1/8" to 1/2")
-
C-BJ-3024
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Hollow Core) (bottom side access) (AS=Max. 1")
-
C-BJ-4025
- Assembly rating: 2 Hour
- Max. 20" wide Cable Rack (Telecom) (AS= Min. 1")
-
C-BJ-4026
- Assembly rating: 2 Hour
- Max. 20 wide Cable Rack (Telecom) (AS= Min. 1")
-
C-BJ-5015
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron, or copper with 1" glass fiber insulation (bottom side access) (AS=0" to 1-7/8")
-
C-BJ-5018
- Assembly rating: 2 Hour
- Max. 4" steel or copper with Nom. 1" AB/PVC insulation (Hollow Core) (AS=0" to 7/8")
-
C-BJ-7005
- Assembly rating: 3 Hour
- Max. 6" steel duct w/o damper (min 30 ga) (Hollow Core) (AS=0" to 1")
-
C-BJ-8010
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, copper, steel conduit, or max. 4" EMT, optional glass fiber insulation, Max. 4" cable bundle (precast autoclaved aerated concrete or roof/ceiling assembly) (CFS-BL Firestop Block)
-
C-BJ-8020
- Assembly rating: 2 Hour
- Multiple bundle of metallic pipes and cables (Hollow Core) (2 Hour T-rating with Glass Fiber Insulation) (AS=0" to 2")
-
C-BJ-8024
- Assembly rating: 2 Hour
- One or more HVAC line sets in 32" x 8" opening (6" concrete) (AS=1/2" to 12")
-
C-BJ-8027
- Assembly rating: 3 Hour
- Single HVAC Line set (8" hollow core) (AS=0" to 1-1/2")
-
CLIV (CP 617 Firestop Putty Pad)
- Assembly rating: 2 Hour
- Wall Opening Protective Materials (CLIV) (Outlet Boxes) - CP 617 Putty Pad
-
F-A-0008
- Assembly rating: 2 Hour
- Max. 6" un-sleeved blank opening (Min. 4-1/4" mineral wool & 1/4" silicone sealant)
-
F-A-1016
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe (2-1/2" Concrete) (CP 680-M, P or PX Cast-In Device)
-
F-A-1017
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe (CP 680-M, P or PX Cast-In Device)
-
F-A-1018
- Assembly rating: 2 Hour
- Max. 1" flexible steel conduit (AS=1/2" to 1-1/4")
-
F-A-1022
- Assembly rating: 3 Hour
- Max. 1" steel, copper, cast iron, steel conduit or EMT (Max. Qty 5) (CP 680-M, P or PX Cast-In Device)
-
F-A-1029
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 7/8")
-
F-A-1037
- Assembly rating: 3 Hour
- CP 681 Tub Box with max. 1-1/2" brass waste/overflow fittings
-
F-A-1051
- Assembly rating: 2 Hour
- Max. 2" Copper, brass or cast iron waste/overflow fittings with CP 637 Firestop Mortar
-
F-A-1091
- Assembly rating: 4 Hour
- Max. 6" steel, cast iron, steel conduit, max. 4" EMT or max. 2" copper (4 Hour) (CP 680-P or PX Cast-In Device)
-
F-A-1105
- Assembly rating: 2 Hour
- Max. 10" steel, cast iron, 6" steel conduit, or 4" EMT (2 Hour T-rating with Unifrax or Thermal Ceramics Duct Wrap)
-
F-A-1106
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, steel conduit, or EMT (CP 680-P or PX Cast-In Device) (2 Hour T-rating with Unifrax or Thermal Ceramics Duct Wrap)
-
F-A-1108
- Assembly rating: 2 Hour
- Max. 3" steel or cast iron with closet flange (AS=min 3/8") (Toilet - Floor Mounted Vitreous China Water Closet)
-
F-A-1134
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit or EMT (up against a wall) (AS = 0" to 1-1/2") (2 Hour T-rating w/ Thermal Ceramics or Unifrax Duct Wrap)
-
F-A-1135
- Assembly rating: 2 Hour
- Max. 12" x 12" x 10" cast iron floor sink with 4" cast iron drain (2 Hour T-rating w/ Duct Wrap)
-
F-A-1137
- Assembly rating: 2 Hour
- Max. 12" x 12" x 10" cast iron floor sink with 4" cast iron drain (concrete floor over metal deck) (2 Hour T-rating w/ Duct Wrap)
-
F-A-2025 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, CPVC, FRPP or ABS (closed or open) (AS = 0" to 1-1/2") (metal deck) (Sheet metal cover plate, CP 643N, Mineral Wool & FS-ONE MAX)
-
F-A-2046 (US Only)
- Assembly rating: 2 Hour
- Max. 2" Optical Fiber Raceway (Innerduct) (closed system only) (AS=1/2" to 1")
-
F-A-2053 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, CPVC, RNC (c,v) (2-1/2" concrete) (CP 680-P Cast-In Device)
-
F-A-2058 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=3/8" to 1") (Min. 2-1/2" concrete) (FS-ONE MAX Only)
-
F-A-2066 (US Only)
- Assembly rating: 3 Hour
- Max. 4" ABS or Nom. 6" FRPP (c,v) (4-1/2" concrete) (CP 680-P Cast-In Device)
-
F-A-2072 (US Only)
- Assembly rating: 3 Hour
- Nom. 3" or 4" PVC or ABS closet flange (v) (Toilet) (CP 680-P Cast-In Device)
-
F-A-2092 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC or CPVC (c,v) (CP 680-P Cast-In Device) (Min 4" mineral wool required when pipe diameter is smaller than CP 680 Cast-In size)
-
F-A-2093 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC with Shower Drain (v) through CP 680-P Cast-In Device
-
F-A-2094 (US Only)
- Assembly rating: 3 Hour
- CP 681 Tub Box with max. 1-1/2" PVC waste/overflow fittings
-
F-A-2095 (US Only)
- Assembly rating: 3 Hour
- CP 681 Tub Box with max. 1-1/2" PVC waste/overflow fittings
-
F-A-2141 (US Only)
- Assembly rating: 2 Hour
- Max 6" FRPP, max. 4" FRPP, PVDF, or PP (c,v) (CP 680-P Cast-In Device)
-
F-A-2142 (US Only)
- Assembly rating: 2 Hour
- Max. 4" bundle PEX tubing (max. 1/2" diameter) (CP 680-P Cast-In Device)
-
F-A-2143 (US Only)
- Assembly rating: 2 Hour
- Max. 4" ABS, PVC, or CPVC with pipe coupling (2-1/2" concrete over metal deck) (AS=0" to 1-1/2") (Sheet metal cover plate)
-
F-A-2145 (US Only)
- Assembly rating: 3 Hour
- Max. 2" Flowguard Gold, or max. 3" Blazemaster CPVC pipe (c) (CP 680-P Cast-In Device)
-
F-A-2154 (US Only)
- Assembly rating: 2 Hour
- Max 4" PVC, ABS, or CPVC transitioning to Cast Iron or steel (c, v) (Hanger straps, retaining collar & CP 648E wrap strip)
-
F-A-2156
- Assembly rating: 3 Hour
- Max. 2" PVC shower drain fitting with CP 681 75/2"N Firestop Drain Flange or CP 681 SD-FD
-
F-A-2166 (US Only)
- Assembly rating: 4 Hour
- Max. 6" PVC, CPVC, or RNC (c,v) (4 Hour) (CP 680-P Cast-In Device)
-
F-A-2177 (US Only)
- Assembly rating: 2 Hour
- Nom. 1-1/2" or 2" PVC waste/overflow fittings with CP 681 tub box (6" Concrete) (CP 680-P 3" or PX 3" Cast-In Device with mineral wool)
-
F-A-2205 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, Aquatherm Greenpipe PP-R, or Uponor AquaPEX or Wirsbo hePEX with Max. 2" glass fiber insulation (CP 680-P or PX Cast-In Device)
-
F-A-2213 (US Only)
- Assembly rating: 3 Hour
- Max. 6" PVC, ABS, CPVC, FRPP or 2" Greenpipe PP-R by Aquatherm (CFS-DID MD Drop-In Device)
-
F-A-1194
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, conduit, or EMT through CFS-CID MD P (Min. 4-1/2" Concrete) (2 Hour T-rating with Unifrax or Thermal Ceramics Duct Wrap)
-
F-A-3007
- Assembly rating: 3 Hour
- Cable bundle (various cables) through CP 680-M or P Cast-In Device with 1" CP 618 Putty Stick
-
F-A-3019
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Unique Sleeve)
-
F-A-3022
- Assembly rating: 3 Hour
- Cable bundle (various cables) (P-W Steel Sleeve) with CFS-BL Firestop Block
-
F-A-3034 (US Only)
- Assembly rating: 3 Hour
- Nom. 4/C No 500 kcmill TEK Cable (CP 680-M, P or PX Cast-In Device)
-
F-A-4003
- Assembly rating: 2 Hour
- Max. 24" x 6" Aluminum or Steel Open Ladder Cable Tray (Silicone Sealant & Mineral Wool) (AS=0" to 6")
-
F-A-5009
- Assembly rating: 2 Hour
- Max. 10" steel pipe with 2" glass fiber insulation (AS=1/4" to 1/2) (Retaining collar with FS-ONE MAX)
-
F-A-5015
- Assembly rating: 2 Hour
- Max. 4" steel or copper pipe with nominal 3/4" or 1" AB/PVC insulation (2-1/2" concrete) (CP 680-M, P or PX Cast-In Device)
-
F-A-5016
- Assembly rating: 3 Hour
- Max. 4" steel or copper pipe with nominal 3/4" or 1" AB/PVC insulation (4-1/2" concrete) (CP 680-M, P or PX Cast-In Device)
-
F-A-5017
- Assembly rating: 2 Hour
- Max. 4" steel or copper pipe with max. 2" thickness glass-fiber insulation (2-1/2" concrete) (CP 680-M, P or PX Cast-In Device)
-
F-A-5019
- Assembly rating: 2 Hour
- Max. 4" steel or copper pipe with max. 3/4" thick AB/PVC insulation (AS = 0" to 1-3/8") (2-1/2" concrete)
-
F-A-5021
- Assembly rating: 2 Hour
- Max. 12" steel or max. 6" copper pipe with nom. 1-1/2" thickness glass-fiber insulation (2-1/2" concrete) (AS=1/2" to 1-7/8")
-
F-A-5036
- Assembly rating: 2 Hour
- Max. 1-1/2" steel, cast iron or copper with 1" glass fiber or 3/4" AB/PVC (max qty = 5) (2-1/2" concrete)
-
F-A-5046
- Assembly rating: 3 Hour
- Max. 4" steel, cast iron or copper with 3/4" or 1" ABPVC / 1", 1-1/2" or 2" of glass fiber (CFS-DID MD Drop-In Device)
-
F-A-6002
- Assembly rating: 2 Hour
- Electrical busway (23" x 4-1/2") (AS=1/2" to 6-1/2") (4" mineral wool & 1/2" silicone sealant)
-
F-A-7018
- Assembly rating: 3 Hour
- Max. 6" sheet metal duct w/o damper (min 28 ga) (CP 680-P 6" Cast-In Device)
-
F-A-8016
- Assembly rating: 3 Hour
- Multiple HVAC Line Sets through CP 680-M, P or PX Cast-In Device
-
F-A-8023
- Assembly rating: 3 Hour
- Multiple bundle consisting of steel pipe, ENT, cable bundle through CP 680-P Cast-In Device
-
F-A-8027
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic pipes, cable bundles, steel conduits (max. 24" x 8" opening)
-
F-B-1009
- Assembly rating: 3 Hour
- Nom. 3" or 4" steel or cast iron with aerator fitting (Sovent) (5" or 6-1/2" concrete) (CP 680-M, P or PX Cast-In Device)
-
F-B-1010
- Assembly rating: 2 Hour
- Max. 6" steel or cast iron (2-hour T-rating with Mineral Fiber Insulation) (6" concrete floor) (CP 680-M, P or PX Cast-In Device)
-
F-B-1026
- Assembly rating: 3 Hour
- Max. 6" steel, cast iron, steel conduit, copper or 4" EMT through CFS-DID C Drop-In Device
-
F-B-1029
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit, copper or EMT through CFS-DID C or HC Drop-In Device
-
F-B-2029 (US Only)
- Assembly rating: 3 Hour
- Max. 4" PVC, ABS, CPVC, and RNC (Hollow Core) (AS varies) (CP 648S wrap insert & sealant)
-
F-B-2031
- Assembly rating: 3 Hour
- Max. 2" PVC drain piped with snap in strainer (Hollow Core) (AS=1" to 2-5/8") (CFS-BL Firestop Block)
-
F-B-2034 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" PP, 40mm Fusiotherm PP (Aquatherm), or 1-1/2" Polystar (Orion) plastic pipe (c, v) (CP 680-P Cast-In Device)
-
F-B-2045 (US Only)
- Assembly rating: 2 Hour
- Max. 3" or 4" PVC and toilet flange connecting to cast iron below floor (6" concrete) (CFS-CID CS Closet Stub Cast-In) (2 Hour T-rating w/ CP 643N Collar)
-
F-B-2048 (US Only)
- Assembly rating: 3 Hour
- Max. 6" PVC, ABS, CPVC or FRPP through CFS-DID C Drop-In Device
-
F-B-5004
- Assembly rating: 3 Hour
- Max. 4" steel, cast iron or copper with 3/4" or 1" ABPVC / 1", 1-1/2" or 2" of glass fiber insulation (CFS-DID C Drop-In Device)
-
F-C-0002
- Assembly rating: 2 Hour
- Max. 1" diameter blank opening
-
F-C-1009
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit or EMT pipe (AS=0" to 1")
-
F-C-1059
- Assembly rating: 2 Hour
- Max. 6" steel, cast iron, conduit, max. 4" EMT, or max. 2" flexible steel conduit (AS=1/4" to 3/4")
-
F-C-1134
- Assembly rating: 1 Hour
- Max. 4" cast iron toilet closet flange with cast iron fittings
-
F-C-1135
- Assembly rating: 1 Hour
- Max. 1-1/2" cast iron P-trap with PVC, ABS, or brass bathtub waste/overflow fittings
-
F-C-1142
- Assembly rating: 1 Hour
- Max. 1" copper, steel, cast iron, steel conduit, or EMT (membrane in ceiling) (AS=0" to 7/8")
-
F-C-1147
- Assembly rating: 1 Hour
- Max. 1" flexible steel conduit or gas piping (max qty = 3) (AS=0" to 1-1/4")
-
F-C-2029 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC (closed or open) (AS=0" to 1/2")
-
F-C-2030 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, ABS or FRPP (c,v) (AS=0" to 1/2") (CP 643N Firestop Collar & FS-ONE MAX)
-
F-C-2081 (US Only)
- Assembly rating: 2 Hour
- Max. 1" Polyethylene (PEX) SDR 9 Tubing (c,v) (AS=0" to 1/2")
-
F-C-2128 (US Only)
- Assembly rating: 2 Hour
- Max. 2" ABS, PVC or CPVC (c,v) (AS=0" to 5/8")
-
F-C-2160 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=1/2" to 1-1/8")
-
F-C-2189 (US Only)
- Assembly rating: 1 Hour
- Max. 2" ABS or PVC tub drain (closed or open)
-
F-C-2203 (US Only)
- Assembly rating: 1 Hour
- Max. 4" ABS or PVC toilet closet flange
-
F-C-2205 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings
-
F-C-2230 (US Only)
- Assembly rating: 1 Hour
- Max. 1" PEX (closed or open) (AS=1/4")
-
F-C-2231 (US Only)
- Assembly rating: 1 Hour
- Max. 2" PVC, CPVC (Sch. 40 or Sch. 80) or Max. 2" ABS (Sch. 40) (AS=0" to 1/4:)
-
F-C-2262 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings
-
F-C-2270 (US Only)
- Assembly rating: 1 Hour
- Max. 2" FlowGuard Gold or Blazemaster CPVC (c) (AS=0" to 5/8")
-
F-C-2382 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC or ABS with branch line (c,v) (AS=0" to 1/2")
-
F-C-2389 (US Only)
- Assembly rating: 1 Hour
- Max. 3" PVC, CPVC, ABS or Max. 2" ENT (AS=0" to 5/8") (3/4" FS-ONE MAX only)
-
F-C-2401 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC (c,v) against stud (AS=1/16")
-
F-C-2404 (US Only)
- Assembly rating: 1 Hour
- Max. 4" PVC or CPVC (c,v) (AS= Min. 1/16")
-
F-C-3044
- Assembly rating: 1 Hour
- Cable bundle (various cables) (AS=3/4")
-
F-C-3071 (US Only)
- Assembly rating: 1 Hour
- Cable bundle (various cables) (AS=0" to 1")
-
F-C-3094
- Assembly rating: 1 Hour
- Multiple SER cables in slotted opening
-
F-C-5037
- Assembly rating: 2 Hour
- Max. 2" copper, or steel pipe with max. 3/4" AB/PVC insulation (AS=1/2" to 1")
-
F-C-5066
- Assembly rating: 1 Hour
- Max. 4" copper, cast iron or steel pipe with 1-1/2" glass fiber (AS=0" to 7/8")
-
F-C-7013
- Assembly rating: 1 Hour
- Max. 4" diameter sheet metal duct w/o damper (min 28Ga) (AS=1/4" to 3/4")
-
F-C-7025
- Assembly rating: 1 Hour
- Max. 10" diameter (min. 28 Ga) or 4" diameter (min. 30 Ga) sheet metal duct w/o damper (AS=0" to 1")
-
F-C-7042
- Assembly rating: 1 Hour
- Mechanical support mechanisms (strut, steel cable, steel rod, steel angle) (AS=1/8" to 7/8")
-
F-C-7055
- Assembly rating: 1 Hour
- Max. 7" diamter or 10" x 4" steel air duct with 1/2” thick FireMaster DryerWrap, FireMaster FastWrap XL, or Pyrostate Duct Wrap XL by Thermal Ceramics (AS=2")
-
F-C-8009
- Assembly rating: 1 Hour
- Single HVAC Line Set (AS=0" to 1/2") (CP 643N Firestop Collar & FS-ONE MAX)
-
F-C-8014
- Assembly rating: 1 Hour
- Single HVAC Line Set (AS=1/4" to 3/4")
-
F-C-8026
- Assembly rating: 1 Hour
- Double HVAC Line Set (pvc drain) (FS-ONE MAX only)
-
F-C-8032
- Assembly rating: 1 Hour
- Double HVAC Line Set (no pvc drain) (CP 606 only)
-
F-C-8038
- Assembly rating: 1 Hour
- Multiple penetrating items (metal, insulated, PEX, cables) through 14" x 5-1/2" block out (AS = 0" to 1-1/2")
-
F-C-8044
- Assembly rating: 1 Hour
- Multiple penetrating items (metal, insulated, PEX, cables) through 14" x 5-1/2" block out (AS=0" to 1-1/2")
-
F-E-2005 (US Only)
- Assembly rating: 1 Hour
- Max. 2" PVC or CPVC plastic pipe through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=1/2" to 1-1/8")
-
F-E-2028 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" ABS or PVC bathtub drain with waste/overflow fittings through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=0" to 1")
-
F-E-2029 (US Only)
- Assembly rating: 1 Hour
- Max. 3" ABS, PVC, CPVC, or RNC through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=3/16" to 5/16")
-
F-E-5013
- Assembly rating: 1 Hour
- Max. 2" steel or copper pipe with nom. 1-1/2" glass fiber through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=1/2" to 1")
-
F-E-5004
- Assembly rating: 1 Hour
- Max. 2" steel or copper pipe with nom. 3/4" AB/PVC through Concrete & Steel Joist Floor/Ceiling Assembly (UL G500 Series) (AS=1/2" to 1")
-
F-A-2311 (US Only)
- Assembly rating: 3 Hour
- Max. 2" Flowguard Gold, or max. 3" Blazemaster CPVC pipe through CFS-CID MD P Cast-In Device for Metal Deck (Min 2-1/2" concrete)
-
F-A-2314 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC with Shower Drain (v) through CFS-CID MD P Cast-In Device for Metal Deck (Min 4-1/2" concrete)
-
W-J-1089
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" conduit, max. 4" copper, EMT, or max. 2" flexible steel conduit (shaft wall) (AS=0" to 1-7/8")
-
W-J-1095
- Assembly rating: 1 Hour
- Max. 1" flexible steel conduit (AS=0" to 3/4")
-
W-J-1123
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT (CP 620 Fire Foam) (AS=0" to 7-7/8")
-
W-J-1168
- Assembly rating: 2 Hour
- Max. 24" steel, cast iron, max. 6" steel conduit, copper, or max. 4" EMT (CFS-S SIL GG Firestop Silicone Sealant only)
-
W-J-1174
- Assembly rating: 2 Hour
- Max. 6" cast iron with "No-Hub" Connector (AS=0" to 1")
-
W-J-1191
- Assembly rating: 2 Hour
- Multiple max. 2" steel, steel conduits, or EMT
-
W-J-1193
- Assembly rating: 2 Hour
- Max. 12" steel, cast iron, max. 6" copper or steel conduit (sleeved) (AS=0" to 3-7/8")
-
W-J-1201
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit or EMT (one or more) (Mineral Wool & CFS-SP WB Firestop Joint Spray)
-
W-J-1202
- Assembly rating: 2 Hour
- Multiple max. 4" steel, steel conduit, or EMT
-
W-J-1210
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, 6" steel conduit, copper or 4" EMT (optional sleeve) (AS=0" to 1-7/8")
-
W-J-1214
- Assembly rating: 2 Hour
- Max. 1" steel conduit or EMT with steel junction box (AS=0" to 1-1/8")
-
W-J-1226
- Assembly rating: 4 Hour
- Max. 4" steel, cast iron, copper, steel conduit or EMT (AS=0" to 7/8")
-
W-J-2057 (US Only)
- Assembly rating: 4 Hour
- Max. 2" PVC or CPVC (closed system only) (4 Hour) (sleeved)
-
W-J-2069 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=9/16") (CP 648E wrap insert)
-
W-J-2071 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, ABS, FRPP, or PEX (AS=5/16") (CP 648E or CP 648S wrap insert)
-
W-J-2072 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC, CPVC, PEX or RNC (AS=0" to 5/8") (FS-ONE MAX only)
-
W-J-2091 (US Only)
- Assembly rating: 4 Hour
- Max. 6" PVC or CPVC (c, v) (4 Hour)
-
W-J-2101 (US Only)
- Assembly rating: 1 Hour
- Max. 3" PVC or CPVC (AS=1/4") (CP 648E or CP 648S wrap insert)
-
W-J-2107 (US Only)
- Assembly rating: 2 Hour
- Max. 9" PVDF (closed or open) (sheet metal sleeve & CP 648E wrap insert)
-
W-J-2108 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (AS=1/4" to 11/16") (Optional sleeve)
-
W-J-2115 (US Only)
- Assembly rating: 2 Hour
- Max. 12" Fiberglass Reinforced Pipe (FRP) (sheet metal sleeve & CP 648E wrap strip)
-
W-J-2120 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, or ABS (sheet metal sleeve & CP 648E wrap strip) (angled through wall)
-
W-J-2121 (US Only)
- Assembly rating: 2 Hour
- Max. 12" PVC or CPVC (sheet metal sleeve & CP 648E wrap strip)
-
W-J-2191 (US Only)
- Assembly rating: 4 Hour
- Max. 2" ENT (AS=3/16" to 5/16") (3 or 4 Hour) (CP 648E wrap insert & FS-ONE MAX)
-
W-J-2207 (US Only)
- Assembly rating: 2 Hour
- Max. 4" diameter bundle of max. 1" diameter PEX (closed) (AS=0" to 1")
-
W-J-2230
- Assembly rating: 2 Hour
- One or more Max. 2" ENT through CP 653 or CFS-SL GA L Speed Sleeve
-
W-J-2241
- Assembly rating: 2 Hour
- Cable bundle (various cables) through flexible nylon raceway (sleeve optional) (AS=0" to 3")
-
W-J-3036
- Assembly rating: 2 Hour
- Cable bundle (various cables) (sleeve optional) (AS=1/8" to 3/4")
-
W-J-3050
- Assembly rating: 4 Hour
- Cable bundle (various cables) (sleeved) (4 Hour) (AS=1/4" to 1")
-
W-J-3060
- Assembly rating: 2 Hour
- Cable bundle (various cables) (sleeved) (AS=0" to 1")
-
W-J-3092
- Assembly rating: 2 Hour
- Cable bundle (various cables) (PVC Sleeve) (AS=0" to 1-3/8")
-
F-A-3071
- Assembly rating: 3 Hour
- Cable bundle (various cables) through CFS-CID MD [M or P] (Min. 2-1/2" Concrete) with 1" CP 618 Putty Stick or 2" Mineral Wool
-
W-J-3110
- Assembly rating: 2 Hour
- Cable bundle (various cables) through Unique Split Sleeve
-
W-J-3111
- Assembly rating: 2 Hour
- Cable bundle (various cables) through unique threaded sleeve
-
W-J-3112
- Assembly rating: 4 Hour
- Cable bundle (various cables) in unique split sleeve or threaded sleeve (AS=1/4" to 1-1/4")
-
W-J-3167
- Assembly rating: 4 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve
-
W-J-3168
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve
-
W-J-3197
- Assembly rating: 2 Hour
- Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
W-J-3198
- Assembly rating: 2 Hour
- Blank or cables through CFS-SL RK Firestop Retrofit Sleeve Kit with CFS-PL Firestop Plug
-
W-J-4027
- Assembly rating: 2 Hour
- Max 24" x 4" Aluminum or Steel Open Ladder Cable Tray (AS=1" to 4") with CFS-BL Firestop Block
-
W-J-4029
- Assembly rating: 2 Hour
- Max 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray (AS=0" to 26")
-
W-J-4030
- Assembly rating: 2 Hour
- Max 24" x 4" Aluminum Open Ladder Cable Tray (CP 620 Fire Foam) (AS=0" to 5")
-
W-J-4059
- Assembly rating: 2 Hour
- Max 24" x 6" Aluminum or Steel Open Ladder Cable Tray (FS-ONE MAX & Mineral Wool) (AS=0" to 3")
-
W-J-4060
- Assembly rating: 4 Hour
- Max 36" x 6" Aluminum Open Ladder Cable Tray (CFS-BL Firestop Block) (AS=1" to 4")
-
W-J-4072
- Assembly rating: 2 Hour
- Max. 24" x 4" Aluminum or Steel Open Ladder or Solid Back Cable Tray (CFS-BL Firestop Block) (AS=0" to 26")
-
W-J-5028
- Assembly rating: 4 Hour
- Max. 12" steel or max 6" copper with 1-1/2" glass fiber insulation (sleeved) (AS=1-1/4" to 1-1/2")
-
W-J-5041
- Assembly rating: 2 Hour
- Max. 4" steel or max. 2" Copper with 3/4" AB/PVC insulation (AS=0" to 1-1/2") (FS-ONE MAX only)
-
W-J-5042
- Assembly rating: 3 Hour
- Max. 12" steel or 6" copper with 2" glass-fiber insulation (FS-ONE MAX only)
-
W-J-5066
- Assembly rating: 2 Hour
- Max. 1" copper with max. 3/4" thick AB/PVC insulation (Shaft Wall) (One Sided) (AS=1/4" to 1-1/8")
-
W-J-5122 (US Only)
- Assembly rating: 2 Hour
- Beverage Line Set - Max. 1/2" diameter PE or PEX tubing (Max qty = 12) with AB/PVC insulation (AS=0" to 1")
-
W-J-5136
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, or 2" copper with 3/4" AB/PVC pipe insulation (AS=0" to 7/8")
-
W-J-5145 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC with 1-1/2" glass fiber insulation or Max. 1" AB/PVC insulation (AS=0" to 1")
-
W-J-5150
- Assembly rating: 2 Hour
- Max. 12" steel or cast iron pipe with max. 4" calcium silicate pipe insulation (AS=0" to 1-1/4")
-
W-J-5151 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" CPVC (c) with 1" glass fiber (AS=1/4" to 7/8")
-
W-J-5152 (US Only)
- Assembly rating: 2 Hour
- Max. 2" CPVC (c) with 1" glass fiber or AB/PVC (AS=1/4" to 7/8")
-
W-J-7021
- Assembly rating: 2 Hour
- Max. 48" x 24" sheet metal duct w/o damper (AS=0" to 2")
-
W-J-7022
- Assembly rating: 2 Hour
- Max. 24" spiral wound duct w/o damper, or 12" sheet metal duct (AS=0" to 1-1/2")
-
W-J-7039
- Assembly rating: 2 Hour
- Max. 7" x 7" sheet metal duct w/o damper (Shaft Wall) (One sided) (AS=1/4" to 3/4")
-
W-J-7091
- Assembly rating: 2 Hour
- Max. 60" x 36" sheet metal duct w/o damper with max. 2" thick glass fiber duct insulation (Optional angles on ducts 45" x 25" and smaller) (AS=1/4" to 3-1/2")
-
W-J-7109
- Assembly rating: 2 Hour
- Max. 100" x 100" sheet metal duct (w/o damper) (AS=0" to 2")
-
W-J-7110
- Assembly rating: 2 Hour
- Max. W14 x 90 Steel I-beam service support (AS=1/2" to 3")
-
W-J-7112
- Assembly rating: 2 Hour
- Max. 100" x 100" sheet metal duct with nom. 1-1/2" or 2" thick glass fiber duct insulation (AS=1/2" to 3-1/2")
-
W-J-8004 (US Only)
- Assembly rating: 2 Hour
- Max. 2" steel or copper, EMT and cables (AS Varies)
-
W-J-8007
- Assembly rating: 4 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, cable tray or cables (single or bundled) (4 Hour) (CFS-BL Firestop Block)
-
W-J-8008
- Assembly rating: 4 Hour
- Multiple penetrants through concrete block wall assembly (min. 7-5/8" thick) (4 Hour) (CFS-BL Firestop Block)
-
W-J-8016
- Assembly rating: 2 Hour
- ABS Fiber Optic Cable tray, cables (single or bundled), 2" Innerduct (CFS-BL Firestop Block)
-
W-J-8017
- Assembly rating: 2 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, flexible metal conduit or cables (single or bundled) (CP 620 Fire Foam)
-
W-J-8018
- Assembly rating: 2 Hour
- Cable bundle Cable Rack (Telecom) (various cables) (CFS-BL Firestop Block)
-
W-J-8022
- Assembly rating: 2 Hour
- HVAC Line Set (1-1/4" FS-ONE MAX only) (AS=0" to 1-1/4")
-
W-J-8043 (US Only)
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic, non-metallic pipes, and cable bundle (AS Varies)
-
W-J-8045 (US Only)
- Assembly rating: 2 Hour
- Misc. bundle consisting of cables, metal pipe, ENT (AS=0" to 1")
-
W-J-8049
- Assembly rating: 4 Hour
- Multiple penetrants through concrete block wall assembly (minimum 7-5/8" thick) (CFS-BL Firestop Block)
-
W-J-8051
- Assembly rating: 2 Hour
- Multiple penetrations through concrete wall or block wall assembly (minimum 6" thick concrete wall) (CFS-BL Firestop Block)
-
W-L-0012
- Assembly rating: 2 Hour
- Max. 30" x 15" blank opening with CP 620 Firestop Foam
-
W-L-0013
- Assembly rating: 2 Hour
- Max. 4" blank threaded steel conduit with plastic or metal bushings
-
W-L-0018
- Assembly rating: 2 Hour
- Max. 4" blank steel pipe sleeve with Firestop Plugs
-
W-L-0030
- Assembly rating: 2 Hour
- Max. 240 sq. in. blank opening with a max. dimension of 20" (unframed opening)
-
W-L-0040
- Assembly rating: 2 Hour
- Max. 2-1/2" diameter or 2" x 2" blank opening
-
W-L-0043
- Assembly rating: 2 Hour
- Blank opening through gypsum wall assembly with Firestop Block and framing (Max area = 288 sq in with max dimension of 24")
-
W-L-1054
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" Steel EMT, or max. 2" aluminum pipe or EMT (FS-ONE MAX only) (AS=0" to 2-1/4") (Includes M Rating)
-
W-L-1095
- Assembly rating: 2 Hour
- Max. 1" steel, conduit or EMT pipes (one or more) (AS=1/2" to 1")
-
W-L-1110
- Assembly rating: 4 Hour
- Max. 12" steel, cast iron, max. 6" copper, conduit or max. 4" EMT in sleeve (4 Hour) (AS=7/8" to 1")
-
W-L-1148
- Assembly rating: 2 Hour
- Max. 8" steel or cast iron pipe or max. 4" conduit or EMT (AS=0" to 3/8")
-
W-L-1164
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT in steel pipe sleeve (AS=0" to 1-7/8")
-
W-L-1165
- Assembly rating: 4 Hour
- Max. 6" steel, copper, conduit or max. 4" EMT pipe in steel pipe sleeve (4 Hour) (AS=1/2" to 1-1/4")
-
W-L-1175
- Assembly rating: 2 Hour
- Max. 4" EMT or steel conduit (CP 618 Firestop Putty Stick) (AS=0" to 1")
-
W-L-1206
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, max. 6" conduit, max. 4" copper, EMT or max. 2" flexible steel conduit (sleeved) (one-sided installation, includes shaft wall) (AS=0" to 1-7/8")
-
W-L-1243
- Assembly rating: 2 Hour
- Max. 2" aluminum or steel flexible conduit or flexible steel gas piping (AS=0" to 1")
-
W-L-1248
- Assembly rating: 1 Hour
- Max. 6" steel, cast iron, steel conduit or max. 3" copper, or max. 4" EMT pipe (one or more) (CP 637 Firestop Mortar)
-
W-L-1249
- Assembly rating: 2 Hour
- Max. 2" Steel Conduit or EMT (Multiple in 30" x 12" opening) (CP 620 Fire Foam)
-
W-L-1252
- Assembly rating: 4 Hour
- Max. 4" steel, cast iron, copper, conduit, or EMT (Max. 4-Hour Fire-Rating) (AS=0" to 7/8")
-
W-L-1297
- Assembly rating: 2 Hour
- Max. 30" steel, cast iron, max. 6" copper, steel conduit or max. 4" EMT pipe (CP 606 only)
-
W-L-1304
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, conduit, or EMT (AS=0" to 1/2")
-
W-L-1359
- Assembly rating: 2 Hour
- Max. 6" cast iron with "No-Hub" Connector (AS=0" to 1")
-
W-L-1360
- Assembly rating: 2 Hour
- Max. 24" steel, cast iron, max. 6" copper, steel conduit, or max. 4" EMT (CFS-S SIL GG Firestop Silicone Sealant only)
-
W-L-1389
- Assembly rating: 2 Hour
- Multiple max. 2" steel, steel conduit, or EMT (Max Opening=32" x 3-1/2") (FS-ONE MAX only)
-
W-L-1392
- Assembly rating: 2 Hour
- Max. 12" steel, cast iron, max. 6" steel conduit or EMT (sleeved) (AS=0" to 3-7/8")
-
W-L-1402
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, steel conduit or EMT (one or more) (CFS-SP WB Firestop Joint Spray & Mineral Wool)
-
W-L-1406
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, steel conduit, max. 4" copper or EMT (UL Classified U336 or U366 Wall) (Party Wall) (AS=0" to 1-7/8")
-
W-L-1408
- Assembly rating: 2 Hour
- Multiple max. 4" steel, steel conduit, or EMT (FS-ONE MAX only)
-
W-L-1440
- Assembly rating: 2 Hour
- Max. 1" steel conduit or EMT with steel junction box (AS=0" to 1-1/8")
-
W-L-1464
- Assembly rating: 2 Hour
- Max. 1" single or bundled fledxible steel conduits (AS=0" to 3")
-
W-L-2084 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, CPVC, ABS or FRPP (closed or open) (sleeve optional) (Sheet Metal Cover Plate, CP 643N & FS-ONE MAX) (AS=1/4" to 1-1/4")
-
W-L-2098 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (closed system only) (AS=3/4" to 1-1/4")
-
W-L-2165 (US Only)
- Assembly rating: 2 Hour
- Max. 2" Fiber Optic Raceway (OFR) (Innerduct) or ENT (FS-ONE MAX only) (AS=1/4" to 7/8")
-
W-L-2184 (US Only)
- Assembly rating: 4 Hour
- Max. 2" PVC or CPVC (closed system only) (sleeved) (AS=1/2" to 1")
-
W-L-2197 (US Only)
- Assembly rating: 1 Hour
- Max. 1" Fiber Optic Raceway (Innerduct) (AS=1/4" to 3/8")
-
W-L-2217 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC (c,v) (shaft wall) (AS=0" to 1/4") (CP 643N Firestop Collar & FS-ONE MAX only)
-
W-L-2235 (US Only)
- Assembly rating: 2 Hour
- Max. 2" ABS, PVC, CPVC , FRPP or 1" PEX (closed or open) (AS=5/16")
-
W-L-2244 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (closed system only) (AS=0" to 5/8") (Includes M Rating)
-
W-L-2251 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC or CPVC (Retaining collar filled with FS-ONE MAX) (AS=0" to 1/2")
-
W-L-2284 (US Only)
- Assembly rating: 1 Hour
- Max. 3" PVC or CPVC (closed or open) (AS=3/16" to 1/4")
-
W-L-2315 (US Only)
- Assembly rating: 2 Hour
- Max. 12" FRP pipe (closed or open) (sheet metal sleeve & CP 648E wrap strip)
-
W-L-2330 (US Only)
- Assembly rating: 2 Hour
- Max. 6" Glass Pipe (AS=0" to 1-1/4")
-
W-L-2335 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, or ABS (closed or open) (AS=0" to 1/2")
-
W-L-2340 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, or ABS (closed or open) (angled through wall) (sheet metal sleeve & CP 648E wrap strip)
-
W-L-2344 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PVC, CPVC, or ABS (closed or open) (AS=3/8" to 1/2")
-
W-L-2406 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC or CPVC or Max. 4" ABS (c.v) (CP 648S wrap insert & FS-ONE MAX)
-
W-L-2443 (US Only)
- Assembly rating: 4 Hour
- Max. 2" ENT (closed system only) (3 or 4 Hour) (AS=1/4" to 3/4")
-
W-L-2445 (US Only)
- Assembly rating: 2 Hour
- Max. 6" cast iron soil stack with 6" PVC or CPVC or 4" ABS branch lines (closed or vented)
-
W-L-2447 (US Only)
- Assembly rating: 4 Hour
- Max. 6" PVC, CPVC, or ABS (closed or open) (FS-ONE MAX, CP 648E wrap strip & retaining collar) (Max. 4 Hour) (AS=0" to 1/2")
-
W-L-2467 (US Only)
- Assembly rating: 2 Hour
- Max. 4" diameter bundle of max. 1" diameter PEX (closed) (AS=0" to 1")
-
W-L-2473 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PP (closed or open) (AS=0" to 1/2")
-
W-L-2510 (US Only)
- Assembly rating: 2 Hour
- Max. 8" Polypropylene or Max. 4" PEX (AS=0" to 1/2")
-
W-L-2538
- Assembly rating: 2 Hour
- One or more Max. 2" ENT (one or more) through CP 653 or CFS-SL GA L Speed Sleeve
-
W-L-2541 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PVC or CPVC (c,v) through CP 653 Speed Sleeve
-
W-L-2559 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" Single or bundled Dura-line Mircroduct (AS=0" to 1")
-
W-L-2567
- Assembly rating: 2 Hour
- Cable bundle (various cables) in flexible nylon fiber optic cable routing system (sleeved) (AS=0" to 1" outside sleeve) (AS=0" to 3" inside sleeve)
-
W-L-3046
- Assembly rating: 1 Hour
- Cable bundle (power cables) Steel sleeve (33% fill)
-
W-L-3047
- Assembly rating: 2 Hour
- Cable bundle (power cables) (33% fill)
-
W-L-3058
- Assembly rating: 2 Hour
- Single telephone cable (Max. diameter of opening=1/2")
-
W-L-3071
- Assembly rating: 2 Hour
- SER power cables (max. qty=2) (AS=1/2" to 1-1/2")
-
W-L-3079
- Assembly rating: 2 Hour
- Cable bundle (various cables) sleeve optional (Max. 28% fill, AS=0" to 2") (CFS-BL Firestop Block 2" deep)
-
W-L-3111
- Assembly rating: 2 Hour
- Cable bundle (various cables) sleeve optional (Max. 25% fill, AS=1/8" to 3/4")
-
W-L-3112
- Assembly rating: 2 Hour
- Cable bundle (various cables) extended sleeved (Max. 36% fill, AS=0" to 1")
-
F-A-5070
- Assembly rating: 3 Hour
- Max. 2" steel or copper pipe/tubing with nominal 1" or 1-1/2" glass-fiber insulation (Min. 2-1/2" concrete) through CFS-CID MD [M or P] Cast-In Device for Metal Deck
-
W-L-3161
- Assembly rating: 2 Hour
- Cable bundle (various cables) sleeved (shaft wall) (one sided) (Max. 33% fill, AS=1/4" to 3/4")
-
W-L-3185
- Assembly rating: 2 Hour
- Cable bundle Cable Rack (Telecom) (various Cables) (Max. 35% fill, AS=0" to 8")
-
W-L-3213
- Assembly rating: 2 Hour
- Cable bundle (various cables) PVC sleeve (Max. 45% fill)
-
W-L-3220
- Assembly rating: 1 Hour
- Cable bundle (various cables) Max. 50% fill (Unique Firestop Sleeve) (membrane penetration)
-
W-L-3224
- Assembly rating: 2 Hour
- Cable bundle (various cables) Max. 60% fill (sleeve optional) (CFS-PL Firestop Plug)
-
W-L-3272
- Assembly rating: 2 Hour
- Cable bundle (various cables) extended sleeved (Max. 50% fill, AS=0" to 1") (CFS-PL Firestop Plug)
-
W-L-3273
- Assembly rating: 4 Hour
- Cable bundle (various cables) (Cable fill=8% to 48%l, AS=1/4" to 1-1/4") (Unique Firestop Sleeve) (3 or 4 Hour)
-
W-L-3277
- Assembly rating: 4 Hour
- Cable bundle (various cables) sleeved (3 or 4 Hour) (Max. 33% fill, AS=0" to 1-5/8") (CFS-PL Firestop Plugs)
-
W-L-3278
- Assembly rating: 2 Hour
- Cable bundle (various cables) (shaft wall) (AS=0" to 1") (one sided)
-
W-L-3282
- Assembly rating: 2 Hour
- Cable bundle (various cables) (Unique Firestop Sleeve with CFS-PL Firestop Plug) (Max. 50% fill, AS=0" to 3")
-
W-L-3307
- Assembly rating: 2 Hour
- Cable bundle (various cables) (UL Classified U336 or U366 Wall) (Party Wall) (Max. 45% fill, AS=0" to 1")
-
W-L-3310
- Assembly rating: 2 Hour
- MC Cables (Max Qty = 3) (membrane penetration) (AS varies)
-
W-L-3320
- Assembly rating: 2 Hour
- Max. 3" EMT, steel conduit, or steel pipe sleeve open ended with various cables inside sleeve (membrane penetration) (AS varies)
-
W-L-3334
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (Max. 4 Hour) (Max. 100% fill) (Includes M Rating)
-
W-L-3335
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (Max. 100% fill)
-
W-L-3384
- Assembly rating: 2 Hour
- Cable Bundle (various cables) through "ganged" CP 653 or CFS-SL GA L (Max. 100% fill) Speed Sleeves in one or two rows
-
W-L-3385
- Assembly rating: 3 Hour
- Cable bundle (various cables) (Max. 45% fill) (AS=0" to 7/8") (Max. 3 Hour)
-
W-L-3391
- Assembly rating: 2 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
W-L-3392
- Assembly rating: 2 Hour
- Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
W-L-3393
- Assembly rating: 2 Hour
- Blank or cables through CFS-SL RK Firestop Retrofit Sleeve Kit (Max. 60% fill)
-
W-L-3394
- Assembly rating: 2 Hour
- Blank or cables through CFS-SL SK Firestop Sleeve Kit (Max. 60% fill)
-
W-L-3395
- Assembly rating: 2 Hour
- Blank or cables through Cable Management Devices using CFS-SL GP Firestop Gangplate & CP 653 Speed Sleeves, CFS-SL RK Retrofit Kit or CFS-SL SK Sleeve Kit
-
W-L-3396
- Assembly rating: 2 Hour
- Cable Bundle (various cables) (optional steel or PVC sleeve) (CFS-CC 4" Firestop Cable Collar)
-
W-L-5025
- Assembly rating: 2 Hour
- Max. 10" steel pipe with max. 2" glass fiber insulation (Steel sleeve optional) (AS=1-1/8")
-
W-L-5027
- Assembly rating: 2 Hour
- Max 2" steel, copper, conduit or EMT pipe with max. 3/4" AB/PVC insulation within a steel sleeve (AS=1-3/16" to 1-5/8")
-
W-L-5028
- Assembly rating: 2 Hour
- Max. 4" steel, max. 2" copper, conduit or EMT pipe with max. 3/4" AB/PVC insulation (FS-ONE MAX only) (AS=0" to 1-1/2")
-
W-L-5125
- Assembly rating: 2 Hour
- Max. 10" steel, cast iron or max. 4" copper pipe with max. 3" glass fiber insulation (AS=1/2" to 3/4")
-
W-L-5126
- Assembly rating: 2 Hour
- Max. 10" steel pipe with max. 3" glass fiber insulation (AS=1/2" to 3/4")
-
W-L-5143
- Assembly rating: 2 Hour
- Max. 1" copper with max. 3/4" thick AB/PVC (Shaft Wall) (sleeved) (one sided) (AS=1/4" to 1-1/8")
-
W-L-5144
- Assembly rating: 1 Hour
- Max. 1" copper with max. 2" thick glass fiber (Shaft Wall) (sleeved) (one sided) (AS=1/4" to 1-1/8")
-
W-L-5223
- Assembly rating: 2 Hour
- Max. 12" steel or 6" copper with 1-1/2" to 3" thick FoamGlass pipe insulation with optional metal jacket (AS=0" to 3/4")
-
W-L-5240
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, 4" copper with 1" or 1-1/2" thick glass fiber pipe insulation (shaft wall) (AS=1/4" to 1-1/8")
-
W-L-5244
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron, or copper w/ max. 2" glass fiber pipe insulation (shaft wall) (one sided) (AS=3/16" to 13/16")
-
W-L-5260
- Assembly rating: 2 Hour
- Max. 2" steel, cast iron or copper with 3/4" glass fiber (UL Classified U336 or U366 Wall) (Party Wall) (AS=0" to 7/8")
-
W-L-5261
- Assembly rating: 2 Hour
- Max. 12" steel, cast iron or 6" copper with 2" cellular glass or foam glass insulation (shaft wall) (one sided) (AS=1/4" to 1-1/4")
-
W-L-5292
- Assembly rating: 2 Hour
- Max. 12" steel or cast iron pipe with max. 4" calcium silicate pipe insulation (AS=0" to 1-1/4")
-
W-L-6017
- Assembly rating: 2 Hour
- Max. 12" x 4" Fiber Optic Cable Tray (ABS) (AS=0" to 4") (CFS-BL Firestop Block)
-
W-L-6019
- Assembly rating: 2 Hour
- Max. 11-1/4" x 4-1/4" Electrical Busway (AS=1/4" to 1-1/4") (FS-ONE MAX only)
-
W-L-7018
- Assembly rating: 2 Hour
- Max. 6" diameter sheet metal duct with max. 1" thick glass fiber insulation (w/o damper) (AS=0" to 1")
-
W-L-7040
- Assembly rating: 2 Hour
- Max. 48" x 24" sheet metal duct w/o damper (AS=0" to 2")
-
W-L-7059
- Assembly rating: 2 Hour
- Max. 24" x 12" sheet metal duct w/o damper with max. 1-1/2" thick glass fiber duct insulation with foil scrim kraft facing (AS=1/4" to 1")
-
W-L-7068
- Assembly rating: 2 Hour
- Max. 6" sheet metal duct w/o damper (Shaft Wall) (sleeved) (one sided) (AS=1/4" to 3/4")
-
W-L-7069
- Assembly rating: 2 Hour
- Max. 7" x 7" sheet metal duct w/o damper (Shaft Wall) (sleeved) (one sided) (AS=1/4" to 3/4")
-
W-L-7096
- Assembly rating: 1 Hour
- Max. 14" x 12" sheet metal duct w/o damper (no angles) (AS=1/4" to 3/4")
-
W-L-7121
- Assembly rating: 2 Hour
- Max. 30" x 24" steel air or grease duct with one layer1-1/2" thick Firemaster® Fast Wrap Mfd. by Thermal Ceramics (AS=0" to 2")
-
W-L-7124
- Assembly rating: 2 Hour
- Max. 32" Metal Fab Grease Duct (AS varies)
-
W-L-7130
- Assembly rating: 2 Hour
- Mechanical support mechanisms (strut, steel cable, steel rod, steel angle) (AS=1/8" to 7/8")
-
W-L-7153
- Assembly rating: 2 Hour
- Max. 20" spiral wound duct or 12" sheet metal duct (w/o damper) with Max. 2" glass fiber duct insulation (AS=1/4" to 1-1/2")
-
W-L-7154
- Assembly rating: 2 Hour
- Mechanical Support Member (steel strut, steel angle, steel channel) (shaft wall) (membrane penetration) (AS=0" to 7/8")
-
W-L-7155
- Assembly rating: 2 Hour
- Max. 100" x 100" sheet metal duct (w/o damper) (Includes DuraDuct HP/SD/GNX) (AS=0" to 2")
-
W-L-7158
- Assembly rating: 2 Hour
- Max. 24" x 12" steel air or grease duct with 1-1/2" duct wrap Mfd. by Unifrax or Thermal Ceramics (AS=0" to 2")
-
W-L-7159
- Assembly rating: 1 Hour
- Max. 10" x 10" sheet metal duct (w/o damper) (AS=1/4" to 1") (no angles) (FS-ONE MAX or CP 606)
-
W-L-7198
- Assembly rating: 2 Hour
- Max. 4" sheet metal duct (30 Ga) (membrane penetration) (AS=0" to 1-1/2")
-
W-L-8004 (US Only)
- Assembly rating: 2 Hour
- Max. 3" EMT, Max. 2" PVC (closed) and cables
-
W-L-8013
- Assembly rating: 2 Hour
- Insulated or non-insulated steel, copper, conduit or EMT, PVC pipe, cable tray or cables (single or bundled) (CFS-BL Firestop Block)
-
W-L-8015
- Assembly rating: 4 Hour
- Max. 12" steel, max. 6" copper, steel conduit or max. 4" EMT (Max. qty=2) with optional max. 1-1/2" glass fiber (Max. 4 Hour) (CFS-BL Firestop Block)
-
W-L-8023
- Assembly rating: 2 Hour
- Max. 6" steel tube (16 Ga) and (max qty=3) communication cables (FS-ONE MAX only)
-
W-L-8035
- Assembly rating: 2 Hour
- Fiber Optic cable tray (ABS), Cable Bundle, Max. 2" Fiber Optic Raceway (PVC) (AS varies) (CFS-BL Firestop Blocks)
-
W-L-8047
- Assembly rating: 2 Hour
- HVAC Line Set (bundled) (AS=0" to 1-1/4") (FS-ONE MAX only)
-
W-L-8058
- Assembly rating: 2 Hour
- Insulated or non-insulated steel, copper, conduit or EMT, cable bundle (CP 675T Z-frame and CFS-BL Firestop Block)
-
W-L-8065
- Assembly rating: 2 Hour
- Max. 3" steel, cast iron, copper, steel conduit or EMT (optional 1" to 2" glass-fiber or mineral fiber, or 1/2" to 3/4" AB/PVC insulation on metallic penetrants), Max. 2" PVC, CPVC, RNC or Max. 1" PEX, and Max 3" cable bundle (AS varies)
-
W-L-8071
- Assembly rating: 2 Hour
- Multiple 2" steel, steel conduit, flexible steel gas line, or EMT, max. 2" ENT, and cables (FS-ONE MAX only)
-
W-L-8079
- Assembly rating: 2 Hour
- Insulated or non-insulated metallic, non metallic pipes, and cable bundle (AS varies) (unframed opening)
-
W-L-8081
- Assembly rating: 2 Hour
- Multiple HVAC Line Sets (max qty 3) bundled together (AS=0" to 1-1/2")
-
W-L-8082
- Assembly rating: 2 Hour
- Misc. bundle consisting of cables, metal pipe, ENT (AS=0" to 1")
-
W-L-8093
- Assembly rating: 4 Hour
- Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, cable tray or cables (single or bundled) (Max. 4 Hour) (CFS-BL Firestop Block)
-
W-L-8094
- Assembly rating: 2 Hour
- Fiber Optic cable tray (ABS), Cable Bundle, Max. 2" Fiber Optic Raceway (PVC) (AS varies) (CFS-BL Firestop Blocks)
-
W-L-8098
- Assembly rating: 2 Hour
- Metal pipes, insulated pipes, cable bundles through Gypsum Shaft Wall (AS=Min. 1/2") (CFS-BL Firestop Block)
-
FF-D-0096
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint (Max JW = 2”)
-
FF-D-0097
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max JW = 1”)
-
FW-D-1092
- Joint type: Floor-to-Wall
- Assembly rating: 4 Hour
- Concrete floor to wall joint (Max JW = 3”)
-
FW-D-1093
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete floor to wall joint (Max JW = 3”)
-
FF-D-1126
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint (Max JW = 3”)
-
FW-D-0066
- Joint type: Floor-to-Wall
- Assembly rating: 2 Hour
- Concrete stair case to concrete wall (Max JW = 2”)
-
HW-D-0633
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (perpendicular or parallel) (Max. JW=1")
-
HW-D-1104
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Block wall to underside of flat concrete or hollow core (Max JW = 3”)
-
WW-D-0140
- Joint type: Wall-to-Wall
- Assembly rating: 3 Hour
- Concrete wall to wall joint (Max JW = 2”)
-
WW-D-0141
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max JW = 1”)
-
WW-D-1128
- Joint type: Wall-to-Wall
- Assembly rating: 4 Hour
- Concrete wall to wall joint (Max JW = 3”)
-
HW-D-0703
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max JW = 1”)
-
WW-D-1129
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max JW = 3”)
-
HW-D-0704
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete or block wall to concrete floor joint (top-of-wall) (Max JW = 1”)
-
C-AJ-2676 (US Only)
- Assembly rating: 3 Hour
- Max 2” CPVC (closed or vented) (includes hollow core) (AS = ½” to 1-1/8”)
-
C-AJ-0141
- Assembly rating: 2 Hour
- Max. 24” blank opening
-
C-AJ-0142
- Assembly rating: 2 Hour
- Max. 6” blank opening
-
C-AJ-1630
- Assembly rating: 4 Hour
- Max. 30” steel, cast iron, max. 6” steel conduit, max. 4” copper or EMT (optional sleeve) (AS = 0” to 2-1/8” for 3 Hr) (AS = 0” to 1-7/8” for 4 Hr)
-
C-AJ-2674 (US Only)
- Assembly rating: 2 Hour
- Max. 4” PEX mfg by Uponor with ½” glass fiber Insulation removed through firestop (AS=0” to 7/8”)
-
C-AJ-7150
- Assembly rating: 2 Hour
- Carbon steel air duct with 1-1/2” thick FireMaster FireWrap XL, FireMaster FastWrap+, or Pyrostate Duct Wrap XL
-
C-AJ-7152
- Assembly rating: 2 Hour
- Carbon steel air duct with 1-1/2” thick FireMaster FireWrap XL, FireMaster FastWrap+, or Pyrostate Duct Wrap XL
-
C-AJ-7153
- Assembly rating: 2 Hour
- Max. 49” x 24” steel sheet metal air duct with 1-1/2” thick FireMaster FireWrap XL, FireMaster FastWrap+, or Pyrostate Duct Wrap XL
-
C-AJ-7154
- Assembly rating: 2 Hour
- Mechanical Support Member (Steel strut, steel angle, steel channel) (shaft wall) (membrane penetration) (AS=0” to 7/8”)
-
C-AJ-8218
- Assembly rating: 3 Hour
- Insulated or non-insulated steel, cast iron, copper (AS varies)
-
F-C-7056 (US Only)
- Assembly rating: 1 Hour
- Max. 47" diam or 10" x 4" (AS = 1-1/2")
-
F-C-7058
- Assembly rating: 1 Hour
- Max. 7" diam
-
F-A-2310
- Assembly rating: 3 Hour
- Max. 4" PVC, CPVC, RNC, PEX, ABS, FRPP, PVDF or PP through CFS-CID MD P Cast-In Device for Metal Deck (Min 2-1/2" concrete)
-
W-J-7123
- Assembly rating: 2 Hour
- Mechanical Support member Steel strut, steel cable, steel rod, steel angle (AS=1/8” to 7/8”)
-
W-J-7124
- Assembly rating: 2 Hour
- Max. 20” spiral would duct or 12” sheet metal duct (w/o damper) with 1-1/2” thick glass fiber duct insulation (AS=1/4” to 1”)
-
W-L-7214
- Assembly rating: 2 Hour
- Max. 20” spiral wound duct w/o damper, or 12” sheet metal duct (AS=0” to 1-1/2”)
-
W-L-2045 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PP, Orion Polystar, or Aquatherm Greenpipe (CP 643N Firestop Collar & FS-ONE MAX) (AS=0" to 5/8")
-
W-L-2044 (US Only)
- Assembly rating: 2 Hour
- Max. 2" (PP) Polypropylene pipe (c,v) (CP 648S wrap insert & FS-ONE MAX) (AS=3/16" to 5/16")
-
W-J-2255 (US Only)
- Assembly rating: 2 Hour
- Max. 8" HDPE pipe (sch 40) (AS=Min. 1-1/4")
-
W-J-1245 (US Only)
- Assembly rating: 2 Hour
- Max. 4" Aluminum tube (AS= Min. 3") (CFS-BL Firestop Block)
-
F-A-2316
- Assembly rating: 2 Hour
- Max. 4" bundle PEX tubing (max. 1/2" diameter) through CFS-CID MD P Cast-In Device for Metal Deck w/ Mineral Wool (Min 4-1/2" concrete)
-
F-B-2056 (US Only)
- Assembly rating: 2 Hour
- Max. 2 in. PVC into shower/floor drain (Hollow Core) through CFS-DID C or HC Drop-In Device
-
W-L-2593 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PEX (Uponor AquaPEX or Wirsbo hePEX) (closed only) (CP 643N Firestop Collar or CP 648E Wrap Strip & Retaining Collar) (AS=0" to 3/8")
-
W-L-2583 (US Only)
- Assembly rating: 2 Hour
- Max.2" PVDF (closed or open) or Max.1" PP plastic pipe (closed only)
-
HI/PF 120-04
- Assembly rating: 2 Hour
- Max. 1" copper, steel, cast iron, steel conduit, or EMT (AS=0" to 2-7/8") (2 Hour T-Rating)
-
HI/PF 120-02
- Assembly rating: 2 Hour
- Max. 2" copper (AS= 0" to 1-7/8") (2 Hour T-Rating)
-
C-AJ-5098
- Assembly rating: 2 Hour
- Max. 6" steel or Max. 4" copper pipe with max. 3" thick glass fiber insulation (Steel sleeve optional) (AS=1/2")
-
HI/BPF 120-09
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing (Max. JW = 6") (Static Joint)
-
F-A-3060
- Assembly rating: 2 Hour
- Cable bundle (various cables), Min. 2-1/2" concrete floor, CP 653 speed sleeve through CP 680-M, P, or PX Cast-In Device or CFS-CID MD M, P, or PX installed per listing instructions. (2 Hour T-Rating w/ Duct Wrap)
-
C-AJ-2712 (US Only)
- Assembly rating: 2 Hour
- Nom. 2" Fusiotherm or Polystar PP Pipe (mfd. by Aquatherm or Orion), Min. 2-1/2" Floor, Min. 2-3/4" Wall (CP 648E wrap insert & FS-ONE MAX)
-
F-C-2429 (US Only)
- Assembly rating: 1 Hour
- Max. 1-1/2" PP pipe (c) (Fusiotherm by Aquatherm & Polystar by Orion) (AS=0" to 15/16") (FS-ONE MAX only)
-
W-L-2603 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/4" PP or Max 2" PP-R/PP-RCT (closed) (FS-ONE MAX only) (AS=0" to 1")
-
W-L-2604 (US Only)
- Assembly rating: 2 Hour
- Max. 1-1/2" PP pipe (c) (CP 648E wrap insert & sealant) (AS=5/8")
-
W-K-3002
- Assembly rating: 4 Hour
- Cable Bundle (Max. 100% visual fill) (Min 10" Concrete Wall) with Back-to-back CP 653 or CFS-SL GA L Speed Sleeves
-
HI/JF 120-02
- Joint type: Wall-to-Column
- Assembly rating: 2 Hour
- Gypsum Wall-to-Fireproofed-Column Vertical Joint (Max. JW = 2-1/2")
-
F-C-3110
- Assembly rating: 1 Hour
- Cable bundle; VF = 0 - 100%; AS = Min. 0" (CFS-D 1" Firestop Putty Disc)
-
W-J-1248
- Assembly rating: 2 Hour
- Max. 1" steel, cast iron, rigid or flexible steel or aluminum conduit or EMT; Max. 1/2" copper tubing or copper pipe; (CFS-D 1" Firestop Cable Disc)
-
W-J-2267 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" microduct or Max. 3/4" PEX (c); AS = Min. 0" to 1/2" (CFS-D 1" Firestop Putty Disc)
-
W-L-1506
- Assembly rating: 2 Hour
- Max. 1" steel, cast iron, rigid or flexible steel or aluminum conduit or EMT; Max. 1/2" copper tubing or copper pipe; (CFS-D 1" Firestop Cable Disc)
-
W-L-3414
- Assembly rating: 2 Hour
- Cable bundle; Visual Fill = 0 to 100%; AS = Min. 0" (CFS-D 1" Firestop Cable Disc)
-
W-L-3415
- Assembly rating: 2 Hour
- Cable bundle; Visual Fill = 0 to 100%; AS = Min. 0" (membrane penetration) (CFS-D 1" Firestop putty Disc)
-
HI/BPF 120-10
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) (Max. JW = 4")
-
HW-D-0758
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall (double stud) to concrete floor (top-of-wall) with CFS-TTS Top Track Seal (Max. JW=3/4")
-
F-B-1033
- Assembly rating: 2 Hour
- Nom. 3" or 4" steel or iron pipe, toilet flange / water closet (Min. 6" concrete) (CP 680-M, P or PX Cast-In Device) (2 Hour T-rating with Mineral Fiber Insulation)
-
F-B-1032
- Assembly rating: 3 Hour
- Nom. 1-1/2" or 2" steel or iron tub drain pipe, CP 681 tub box (Min. 6" concrete) (CP 680-P or PX Cast-In Device)
-
W-L-3234
- Assembly rating: 4 Hour
- Cable bundle (various cables) through gypsum board wall (Max. 34% fill) in unique threaded sleeve or threaded split sleeve (3 or 4 Hour)
-
W-L-3232
- Assembly rating: 2 Hour
- Cable bundle (various cables) through gypsum board wall (Max. 48% fill) in unique threaded split sleeve
-
C-AJ-1664
- Assembly rating: 2 Hour
- Single metallic pipe, conduit or tube through concrete or hollow-core floor or concrete/block wall.
-
C-AJ-0157
- Assembly rating: 3 Hour
- Max 32" x 32" Blank opening with CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) (min. 4-1/2" concrete)
-
C-AJ-8252
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) and cable bundle or metallic penetrant through concrete floor or block wall (min.4-1/2")
-
W-J-8056
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) with steel backer for multiple or mixed penetrants in concrete or block wall (min. 4-1/2")
-
C-AJ-3345
- Assembly rating: 2 Hour
- Multiple Cable Bundles through CFS-COS Firestop Composite Sheet with CP 653 Speed Sleeve & CFS-SL GP 24" Gangplate
-
W-J-7152
- Assembly rating: 2 Hour
- Max. 30" X 30" sheet metal duct (w/o damper) (AS=1/4" to 1-1/8") (Steel Angles max. 4" from wall)
-
F-B-1034 (US Only)
- Assembly rating: 2 Hour
- Max. 10" steel or cast iron pipe, Max. 6" steel conduit, or Max. 4" copper pipe/tubing (6" concrete) through CFS-CID M or P [8" or 10"] Cast-In Device
-
F-B-2061
- Assembly rating: 2 Hour
- Nominal 8" or 10" PVC or CPVC pipe (c,v) (6" concrete) through CFS-CID P [8" or 10"] Cast-In Device
-
F-B-5009
- Assembly rating: 2 Hour
- Max. 8" steel, cast iron, or 6" copper pipe with nom. 1" or 2" thickness glass-fiber insulation (6" concrete) through CFS-CID P [8" or 10"] Cast-In Device
-
HI/BPF 120-11
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) (Max. JW = 4")
-
W-J-2331
- Assembly rating: 2 Hour
- Max. 2" electric nonmetallic tubing (ENT) (AS=0" to 1/2")
-
W-J-2332
- Assembly rating: 2 Hour
- Max. 2" electrical non-metallic tubing (ENT) (AS=3/16" to 3/4")
-
W-J-5190 (US Only)
- Assembly rating: 2 Hour
- Max. 1/2" PEX tubing with 3/4" thick AB/PVC pipe insulation (AS=1/4" to 7/8")
-
W-L-5344 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PEX tubing (Uponor Aquapex or Hepex) with 1-1/2" thick glass-fiber pipe insulation (AS=0" to 1/8")
-
W-J-5192 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PEX tubing with 1-1/2" thick glass-fiber pipe insulation (AS=0" to 1/8")
-
W-J-5191
- Assembly rating: 2 Hour
- Max. 6" steel or cast iron pipe with 3" glass-fiber insulation (1-1/4" FS-ONE MAX only) (AS=1/4" to 1-3/4")
-
W-L-8110
- Assembly rating: 2 Hour
- HVAC line set through CFS-SL SK Firestop Sleeve Kit with CFS-PL Firestop Plugs
-
W-L-2677
- Assembly rating: 2 Hour
- Max. 2" electrical nonmetallic tubing (ENT) (AS=3/16" to 3/4")
-
W-L-5342 (US Only)
- Assembly rating: 2 Hour
- Max.1/2" PEX (c) with 3/4" AB/PVC (AS=1/4" to 7/8")
-
W-L-5343
- Assembly rating: 2 Hour
- Max. 6" steel or cast iron with 3" glass fiber insulation (1-1/4" FS-ONE MAX only) (AS=1/4" to 1-3/4")
-
F-A-5055 (US Only)
- Assembly rating: 2 Hour
- Insulated Aquatherm Greenpipe PP-R through CFS-DID 6" MD (3" PP-R with 1" Glass Fiber or 2" PP-R with 2" Glass Fiber)
-
C-AJ-5385 (US Only)
- Assembly rating: 2 Hour
- Max. 3" PP-R (mfd. by Cosmoplast or Coprax) with 1" polyolefin or AB/PVC (AS=0" to 1") (CP 648E wrap, retaining collar & FS-ONE MAX)
-
F-A-2284 (US Only)
- Assembly rating: 2 Hour
- Max. 4" Uponor Aquapex or Wirsbo Hepex through CFS-DID Drop-In Device
-
F-A-5062
- Assembly rating: 2 Hour
- Max. 2" steel or copper pipe with nom. 1-1/2" thickness cellular glass (foamglass) insulation (4-1/2" concrete) (CP 680-P Cast-In Device)
-
F-B-1035
- Assembly rating: 2 Hour
- Max. 4" steel, cast iron, copper, steel conduit, or EMT (through Concrete Floor or Hollow-Core Floor) inside Optional Gypsum Chase Wall
-
F-B-2064 (US Only)
- Assembly rating: 2 Hour
- Max. 4" PEX (Uponor AquaPEX or Wirsbo hePEX) (closed) (Hollow-Core Floor) through CFS-DID Firestop Drop-In Device C or HC
-
F-B-8010
- Assembly rating: 2 Hour
- Single HVAC Line Set through CFS-DID Firestop Drop-In Device 3" C or HC (Hollow-Core)
-
W-J-5193
- Assembly rating: 2 Hour
- Max. 7/8" Streamline ACR-Type L Copper Tubing with Nom. 1/2" Polyethylene Insulation (AS=1/4" to 1-1/2")
-
W-J-5194
- Assembly rating: 2 Hour
- One or more Max. 7/8" Streamline ACR-Type L Copper Tubing with Nom. 1/2" Polyethylene Insulation (Max Qty. = 4) (Sealant, wrap strip & retaining collar)
-
W-L-2649 (US Only)
- Assembly rating: 2 Hour
- Max. 6" polypropylene (PP-R, PP-RCT) or max 6" HDPE (AS varies) (Sheet Metal Sleeve, CP 648E wrap insert & FS-ONE MAX)
-
W-L-5346
- Assembly rating: 2 Hour
- One or more Max. 7/8" Streamline ACR-Type L Copper Tubing with Nom. 1/2" (Duraguard) Polyethylene Insulation (Max Qty. = 4) (Sealant, wrap strip & retaining collar) (AS=0" to 1-3/4")
-
W-L-7271
- Assembly rating: 2 Hour
- Shower Valve Assembly with Min. 7" escutcheon plate and Max. 1/2" Copper or Iron Supply Pipes (Max. AS=1-7/8", Max. 5" diameter opening) (CP 648E Wrap Strip & CFS-S SIL GG Firestop Silicone Sealant)
-
W-L-7272
- Assembly rating: 2 Hour
- Shower Valve Assembly with Min. 7" escutcheon plate and Max. 1/2" Copper or Iron Supply Pipes (Max. AS=1-7/8", Max. 5" diameter opening) (Min. 5/8" CFS-S SIL GG Firestop Silicone Sealant Only)
-
F-A-2285
- Assembly rating: 3 Hour
- Max. 2" PVC, ABS, CPVC or FRPP through Concrete Floor or Concrete Hollow-Core Floor (CFS-DID MD Drop-In Device) (Includes gypsum chase wall with lumber studs)
-
F-A-1170
- Assembly rating: 3 Hour
- Max. 2" Steel, Cast Iron, Copper, Steel Conduit or EMT through Concrete Floor or Concrete Hollow-Core Floor (CFS-DID MD Drop-In Device) (Includes gypsum chase wall with lumber studs)
-
C-AJ-7195
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) and Max. 24" x 18" steel duct with steel angles fastened to duct and Composite Sheet (AS= Min. 2")
-
W-J-2336 (US Only)
- Assembly rating: 2 Hour
- Max. 6" Polypropylene (PP) Aquatherm Greenpipe (closed) (Steel Sleeve, CP 648E wrap insert & FS-ONE Max) (AS varies)
-
W-J-2337 (US Only)
- Assembly rating: 2 Hour
- Max. 10" PVC, CPVC, max. 6" ABS, FRPP or max. 4" PVDF, PEX (Uponor AquaPEX or Wirsbo hePEX) (CP 643N or CP 644 Firestop Collar & FS-ONE MAX) (AS=0" to 1/2")
-
W-J-5195 (US Only)
- Assembly rating: 2 Hour
- Max. 8" Polypropylene (PP) Aquatherm Bluepipe with Nom. 2" Cellular Glass Insulation or Nom. 1" Glass-Fiber Insulation (Steel sleeve with CP 648E wrap strip)
-
W-L-3441
- Assembly rating: 2 Hour
- Cable bundle through Max. 1" steel or aluminum conduit sleeve extended Max. 12"; VF = 0 - 100%; (CFS-D 1" Firestop Putty Disc)
-
W-L-5347 (US Only)
- Assembly rating: 2 Hour
- Max. 8" Polypropylene (PP) Aquatherm Bluepipe with Nom. 2" Cellular Glass Insulation or Nom. 1" Glass-Fiber Insulation (Steel sleeve with CP 648E wrap strip)
-
W-L-5335 (US Only)
- Assembly rating: 2 Hour
- Max. 3" Cosmoplast Polypropylene (PP-R) with Nom. 1" AB/PVC or Polyolefin Insulation (Optional Steel Sleeve) (CP 648E wrap strip, retaining collar & FS-ONE Max) (AS=0" to 1")
-
W-L-3447
- Assembly rating: 2 Hour
- Cable Bundle through CFS-MS 1" Sleeve Kit with CFS-D 1" Firestop Putty Disc (VF = 0 to 100%, AS = 0 to 1/8")
-
W-J-3260
- Assembly rating: 2 Hour
- Cable bundle through Max. 1" Steel or aluminum Conduit Sleeve extended Max. 12"; VF = 0 - 100%; (CFS-D 1" Firestop Cable Disc)
-
TP-506
- Assembly rating: 0 Hour
- Through penetration details for non fire-rated smoke partitions wtih CP 506 Smoke & Acoustic Sealant
-
C-BJ-3040
- Assembly rating: 2 Hour
- Blank or Cables (various) through CFS-T Firestop Cable Transit (Max. 100% fill)
-
C-BJ-8038
- Assembly rating: 2 Hour
- Cables (various) and/or one or more Max. 1" Steel Conduit or EMT through CFS-T Firestop Cable Transit (Max. 100% fill)
-
W-L-1551
- Assembly rating: 1 Hour
- Max. 2" steel, cast iron, copper, conduit or EMT pipe through one-sided UL V497 Gypsum Wall (FS-ONE MAX only) (AS=1/4" to 5/8")
-
W-L-2694
- Assembly rating: 1 Hour
- Max. 4" PVC, CPVC or RNC through one-sided UL V497 Gypsum Wall (AS=3/8" to 5/8")
-
HI/BPF 120-14
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) (Max. JW = 4")
-
HI/BPF 120-15
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Zero Spandrel (All Vision Glass) (Max. JW = 4")
-
C-AJ-7199
- Assembly rating: 2 Hour
- Max. 36" Grease Duct or ventilation duct mfg by Jeremias Inc. (AS=1/2" to 1-1/2")
-
C-AJ-7207 (US Only)
- Assembly rating: 2 Hour
- Max. 36" Grease Duct, mfg by North American Kitchen Solutions, Inc. (AS=1/2" to 1-1/2")
-
W-J-2019 (US Only)
- Assembly rating: 2 Hour
- Max. 2" PVC or CPVC (closed) (AS=3/4" to 1-1/4") (FS-ONE MAX only)
-
F-A-8055
- Assembly rating: 3 Hour
- Multiple HVAC Line Sets through CFS-CID MD [M or P] Cast-In Device for Metal Deck
-
F-A-5069
- Assembly rating: 3 Hour
- Max. 2" steel or copper pipe/tubing with nominal 3/4" or 1" AB/PVC insulation (Min. 2-1/2" concrete) through CFS-CID MD [M or P] Cast-In Device for Metal Deck
-
F-A-0041
- Assembly rating: 3 Hour
- Blank CFS-CID MD [M or P] Cast-In Device for Metal Deck with Min. 1" mineral wool & device cap threaded on top (Min 4-1/2" Concrete)
-
HI/BPF 120-18
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel with Aluminum Framing (vision glass at floor) with CFS-EOS QS Edge of Slab Quick Seal (Max. JW=5")
-
C-AJ-7214
- Assembly rating: 2 Hour
- Max. 36" Grease Duct, mfg by Halton Co. (AS=1/2" to 1-1/2")
-
F-C-8060
- Assembly rating: 1 Hour
- Mixed/Multiple insulated or non-insulated metallic pipes, non-metallic pipes, cable bundles or ducts (Max 32" x 14-1/2" opening) (CFS-BL Firestop Block)
-
HW-D-0871
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ optional use of spray-on fireproofing (perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0872
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ optional use of spray-on fireproofing (parallel) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-1/2")
-
HW-D-0873
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (top-of-wall) (offset flutes) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0880
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to flat concrete floor (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0876
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to bottom of offset I beam with Z-bar extensions w/ additional gypsum (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-1/2")
-
HW-D-0875
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to bottom of fire-proofed steel beam (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-5/8")
-
HW-D-0882
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete over metal deck (parallel) (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1/2")
-
HW-D-0883
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to bottom of fire-proofed steel beam (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1/2")
-
C-AJ-2835 (US Only)
- Assembly rating: 3 Hour
- Max. 18" PVC or CPVC (c,v) (AS=1/4" to 1-1/2")
-
HI/BPF 120-20
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 4-1/2")
-
HI/BPF 120-21
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Back Pan and Aluminum Framing with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5")
-
C-AJ-2885
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) & CP 643N Firestop Collar with one or more Max. 6" PVC, CPVC or RNC through concrete floor/wall or block wall (min.4-1/2")
-
F-C-2508 (US Only)
- Assembly rating: 1 Hour
- Max. 2" Polypropylene (PP-R, PP-RCT) (AS=0" to 1") (FS-ONE MAX only)
-
C-BJ-3043
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (top side access)
-
HW-S-0134
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum Wall to bottom of offset I beam with Z-bar extensions with CFS-TTS MD Top Track Seal (Max. JW=1-1/2")
-
F-C-2516
- Assembly rating: 1 Hour
- Maximum 4" PVC, CPVC, or RNC (c,v) (AS varies) (CP CP 648E or 648S wrap insert & FS-ONE MAX)
-
W-L-2768 (US Only)
- Assembly rating: 1 Hour
- Max. 3" PVC cleanout with nominal 6-1/2" escutcheon plate. (CP 648E Wrap Strip & CP 617 Putty Pad)
-
W-L-2741
- Assembly rating: 2 Hour
- Max. 14" PVC or CPVC (c,v) (AS=1/2" to 1-1/2")
-
W-L-8125
- Assembly rating: 2 Hour
- Maximum 24"x4" aluminum cable tray and cable bundles (various cables) through speed sleeve or cable collar with CFS-COS Firestop Composite Sheet and CFS-BL Firestop Block.
-
W-J-8078
- Assembly rating: 2 Hour
- Maximum 24"x4" aluminum cable tray and cable bundles (various cables) through speed sleeve or cable collar with CFS-COS Firestop Composite Sheet and CFS-BL Firestop Block.
-
HI/BPF 120-17
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Aluminum Framing (Max JW = 4")
-
HI/BPF 120-25
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Precast Concrete Panel Curtain Wall with CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 3").
-
C-AJ-8316
- Assembly rating: 3 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) and cable bundle with CFS-CC Firestop Cable Collar or metallic penetrant through concrete floor or block wall (min.4-1/2")
-
C-AJ-8313
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet & CP 643N Firestop Collar with one or more Max. 6" PVC, or RNC & CFS-CC 4" Firestop Cable Collar, CP 653 4", or CFS-SL GA with cable bundle through concrete floor/wall or block wall (min.4-1/2")
-
HW-D-0886
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (parallel & perpendicular) With CFS-TTS MD Top Track Seal and structural steel beams or bar joists penetrating wall (top-of-wall) with CFS-SIL GG Firestop Silicone Sealant (Max. JW=1")
-
C-AJ-2898 (US Only)
- Assembly rating: 3 Hour
- Max. 8" Polybutylene (PB) Plastic Pipe through a concrete floor or wall.
-
W-L-7319
- Assembly rating: 2 Hour
- Max. 24" x 48" sheet metal duct (w/o damper) (Shaft Wall) (one sided) (AS=0" to 1")
-
W-J-7184
- Assembly rating: 2 Hour
- Max. 24" x 48" sheet metal duct (w/o damper) (one sided) (AS=0" to 1")
-
HW-S-0145
- Joint type: Head-of-Wall
- Assembly rating: 1 Hour
- Gypsum wall to wood floor/ceiling assembly with CP 605 Bottom of Wall Firestop Sealant(Max. JW=1/2")
-
F-C-7086
- Assembly rating: 1 Hour
- Max. 6" diameter sheet metal duct w/o damper penetrating ceiling (min 30Ga) (AS=0" to 1")
-
C-AJ-5444
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet (rigid foil-faced intumescent sheet with stainless steel backing) & HILTI CP 648E and retaining Collar with one or more Max. 4" insulated metallic penetrants through concrete floor/wall or block wall (min.4-1/2")
-
HW-D-0933
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.) (top-of-wall) with CFS-TTS MD Top Track Seal and CP 620 Fire Foam (Max. JW=1-5/8")
-
HW-D-0932
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.)(perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal and CP 620 Fire Foam (Max. JW=1-1/2")
-
HW-D-0934
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (Epic Metals Corp, New Millennium Building Systems LLC, Verco Decking Inc., or Vulcraft, Div of Nucor Corp.) (diagonal or offset to flutes) CFS-TTS MD Top Track Seal and CP 620 Fire Foam (Max. JW=1-7/8")
-
HW-D-0931
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor or hollow core (top-of-wall) (Max. JW=1")
-
W-L-5379 (US Only)
- Assembly rating: 2 Hour
- Max. 12" PVC or CPVC (closed or vented) with maximum 1-1/2" Glass-Fiber Insulation (CP 648E wrap Strip and Z-Frame)(AS= 0" to 1-1/2")
-
WW-D-0270
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Optional one side installation) (Max. JW=2")
-
HW-D-0929
- Joint type: Head-of-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete floor using CFS-SP WB Firestop Joint Spray without overlap. (Max. JW=1")
-
WW-D-0269
- Joint type: Wall-to-Wall
- Assembly rating: 3 Hour
- Concrete or block wall to concrete or block wall Using CFS-SP WB Firestop Joint Spray without overlap. (Max. JW=1")
-
HI/PF 120-07
- Assembly rating: 2 Hour
- HVAC line set through Mass Timber Floor or Wall.
-
HI/PF 120-08
- Assembly rating: 2 Hour
- Cable bundle (various cables) through Mass Timber Floor or Wall.
-
HI/PF 120-11
- Assembly rating: 2 Hour
- Nominal 6" Steel, Iron, Copper, Steel Conduit, or EMT (AS=1/2" to 1-7/16") through Mass Timber Floor or Wall
-
FW-D-0101
- Joint type: Floor-to-Wall
- Assembly rating: 3 Hour
- Concrete floor to wall joint (Max. JW=1")
-
W-L-5381
- Assembly rating: 2 Hour
- Maximum 4" diameter steel pipe or cast or ductile iron pipe wrapped in HILTI CFP-ES ENDO-SHIELD. (mineral wool and HILTI FS-ONE MAX) (AS= 0" to 1-5/8")
-
C-AJ-5450
- Assembly rating: 2 Hour
- Max. 4" steel (Sch. 10 or heavier) or Iron pipe continuously wrapped in HILTI CFP-ES ENDO-SHIELD. (Mineral Wool + FS-ONE MAX) (AS = min. 1/2" to max. 1-1/4")
-
W-J-1327
- Assembly rating: 2 Hour
- one or more Steel Conduit or EMT intalled within a opening. (CP 660 Firestop Foam)
-
W-L-1603
- Assembly rating: 2 Hour
- one or more Steel Conduit or EMT intalled within a opening. (CP 660 Firestop Foam)
-
HW-D-0945 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ optional spray-on fireproofing (perpendicular) (top-of-wall) with CFS-TTS MD Top Track Seal. When fireproofing is not used optional PVC, CPVC, or RNC may be installed through top of wall. (Max. JW=1-1/4")
-
W-L-2818 (US Only)
- Assembly rating: 2 Hour
- Max 3" PVC, CPVC, or RNC with 90° fitting (membrane penetration) (AS=3/8" to 1-1/4")
-
FF-D-1216
- Joint type: Floor-to-Floor
- Assembly rating: 3 Hour
- Concrete floor to floor joint with CFS-SP SIL Firestop Silicone Joint Spray (Max. JW=3")
-
HI/BPF 120-31
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Perimeter support angles, and aluminum framing. Treated with CFS-EOS QS Edge of Slab Quick Seal. (Max. JW = 5")
-
HI/BPF 120-32
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Glass Spandrel Panel with Perimeter support angles, and aluminum framing. Treated with CFS-EOS QS Edge of Slab Quick Seal. (Max. JW = 5")
-
F-A-5076
- Assembly rating: 2 Hour
- Max. 8" steel or cast iron, with nominal 1" thickness glass-fiber or mineral-fiber pipe insulation through CFS-CID M [8" or 10"] Cast-In Device.
-
F-A-1202
- Assembly rating: 2 Hour
- Max. 10" steel or cast iron pipe, Max. 6" steel conduit, or Max. 4" copper pipe/tubing through CFS-CID M [8" or 10"] Cast-In Device
-
HW-S-0037
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (Parallel) (top-of-wall) (Max. JW=3/4")
-
HW-S-0039
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (top-of-wall) (Max. JW=3/4")
-
C-AJ-5432 (US Only)
- Assembly rating: 2 Hour
- Nominal 12" Diameter Polypropylene (PP-R/PP-RTC) pipe (closed piping only) with Maximum 2"Glass Fiber or Mineral Fiber Insulation (AS= 1/2" to 1-1/8") (CFS-BL Firestop Blocks)
-
W-L-3483
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together to completely fill CFS-MSL GPP Pre-Drywall Ganging Plate.
-
W-J-3277
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together to completely fill CFS-MSL GPR Retrofit Ganging Plate.
-
W-L-3481
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together to completely fill CFS-MSL GPR Retrofit Ganging Plate.
-
F-A-3085
- Assembly rating: 3 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together to completely fill rows in CFS-FGR Floor Grid.
-
W-J-3278
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeve.
-
W-J-3279
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together and secured within the wall with CFS-MSL GPA Adjustable Gangplate
-
W-L-3482
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeve.
-
W-L-3484
- Assembly rating: 2 Hour
- Cable penetrations (0% to max 100% visual fill) through CFS-MSL [S,M, or L] modular sleeves. Modular sleeves ganged together and secured within the wall with CFS-MSL GPA Adjustable Gangplate
-
F-G-2001
- Assembly rating: 2 Hour
- Max. 6" PVC (Sch. 40) or CPVC (SDR 13.5) (Closed or vented piping system) through a mass timber floor assembly using CFS-DID MD or CFS-DID C Drop-In Device
-
C-AJ-3069
- Assembly rating: 1 Hour
- Cable bundle (Consisting of Max 7/C No. 12 AWG cables with PVC or XLPE insulation and jacket) through concrete floor or wall with mineral wool and HILTI FS-ONE MAX Intumescent firestop sealant.
-
C-AJ-8318 (US Only)
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet through concrete floor/wall or block wall (min.4-1/2"). Penetrants include: 6" smaller PVC, CPVC, or RNC; 4" or smaller Steel, Cast Iron, steel conduit, or EMT; 2" or smaller copper; 4" or smaller cable bundle.
-
HW-D-0964 (US Only)
- Joint type: Head of wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (Parallel) (top-of-wall) with CFS-TTS MD Top Track Seal. Optional PVC, CPVC, or RNC may be installed through top of wall. (Max. JW=1-1/4")
-
HI/BPF 120-33
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Mass Timber Floor assembly to Mass Timber Panel Wall assembly with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
HI/BPF 120-34
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Mass Timber Floor Assembly or Lightweight or Normal Weight Concrete Floor Assembly to Mass Timber Panel Wall assembly with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
HI/BPF 120-36
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Mass Timber Floor Assembly or Lighweight or Normal Weight Concrete Floor Assembly to Concrete Spandrel Panel with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
HI/BPF 180-03
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Mass Timber Floor assembly to Mass Timber Panel Wall assembly with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
HI/BPF 180-04
- Joint type: Curtain Wall
- Assembly rating: 3 Hour
- Mass Timber Floor Assembly to Concrete Spandrel Panel with Mineral Wool and CFS-EOS QS Edge of Slab Quick Seal (Max. JW = 5").
-
C-AJ-0183
- Assembly rating: 2 Hour
- Max. 160 sq. in. blank opening with max. dimension of 32".
-
W-J-2397
- Assembly rating: 2 Hour
- Max. 4" PVC, or CPVC (Sch. 40 or Sch. 80) (closed or vented) (Steel Sleeve, CP 648E Wrap Strip, Mineral Wool and FS-ONE MAX) (AS=Min 1/2" Max 3")
-
W-J-5213
- Assembly rating: 2 Hour
- Max. 2" diameter copper pipe or tube with max. 1-1/2" AB/PVC insulation (Sealant, Wrap Strip, & Retaining Collar)
-
WW-S-0097
- Joint type: Wall-to-Wall
- Assembly rating: 2 Hour
- Concrete wall to wall joint (Max. JW=1") (Exterior side sealed with 790 or 795 Dow Sealant, Pensil 300 Sealant, or Dynatrol II caulk or 864 Pecora Sealant) (Interior side sealed with CFS-TTS MD OS or CFS-TTS MD 600).
-
W-J-8101
- Assembly rating: 2 Hour
- HVAC Line Set (5/8" depth of FS-ONE MAX only) (AS=0" to 1/2")
-
W-L-2842
- Assembly rating: 2 Hour
- Max. 4" PVC, or CPVC (Sch. 40 or Sch. 80) (closed or vented) (Steel Sleeve, CP 648E Wrap Strip, Mineral Wool and FS-ONE MAX) (AS=Min 1/2" Max 3")
-
W-L-8142
- Assembly rating: 2 Hour
- One or more HVAC Line Set (5/8" depth of FS-ONE MAX only)
-
FF-D-0161
- Joint type: Floor-to-Floor
- Assembly rating: 2 Hour
- Concrete floor to floor joint with CFS-TTS MD OS or CFS-TTS MD 600 Firestop Top Track Seal (Max. JW= 1-1/8")
-
HW-D-0965
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Concrete wall or CMU Block wall to Concrete Floor joint with CFS-TTS MD OS or CFS-TTS MD 600 Firestop Top Track Seal (Max. JW= 1-1/8")
-
F-A-3088
- Assembly rating: 2 Hour
- CFS-COS Firestop Composite Sheet with CFS-MSL Modular Sleeves and CP 653 Speed Sleeves. For each firestop device the cables may represent 0 to 100 percent visual fill.
-
F-A-1217
- Assembly rating: 3 Hour
- Max. 10" Steel, Iron, max. 6" steel conduit, or max 4" EMT pipe (AS= 0" to 1-1/2") (T-rating with HILTI CFP-ES ENDO-SHIELD)
-
W-J-2399 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC, or CPVC (Sch. 40 or Sch. 80) (Closed or Vented) with CP 648E & retaining Collar (AS = 0" to 3/8")
-
W-L-2844 (US Only)
- Assembly rating: 2 Hour
- Max. 6" PVC or CPVC plastic pipe (Closed or Vented) (Sch. 40 or Sch. 80) with CP 648E Firestop Wrap Strip and Retaining Collar. (AS = 0" to 3/8")
-
C-AJ-1173
- Assembly rating: 1 Hour
- Maximum 4" Aluminum Tubing (0.145" or heavier) wall thickness. (AS=3/8" to 1-5/8")
-
C-AJ-8335
- Assembly rating: 2 Hour
- HVAC line set with nom. 3/4" polyethylene insulation. (Tuck-in Wrap strip solution) (AS=min 3/8" to Max 1-1/2")
-
C-AJ-8336
- Assembly rating: 2 Hour
- HVAC line set with nom. 3/4" polyethylene insulation. (Tuck-in Wrap strip solution) (AS=min 3/8" to Max 1-1/2")
-
HW-D-0322
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall parallel to fluted metal deck with backing constructed of glass fiber batt insulation. (Max. JW=2-1/2")
-
F-C-2524
- Assembly rating: 1 Hour
- Maximum 2" PVC, CPVC, or RNC (Sch. 40 or Sch. 80) (Closed or Vented) CP 648E Wrap Strip & FS-ONE MAX
-
F-G-1001
- Assembly rating: 2 Hour
- Max 4" Steel, cast or ductile iron, steel conduit, or steel EMT throught mass timber floor assembly using mineral wool and sealant.
-
F-G-3001
- Assembly rating: 2 Hour
- Blank or cables through CP 653 or CFS-SL GA L Speed Sleeve (top side access) in CLT floor assembly.
-
CW-D-1052
- Joint type: Curtain Wall
- Assembly rating: 2 Hour
- Spandrel Panel (Glass, Aluminum, Stone, Vision panel) Curtain wall assembly with steel back pan and aluminum framing. (Max. JW = 4")
-
HW-D-0085 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck (includes Epic Metals deck) (top-of-wall) (Max. JW=3/4")
-
HW-D-0087 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over metal deck w/ optional use of spray-on fireproofing (top-of-wall) (Max. JW=2")
-
HW-D-0077 (US Only)
- Joint type: Head-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete over fluted metal deck (top-of-wall) (castle cut, gypsum cut to profile) (Max. JW=3/4")
-
HW-D-0969
- Joint type: Head of wall
- Assembly rating: 2 Hour
- Gypsum wall to Cross Laminated Timber Floor Assembly (top-of-wall) with CFS-TTS MD Top Track Seal (Max. JW=1-1/4")
-
F-A-2420 (US Only)
- Assembly rating: 2 Hour
- Nominal 4" diameter PVC (Sch. 40) drain pipe with PVC Closet flange through CFS-CID MD P Cast-In Device for Metal Deck.
-
W-L-3486
- Assembly rating: 2 Hour
- Hilti CFS-MSL Modular Firestop sleeve installed through Hilti CFS-COS Firestop Composite Sheet
-
W-L-7321
- Assembly rating: 2 Hour
- Maximum 18" x 18" steel service support member through a gypsum shaft wall assembly. (optional fills in steel member to include: concrete, grout, or mortar) (AS = min 1-1/2", max 5-1/4")
-
C-AJ-5457
- Assembly rating: 2 Hour
- Max. 4" steel (Sch. 40 or heavier), Cast Iron, or copper pipe with Nom. 1.5" AB/PVC insulation. (AS = 0" - 5/8")
-
W-J-8103
- Assembly rating: 2 Hour
- Misc. bundle consisting of cables, metal pipe, ENT, and dura-line microduct through CFS-MSL [S,M, or L] Modular Sleeve.
-
F-A-2421 (US Only)
- Assembly rating: 2 Hour
- Max. 10" PVC (c,v), CPVC (c) (Sch. 40) (AS = 0" to 1-7/16") (metal deck) (Sheet metal cover plate, CP 648E, Mineral Wool & FS-ONE MAX)
-
BW-S-0071
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall with resilient channel to concrete floor (Bottom-of-Wall)
-
BW-S-0068
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum wall to concrete floor (Bottom-of-Wall)
-
W-L-8143
- Assembly rating: 2 Hour
- Misc. bundle consisting of cables, metal pipe, ENT, or Microducts (0% to max 100% visual fill) through CFS-MSL [S, M, or L] modular sleeve.
-
BW-S-0069
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum chase (double stud) wall to concrete floor (Bottom-of-Wall)
-
BW-S-0070
- Joint type: Bottom-of-Wall
- Assembly rating: 2 Hour
- Gypsum shaft wall to concrete floor (Bottom-of-Wall)
- Access Agreement
- Privacy Policy
- Security
- Terms And Conditions
- Insurance
- California Privacy Statement
- California Prop 65
- SpeakUp for Business Partners
- No Surprises Act
- California Modern Slavery Statement
- CPVC Compatibility
- Hilti Patents
- Third Party Providers
- Phishing Notice
- Data Subject Rights Request