Skip to main content
Cart

Use of Hilti Method in Concrete-to-Concrete Module

Posted by Arvid Handegardover 2 years ago
Use of Hilti Method in Concrete-to-Concrete Module

The Hilti Method was selected as the calculation method in the input of the attached sample run. For surface treatment, the "Not roughened, Steel formed surface" was selected. In the conclusion portion (4. Warnings) it states that joint surface must be roughened. Please clarify.

Profis engineering software,surface prep

1 Reply
Posted by Ashley Couronover 2 years ago
Hilti Verified

Hi Arvid,

For further assistance, please email your ".pe" file to hnatechnicalservices@hilti.com.

Regards,
Ashley

concrete to concrete