Posted by Mike Bover 3 years ago
Post Installed Bar for Concrete Breakout
Can you add post-installed reinforcing perpendicular to the tension breakout cone of an anchor group to resist concrete breakout in tension? If the post-installed bar crosses the crack plane of the breakout cone, shear friction-type behavior can be achieved using the post-installed reinforcing bar, right?
1 Reply
Posted by Emily over 3 years ago
Hi Mike,
Please see this previous Ask Hilti response.
Regards,
Emily