Need to Epoxy Rebar into Footing through 30" CMU Stem Already Grouted

Posted by Aaron Muelleralmost 4 years ago
Need to Epoxy Rebar into Footing through 30" CMU Stem Already Grouted

I have a 30" tall CMU stem wall missing at least (22) #5 bars that need to get epoxied into the footing. Is there a better approach than removing the stem to drill 8" into the footing to epoxy? Does Hilti have a bit that would be suitable for this depth of a hole? Just looking for options

EPOXY,Footing

1 Reply
Posted by Samantha Burtalmost 4 years ago
Hilti Verified

Hi Aaron,

Please call Hilti’s Customer Service team, 1-800-879-8000, to discuss available core or hammer drill bit options for this application. If there is a suitable bit, feel free to email hnatechnicalservices@hilti.com to discuss adhesive anchors for this unique application.

Best,
Sam


1 comment on this reply
Posted by Aaron Muelleralmost 4 years ago
Thanks Sam. We'll reach out directly.