I am looking for installation instructions for chemical anchors in upward direction and load test instruction and device.

Posted by Mehdi Saberiabout 2 years ago
I am looking for installation instructions for chemical anchors in upward direction and load test instruction and device.

I used HILITI PROFIS software to design anchors for a powerhouse. the anchors will be installed upward in to concrete ceiling. the software proposed HIT-HY 200 V3+ HIT Z. each 4 anchors will connected to a base plate and support 10 kN of loads. I reached you out to get your advice about installation procedure in upward direction and pull out test procedure and devices.
Thanks and looking forward to herring from you
Mehdi Saberi
Klohn Crippen Berger

pull testing,concrete ceiling,direction

1 Reply
Posted by Ashley Couronabout 2 years ago
Hilti Verified

Hi Mehdi,

The overhead installation instructions for use for HIT-HY 200 V3 can be found here. Additionally, please refer to this previous response for information related to proof loading.

Regards,
Ashley

overhead installation