Posted by Mustafa Beroutiover 1 year ago
Hilti X-U MX shot pins (37MX & 42MX)
Plan page S1-3 detail 13, metal stud fastener schedule mark 1. 1 ½” shot pin min embed can only be
achieved if the track is predrilled and with 1 ¼” minimum embed per note 3, photos 1. Photos 2 struggles
to achieve, see conditions. Please confirm installation in photos 1 is acceptable. Note 1 5/8” shot pin
embed is unachievable depth, concrete to hard.
1 Reply
Posted by Matthew Fordover 1 year ago
Hi Mustafa,
Proper installation of the X-U is detailed in the Operating Instruction Hilti's website. Additional information on fastener clamping and nailhead stand-off may be found on page 21 of the Direct Fastening Technical Guide.
For questions related to fastener installation, please reach out to our technical service team at hnatechnicalservices@hilti.com.
Regards,
Matthew