Hammer Drilling Vs Core Drilling with Roughening Adhesive Capacity

Posted by Jake Effingeralmost 4 years ago
Hammer Drilling Vs Core Drilling with Roughening Adhesive Capacity

Can I use the hammer drilling adhesive bond capacity if the contractor would like to core drill a smaller pilot hole and then come back with a properly sized hammer drill to create that condition for better adhesive bonding?

Hammer Drilling Procedure,Core drill plus Hammer,adhesive bond capacity

2 Replies
Posted by Emily almost 4 years ago
Hilti Verified

Hi Jake,

For a case like this we have seen customers in the past run two different anchor calculations -- one using hammer drilled holes and one using core drilling -- and use the more conservative results. The decision of what drilling method that should be used for anchor calculations is ultimately up to the engineer of record since there is not specific testing for a partially core drilled and hammer drilled hole.

Cheers,
Emily


1 comment on this reply
Posted by DARREN MCGREGORalmost 2 years ago
We are looking at doing the same thing on a large project to save significant field time. Whom might I speak to in order to execute this properly? Thanks!

Posted by Matthew Fordalmost 2 years ago

Hi Darren,

For technical assistance, please reach out to hnatechnicalservices@hilti.com or give us a call at 877-749-6337.

Regards,
Matthew