Skip to main content
Cart

Change Embedment Depth of the Doweled Bars and Apply the Force per Dowel

Posted by E.Cover 3 years ago
Change Embedment Depth of the Doweled Bars and Apply the Force per Dowel

I need to check an existing wall - new slab connection using doweled bars. I am using the "Extensions" type of concrete-to-concrete connection.
1- How can I change the embedment length based on my requirements?
2- How can I change the force per meter length to force per dowel?
Please refer to the attached image.
Thanks

rebar dowel,Change Embedment Depth,force per dowel

1 Reply
Posted by Emily over 3 years ago
Hilti Verified

Hi E.C,

Since the design is being analyzed with CSA, please email your inquiry to CA.EngineeringTechnicalServices@hilti.com. Alternatively, posts can be made on Ask Hilti Canada.

Regards,
Emily

CSA,Canada,C2C