Can I use the CFS-TTS Firestop Top Track Seal when I have a 2" deflection requirement? This means the compressible material of your product needs to be longer than 2" to receive the gypsum wall board. Is that correct? Is this possible?
Hi Shawn - thanks for using AskHilti. I apologize for the extensive delay on the response here.
We would not recommend our CFS-TTS product for a joint with 2" deflection. Our CFS-TTS MD product could accommodate /- 50% compression/extension when installed in accordance with UL Listed System HW-D-0880. That would give you /- 1/2" movement (1" total) when installed in a nominal 1" joint width.
Hilti would not offer a firestopping product that could accommodate the 2" movement requested.
I hope this helps provide some clarity. Please let me know if you have any further questions or contact my team directly through the Hilti Construction Platform (HCP).
Hilti is proud to announce the launch of our engineering website, the HILTI CONSTRUCTION PLATFORM (HCP). This platform will be the home for all of your Fire Protection Engineering needs, including Engineering Judgment requests. You can find more information on how to access this new platform here: https://www.hilti.com/ej (US) or https://www.hilti.ca/ej (Canada.)
Best Regards,
Nate Crawford