Features & Applications

Features
  • Stand-off component provides a pre- or post-poured solution for water containment and riser clamp support of vertical pipe penetrations
  • Quick and easy installation, no special tools required
  • Stand-off component may be installed before or after the concrete is poured
Applications
  • Designed to meet requirements for a minimum 2" stand-off above substrate surface
  • Once installed, the completed application can provide an effective solution for fire protection, water containment and riser clamp support for vertical pipe penetrations
  • Support of vertical metal and plastic pipe clamps

Product Variants & Sets

Technical Data

Documents & Videos

Consulting & Support

Ratings & Reviews

Log in to proceed
Need help? Contact us
Register now
Contact us
Contact
Added to cart
Added to cart
Go to shopping cart