In a wood construction, larger openings on the ground floor are achieved by spanning steel beams. These beams need to be fireproofed for a 2 hour rating while the structure above is 1 hour rated in a peculiar case. We plan to use spray on fireproofing on the steel beams, but the top of the beam may not be sprayed on; as 2" of ...