We have an odd situation.
We have to build a double CMU wall for a 2hr fire separation, but there is an existing steel beam that we have to take out in order to build this wall. In order to do that we have to structurally support the roof, make the cut,, and build the CMU Wall. Is there a 2hr rating we can put on jus the one...